智算中心论文专站

AIDC Research Papers

Liquid Cooling AI Data Center Power & Thermal Systems
Current Issue

Volume 2026 · Issue 06-21

按期刊卷期页方式整理本期论文。每条仅使用日报已列出的可追溯公开来源,不新增未经核验事实。

Research Article芯片与算力

ScaleAcross Explorer: Exploring Communication Optimization for Scale-Across AI Model Training

Minghao Li、Alicia Golden、Samuel Hsia、Michael Kuchnik、Adi Gangidi、Xu Zhang、Ashmitha Jeevaraj Shetty、Zachary DeVito

Published 2026-05-23 · arXiv · Credibility S

The rapid scaling of large language model training requires distributing GPU resources across multiple data center buildings and regions. We refer to such paradigm as "scale-across" training. As infrastructure expands, the system design space becomes increasingly intricate, encompassing new model architectures, hardware heterogeneity, and evolving communication patterns. Drawing from Meta's production experience, we…

Abstract, interpretation and reference

Abstract

The rapid scaling of large language model training requires distributing GPU resources across multiple data center buildings and regions. We refer to such paradigm as "scale-across" training. As infrastructure expands, the system design space becomes increasingly intricate, encompassing new model architectures, hardware heterogeneity, and evolving communication patterns. Drawing from Meta's production experience, we highlight the complexities of deploying training jobs across a few data centers housing hundreds of thousands of GPUs. To accelerate exploration of the large design space and to enable efficient training for frontier model development, we conduct in-depth characterization of three key design dimensions: parallelism placement, parallelism scheduling, and network layer technologies. We then propose ScaleAcross Explorer, an optimizer that considers the interplay of design dimensions and holistically optimizes scale-across training. Testbed experiments and simulations demonstrate up to 64.62% training speedups over production configuration and up to 37.59% training speedups over the state-of-the-art baseline across a wide range of design points.

中文解读

背景:AI 数据中心负载、功率密度和能源约束同步上升,芯片、服务器和高密度算力部署正在成为智算中心设计的关键变量。问题:论文聚焦现有方案在效率、可靠性或工程协同上的瓶颈。方法:摘要显示作者采用建模优化、调度分析或算法评估,把运行负载、冷却/能源系统和基础设施约束放在同一分析框架中。结果:研究重点指向跨地域数据中心负载与电力资源之间的调度关系。意义:对日报读者而言,它可用于判断芯片路线和服务器密度变化如何传导到机房设计。仍需结合全文实验条件、样本范围和成本假设核验。

参考文献

Minghao Li, Alicia Golden, Samuel Hsia, 等. ScaleAcross Explorer: Exploring Communication Optimization for Scale-Across AI Model Training[J/OL]. (2026-05-23)[2026-06-21]. http://arxiv.org/abs/2605.24326v1.

Full text 中文海报
芯片与算力 论文图示
Research Article热管理与液冷

Maximizing Compute Capacity in AI Data Centers through Cooling, Energy Storage, and Computing Adaptation

Shaolei Ren、Mohammad A. Islam、Adam Wierman

Published 2026-05-30 · arXiv · Credibility S

The deployment of artificial intelligence is increasingly constrained by limited site-level power capacity, which must support both compute systems and non-compute systems (primarily cooling) at all times. Cooling power demand, especially in non-evaporative cooling systems, can increase substantially with ambient temperature in the summer, producing recurring periods of elevated cooling power that often lasts for mu…

Abstract, interpretation and reference

Abstract

The deployment of artificial intelligence is increasingly constrained by limited site-level power capacity, which must support both compute systems and non-compute systems (primarily cooling) at all times. Cooling power demand, especially in non-evaporative cooling systems, can increase substantially with ambient temperature in the summer, producing recurring periods of elevated cooling power that often lasts for multiple hours per day. Therefore, maximizing compute capacity under a limited site-level power budget is an important planning and operational challenge. Sizing the compute system conservatively based on peak cooling power can leave part of the site-level power capacity underutilized when the cooling power is below its peak, particularly in cooler months. On the other hand, sizing the compute system aggressively based on low cooling power can cause the total site-level power demand to exceed the site-level power capacity during hot days in the summer. This paper proposes ComputeAmp (Compute Amplifier), a framework that maximizes the compute capacity by jointly and dynamically leveraging cooling, battery energy storage, and computing-based adaptation. We discuss the opportunities and limitations of ComputeAmp and illustrate its potential to significantly expand usable compute capacity within local power and water resource limits. We also present a problem formulation for ComputeAmp and highlight a few algorithmic and operational challenges.

中文解读

背景:AI 数据中心负载、功率密度和能源约束同步上升,液冷、热管理和数据中心能效正在成为智算中心设计的关键变量。问题:论文聚焦现有方案在效率、可靠性或工程协同上的瓶颈。方法:摘要显示作者采用框架构建和频域/系统级分析,把运行负载、冷却/能源系统和基础设施约束放在同一分析框架中。结果:研究重点指向冷却效率、能源利用或运维策略的改进方向。意义:对日报读者而言,它可用于判断液冷方案、热管理路线和高密度部署节奏。仍需结合全文实验条件、样本范围和成本假设核验。

参考文献

Shaolei Ren, Mohammad A. Islam, Adam Wierman. Maximizing Compute Capacity in AI Data Centers through Cooling, Energy Storage, and Computing Adaptation[J/OL]. (2026-05-30)[2026-06-21]. http://arxiv.org/abs/2606.00457v1.

Full text 中文海报
热管理与液冷 论文图示
Research Article算电协同

Grid Capacity Expansion under Data Centers and Electrified Manufacturing Large Loads

Jiyong Lee、Melody Agustin、Joanne Langsdorf、Erhan Kutanoglu、Michael Baldea、Ilias Mitrai

Published 2026-05-28 · arXiv · Credibility S

In this paper, we consider the expansion of power grids under emerging large loads from data centers and electrified manufacturing. We develop a multi-period grid capacity expansion model to determine optimal investment profiles for power generation, storage, and transmission capacity while accounting for hourly power dispatch, such that electricity demand is satisfied and the total planning and operation cost is mi…

Abstract, interpretation and reference

Abstract

In this paper, we consider the expansion of power grids under emerging large loads from data centers and electrified manufacturing. We develop a multi-period grid capacity expansion model to determine optimal investment profiles for power generation, storage, and transmission capacity while accounting for hourly power dispatch, such that electricity demand is satisfied and the total planning and operation cost is minimized. We also propose a new modeling approach regarding the spatial distribution of demand from large loads. The model is used to analyze the expansion of a synthetic grid that follows key characteristics of the ERCOT system over a seven-year planning horizon, under loads from data centers and electrified oil refining, which account for 17.5% and 4.7% of total annual electricity demand by the end of the planning horizon. The optimal investment policy leads to an 83.6% increase in generation capacity and exploits the short construction times of solar and storage as well as the operational flexibility of thermal generators. Finally, sensitivity analysis reveals that the construction time of grid assets substantially impacts investment timing, generation technology mix, and transmission capacity expansion. The proposed modeling framework is general and can be extended to other grid systems, enabling the exploration of diverse demand scenarios, policy assumptions, and regional characteristics.

中文解读

背景:AI 数据中心负载、功率密度和能源约束同步上升,算力负载与电网侧资源的协同调度正在成为智算中心设计的关键变量。问题:论文聚焦现有方案在效率、可靠性或工程协同上的瓶颈。方法:摘要显示作者采用框架构建和频域/系统级分析,把运行负载、冷却/能源系统和基础设施约束放在同一分析框架中。结果:研究重点指向AI 负载波动对电网设备寿命和调频边界的影响。意义:对日报读者而言,它可用于判断智算中心建设是否受电网容量、负载波动和调度机制约束。仍需结合全文实验条件、样本范围和成本假设核验。

参考文献

Jiyong Lee, Melody Agustin, Joanne Langsdorf, 等. Grid Capacity Expansion under Data Centers and Electrified Manufacturing Large Loads[J/OL]. (2026-05-28)[2026-06-21]. http://arxiv.org/abs/2605.29053v2.

Full text 中文海报
算电协同 论文图示
Research Article余热回收

Data Center Life Cycle Co-Design Optimization

Shrenik Jadhav、Vidhyashree Nagaraju、Zheng Liu

Published 2026-06-14 · arXiv · Credibility S

Liquid cooled supercomputers dissipate tens of megawatts of waste heat through cooling plants organized as parallel subloops that serve coolant distribution units. The number of subloops and the assignment of units to them are design decisions fixed at construction, yet they have not been systematically optimized for facilities at this scale. As electricity grids decarbonize, embodied carbon becomes a larger share o…

Abstract, interpretation and reference

Abstract

Liquid cooled supercomputers dissipate tens of megawatts of waste heat through cooling plants organized as parallel subloops that serve coolant distribution units. The number of subloops and the assignment of units to them are design decisions fixed at construction, yet they have not been systematically optimized for facilities at this scale. As electricity grids decarbonize, embodied carbon becomes a larger share of facility life cycle emissions and the cost of an unnecessary subloop becomes harder to justify. We present a framework that integrates operational energy from a validated control optimizer based on sequential least squares programming, embodied carbon from a bill of materials, and expected unplanned downtime from a per subloop reliability model. The framework is applied to the Frontier supercomputer, evaluating all 611 ways of partitioning its 25 coolant distribution units into two through six subloops. The life cycle cost and carbon optimum is found at two subloops holding 14 and 11 units, achieving 3,320.7 tonnes of carbon dioxide equivalent and $3.99 million over a seven year horizon, a saving of 50.2 tonnes and $100,000 compared to built four subloop configuration. The optimum remains on the Pareto front in all 15 scenarios of a one at a time sensitivity sweep. A semi-analytical decision rule generalizes the result, predicting four subloops for Aurora, two for El Capitan, and one for LUMI. When reliability is treated as a hard constraint set by operations policy, the four subloop Frontier deployment is consistent with the constrained optimum.

中文解读

背景:AI 数据中心负载、功率密度和能源约束同步上升,余热回收、热泵耦合和二次能源利用正在成为智算中心设计的关键变量。问题:论文聚焦现有方案在效率、可靠性或工程协同上的瓶颈。方法:摘要显示作者采用综述归纳和指标比较,把运行负载、冷却/能源系统和基础设施约束放在同一分析框架中。结果:研究重点指向AI 负载波动对电网设备寿命和调频边界的影响。意义:对日报读者而言,它可用于判断数据中心余热能否从成本项转化为能源资产。仍需结合全文实验条件、样本范围和成本假设核验。

参考文献

Shrenik Jadhav, Vidhyashree Nagaraju, Zheng Liu. Data Center Life Cycle Co-Design Optimization[J/OL]. (2026-06-14)[2026-06-21]. http://arxiv.org/abs/2606.15408v1.

Full text 中文海报
余热回收 论文图示
Research Article算电协同

Spatial Load Correlation in AI Data-Center-Dominated Power Systems

Chandan Chaudhary、Alaaeldein Abdelkader、Yansong Pei、Mohammed Benidris、Joydeep Mitra

Published 2026-06-12 · arXiv · Credibility S

The proliferation of large-scale data centers introduces spatially correlated demand profiles that challenge the long-standing assumption of statistical independence of loads in power system analysis. This paper examines the emergence of such load correlations and evaluates their impact on data-center-dominated grids. Analytical derivations reveal that correlated load fluctuations amplify aggregate stochastic distur…

Abstract, interpretation and reference

Abstract

The proliferation of large-scale data centers introduces spatially correlated demand profiles that challenge the long-standing assumption of statistical independence of loads in power system analysis. This paper examines the emergence of such load correlations and evaluates their impact on data-center-dominated grids. Analytical derivations reveal that correlated load fluctuations amplify aggregate stochastic disturbances, reduce voltage stability margins through weakened reactive power stiffness, and degrade frequency stability margin by erosion of natural load diversity effects. Real-time digital simulation studies confirm that moderate spatial correlation in distributed data centers produces simultaneous frequency deviations and voltage fluctuations across multiple buses. The findings offer transmission system operators a physics-based perspective to interpret emerging oscillatory phenomena and establish stability planning criteria grounded in measurable load-correlation structures rather than traditional diversity assumptions.

中文解读

背景:AI 数据中心负载、功率密度和能源约束同步上升,算力负载与电网侧资源的协同调度正在成为智算中心设计的关键变量。问题:论文聚焦现有方案在效率、可靠性或工程协同上的瓶颈。方法:摘要显示作者采用仿真建模和情景分析,把运行负载、冷却/能源系统和基础设施约束放在同一分析框架中。结果:研究重点指向AI 负载波动对电网设备寿命和调频边界的影响。意义:对日报读者而言,它可用于判断智算中心建设是否受电网容量、负载波动和调度机制约束。仍需结合全文实验条件、样本范围和成本假设核验。

参考文献

Chandan Chaudhary, Alaaeldein Abdelkader, Yansong Pei, 等. Spatial Load Correlation in AI Data-Center-Dominated Power Systems[J/OL]. (2026-06-12)[2026-06-21]. http://arxiv.org/abs/2606.13853v1.

Full text 中文海报
算电协同 论文图示
Research Article算电协同

GridPilot: Real-Time Grid-Responsive Control for AI Supercomputers

Denisa-Andreea Constantinescu、David Atienza

Published 2026-05-26 · arXiv · Credibility S

At global scale, data-center electricity demand is growing faster than the grids that supply it, while system operators increasingly require large flexible loads that can adjust power within seconds to absorb variable wind and solar generation. For multi-megawatt AI/HPC facilities, the key unresolved question is practical and measurable: how quickly can the software stack translate a grid request into a real change …

Abstract, interpretation and reference

Abstract

At global scale, data-center electricity demand is growing faster than the grids that supply it, while system operators increasingly require large flexible loads that can adjust power within seconds to absorb variable wind and solar generation. For multi-megawatt AI/HPC facilities, the key unresolved question is practical and measurable: how quickly can the software stack translate a grid request into a real change in GPU power at the facility meter, where commitments are settled? We answer this on real hardware with GridPilot, a three-tier predictive controller operating across milliseconds, seconds, and hours, augmented by a deterministic safety-island bypass for fast response. On a three-GPU NVIDIA V100 testbed, GridPilot achieves a measured end-to-end trigger-to-target response of 97.2 ms, which is 6.9x faster than the 700 ms requirement of Nordic Fast Frequency Reserve. We further incorporate an instantaneous Power Usage Effectiveness (PUE) correction so dispatched commitments remain robust at meter level rather than only at IT load level. In replay experiments across six representative European grids (from Sweden to Poland), the PUE-aware controller closes 2.5-5.8 percentage points of cooling-overhead drag. GridPilot is released as open source and serves as a proof of concept that MW-scale AI/HPC demand can be engineered as controllable, grid-responsive flexibility by design.

中文解读

背景:AI 数据中心负载、功率密度和能源约束同步上升,算力负载与电网侧资源的协同调度正在成为智算中心设计的关键变量。问题:论文聚焦现有方案在效率、可靠性或工程协同上的瓶颈。方法:摘要显示作者采用实验验证、原型测试或测量对比,把运行负载、冷却/能源系统和基础设施约束放在同一分析框架中。结果:研究重点指向AI 负载波动对电网设备寿命和调频边界的影响。意义:对日报读者而言,它可用于判断智算中心建设是否受电网容量、负载波动和调度机制约束。仍需结合全文实验条件、样本范围和成本假设核验。

参考文献

Denisa-Andreea Constantinescu, David Atienza. GridPilot: Real-Time Grid-Responsive Control for AI Supercomputers[J/OL]. (2026-05-26)[2026-06-21]. http://arxiv.org/abs/2605.26384v1.

Full text 中文海报
算电协同 论文图示
Research Article算电协同

From Accounting to Coordination: A Virtual Water-Aware Electricity-Computation-Water Nexus Framework for Data Center Dispatch

Haiyang You、Chengwei Lou、Jin Zhao、Yue Zhou、Lu Zhang、Jin Yang

Published 2026-05-25 · arXiv · Credibility S

The expansion of data centers (DCs) drives a sustained increase in electricity demand and associated water withdrawals at generation sites. These withdrawals occur at generation sites and are virtually allocated to demand based on network power flows. Consequently, the actual water footprint of a specific load varies dynamically with generation dispatch and network conditions. Existing approaches typically rely on s…

Abstract, interpretation and reference

Abstract

The expansion of data centers (DCs) drives a sustained increase in electricity demand and associated water withdrawals at generation sites. These withdrawals occur at generation sites and are virtually allocated to demand based on network power flows. Consequently, the actual water footprint of a specific load varies dynamically with generation dispatch and network conditions. Existing approaches typically rely on static statistical accounting to quantify these water footprints. However, such static methods fail to capture how dispatch optimization and workload relocation dynamically affect water withdrawals. As a result, static statistical accounting approaches remain decoupled from the optimization process, rendering them incapable of guiding workload relocation or power dispatch to mitigate water stress. To address this limitation, this paper develops an operational electricity-computation-water (ECW) nexus framework that internalizes virtual water impacts directly into power system dispatch. The framework represents dispatch optimization as a differentiable optimization layer embedded within a deep learning architecture, enabling efficient end-to-end learning of coordination policies while preserving operational feasibility. Combined with fixed-point coordination, the framework enforces consistency between virtual water attribution and physical generation-side withdrawals. Case studies on the IEEE 30-bus and 118-bus test systems demonstrate reliable convergence, exact power-water consistency, and reductions of approximately 3-5% in generation-related freshwater withdrawals under water-constrained conditions.

中文解读

背景:AI 数据中心负载、功率密度和能源约束同步上升,算力负载与电网侧资源的协同调度正在成为智算中心设计的关键变量。问题:论文聚焦现有方案在效率、可靠性或工程协同上的瓶颈。方法:摘要显示作者采用建模优化、调度分析或算法评估,把运行负载、冷却/能源系统和基础设施约束放在同一分析框架中。结果:研究重点指向跨地域数据中心负载与电力资源之间的调度关系。意义:对日报读者而言,它可用于判断智算中心建设是否受电网容量、负载波动和调度机制约束。仍需结合全文实验条件、样本范围和成本假设核验。

参考文献

Haiyang You, Chengwei Lou, Jin Zhao, 等. From Accounting to Coordination: A Virtual Water-Aware Electricity-Computation-Water Nexus Framework for Data Center Dispatch[J/OL]. (2026-05-25)[2026-06-21]. http://arxiv.org/abs/2605.25854v1.

Full text 中文海报
算电协同 论文图示
Research Article算电协同

Peer-to-Peer Cloud Service Market for Data Centers Oriented to Computation-Electricity Coordination

Yugui Liu、Yibo Ding、Xudong Li、Jing Qu、Wenyi Zhang、Tong Qian、Wuyou Xiao、Zhengyang Hu

Published 2026-06-03 · arXiv · Credibility S

Energy-intensive data centers (DCs) have emerged as substantial and flexible loads in modern power systems, underscoring the critical need for computation-electricity coordination. Harnessing the spatio-temporal flexibility of DC workloads is a promising approach to facilitate this coordination. However, existing studies overlook the collaborative potential of computational resource sharing among geo-distributed DCs…

Abstract, interpretation and reference

Abstract

Energy-intensive data centers (DCs) have emerged as substantial and flexible loads in modern power systems, underscoring the critical need for computation-electricity coordination. Harnessing the spatio-temporal flexibility of DC workloads is a promising approach to facilitate this coordination. However, existing studies overlook the collaborative potential of computational resource sharing among geo-distributed DCs, thereby failing to fully unlock this flexibility. In this paper, a bi-level computation-electricity coordination framework is proposed to explicitly capture the bidirectional interactions between DCs and power grid. Firstly, a peer-to-peer cloud service market (P2P-CSM) for geo-distributed DCs is proposed, which enables bilateral cloud service transactions to leverage regional heterogeneities (e.g., electricity prices, cooling efficiency). Secondly, locational marginal prices are embedded into the framework to reflect network congestion and nodal price disparities. Thirdly, a dual consensus alternating direction method of multipliers (ADMM)-based decentralized algorithm is developed as the P2P market clearing algorithm, and a bisection-assisted iterative algorithm is proposed to ensure rigorous convergence of the framework. Case studies conducted on modified IEEE 30-bus system validate that the P2P-CSM achieves a win-win computation-electricity coordination: it not only increases total DC operational profit by 22.8\%, but also effectively alleviates grid congestion and yields a 3.2\% reduction in total energy consumption.

中文解读

背景:AI 数据中心负载、功率密度和能源约束同步上升,算力负载与电网侧资源的协同调度正在成为智算中心设计的关键变量。问题:论文聚焦现有方案在效率、可靠性或工程协同上的瓶颈。方法:摘要显示作者采用框架构建和频域/系统级分析,把运行负载、冷却/能源系统和基础设施约束放在同一分析框架中。结果:研究重点指向AI 负载波动对电网设备寿命和调频边界的影响。意义:对日报读者而言,它可用于判断智算中心建设是否受电网容量、负载波动和调度机制约束。仍需结合全文实验条件、样本范围和成本假设核验。

参考文献

Yugui Liu, Yibo Ding, Xudong Li, 等. Peer-to-Peer Cloud Service Market for Data Centers Oriented to Computation-Electricity Coordination[J/OL]. (2026-06-03)[2026-06-21]. http://arxiv.org/abs/2606.04981v1.

Full text 中文海报
算电协同 论文图示