Research Article算电协同

Exploiting the Benefits of V2B Application on Peak Shaving of Data Center Loads

Arya Joshi、Hamed Haggi、Chinmay Morankar

Published 2026-09-01 · arXiv · Credibility S

The accelerated growth in data center projects has introduced a demand-driven bottleneck throughout power grids and contributed to a substantial increase in carbon emissions. These concerns are fueling discussions on methods to use existing energy assets to drive operational efficiency. To this end, this paper explores the benefits of Vehicle-to-Building (V2B) applications to support peak shaving of data center cool…

Abstract, interpretation and reference

Abstract

The accelerated growth in data center projects has introduced a demand-driven bottleneck throughout power grids and contributed to a substantial increase in carbon emissions. These concerns are fueling discussions on methods to use existing energy assets to drive operational efficiency. To this end, this paper explores the benefits of Vehicle-to-Building (V2B) applications to support peak shaving of data center cooling loads. Initially, a literature review was conducted considering V2B constraints and optimization methods including SoC limitations, EV participation, tariffs, and building loads. This analysis was then used to develop a conceptual case study of a 10 MW data center in Loudoun County, VA by simulating a temperature-dependent load profile and adjusting the V2B participation of 40 commercial and passenger EVs. Simulation results indicate that, depending on seasonal variations in cooling load demands, strategic deployment of V2B assets between 12-5pm can offset gross cooling loads by 13-36%.

中文解读

背景:AI 数据中心负载、功率密度和能源约束同步上升,算力负载与电网侧资源的协同调度正在成为智算中心设计的关键变量。问题:论文聚焦现有方案在效率、可靠性或工程协同上的瓶颈。方法:摘要显示作者采用综述归纳和指标比较,把运行负载、冷却/能源系统和基础设施约束放在同一分析框架中。结果:研究重点指向AI 负载波动对电网设备寿命和调频边界的影响。意义:对日报读者而言,它可用于判断智算中心建设是否受电网容量、负载波动和调度机制约束。仍需结合全文实验条件、样本范围和成本假设核验。

参考文献

Arya Joshi, Hamed Haggi, Chinmay Morankar. Exploiting the Benefits of V2B Application on Peak Shaving of Data Center Loads[J/OL]. (2026-09-01)[2026-09-03]. http://arxiv.org/abs/2609.00204v1.

Full text 中文海报
算电协同 论文图示
Research ArticleAI 运维优化

Operations, Maintenance, and Industrial Scaling of MW-Class Orbital Data Centers

Slava G. Turyshev

Published 2026-08-27 · arXiv · Credibility S

Megawatt-class orbital data centers require continuous maintenance, replacement, inventory, and service capacity in addition to spacecraft power/thermal systems. We formulate an analytical lifecycle framework for permanent/transient failures, modular orbital replacement units, robotic servicing, spare inventory, scheduled technology refresh, correlated faults, cybersecurity, optional human support. The model combine…

Abstract, interpretation and reference

Abstract

Megawatt-class orbital data centers require continuous maintenance, replacement, inventory, and service capacity in addition to spacecraft power/thermal systems. We formulate an analytical lifecycle framework for permanent/transient failures, modular orbital replacement units, robotic servicing, spare inventory, scheduled technology refresh, correlated faults, cybersecurity, optional human support. The model combines nonhomogeneous component hazards, capacity-weighted availability, multiclass robotic-service capacity, Poisson base-stock inventory, replacement-flow accounting, human-support break-even relations. For a 1 MW cluster with 10 active 100 kW nodes, 1 reserve node, ~200 5 kW compute cartridges, low, nominal, high deployed-mass allocations span ~50-75 kg/kW. Assumptions yield 70.2 random or life-limited interventions and 323-349 planned refresh operations/(MW-year), for a total of 393-419 standardized operations/(MW-year). Analysis gives a first-generation logistics of 5.3-9.0 t/(MW-year), with a nominal case of ~ 6.6 t/(MW year), 560-700 productive robot-hors/(MW-year). Planned refresh exceeds random replacement under the stated component populations, hazards, 3-15-year intervals. At ~400 standardized operations/(MW-year), the post-internal-recovery exception probability is <$10^{-3}$, with an objective near $10^{-4}$ at large scale; terminal non-recovery $p_U$ requires a smaller mission-level allocation. The target catastrophic-loss hazard for a 100 kW node is 0.01-0.03 1/yr. Parametric workload and cost cases place contingency visits at 10s of MWs, periodic campaigns at 10-100s of MWs, dedicated personnel at several 100 MWs to GWs. The reference first deployment is uncrewed, autonomously fault-managed, robotically maintainable, supported by specific inventory based on a 6-month replenishment horizon, compatible with later human access without permanent habitation.

中文解读

背景:AI 数据中心负载、功率密度和能源约束同步上升,AI 运维、负载预测和设施调优正在成为智算中心设计的关键变量。问题:论文聚焦现有方案在效率、可靠性或工程协同上的瓶颈。方法:摘要显示作者采用框架构建和频域/系统级分析,把运行负载、冷却/能源系统和基础设施约束放在同一分析框架中。结果:研究重点指向能效评价口径、运营指标和优化目标的系统化梳理。意义:对日报读者而言,它可用于判断AI 工具是否能降低运维复杂度并提升可用性。仍需结合全文实验条件、样本范围和成本假设核验。

参考文献

Slava G. Turyshev. Operations, Maintenance, and Industrial Scaling of MW-Class Orbital Data Centers[J/OL]. (2026-08-27)[2026-09-03]. http://arxiv.org/abs/2608.27499v1.

Full text 中文海报
AI 运维优化 论文图示
Research Article热管理与液冷

Predictive Failure Detection in Network Hardware Using Thermal Imaging and Deep Learning with Sensor Fusion

Ashly Joseph

Published 2026-08-05 · arXiv · Credibility S

Unplanned network hardware malfunctions can interrupt services and result in expensive downtime in data centers. A deep learning-based predictive maintenance strategy is presented that utilizes thermal imaging and power sensor data to detect early indicators of equipment breakdown in routers, switches, and servers. A simulated dataset was generated comprising annotated thermal pictures and power readings indicative …

Abstract, interpretation and reference

Abstract

Unplanned network hardware malfunctions can interrupt services and result in expensive downtime in data centers. A deep learning-based predictive maintenance strategy is presented that utilizes thermal imaging and power sensor data to detect early indicators of equipment breakdown in routers, switches, and servers. A simulated dataset was generated comprising annotated thermal pictures and power readings indicative of three operating states: Normal, Warning, and Critical. Three ImageNet-pretrained convolutional neural network (CNN) models ResNet-50, InceptionV3, and VGG16 were assessed together with a multi-modal CNN-LSTM fusion model that integrates visual and sensor time-series information. Experiments were performed with and without pre-processing procedures, including region-of-interest (ROI) extraction and normalization. In the absence of pre-processing, CNNs attained moderate accuracy (e.g., ResNet-50 at 52%), but ROI-based pre-processing significantly enhanced performance (ResNet-50 accuracy reaching 91%). The CNN-LSTM model attained the greatest accuracy of 94%, with precision and recall approaching 95%, illustrating the effectiveness of multi-modal fusion. The results validate that domain-specific pre-processing and sensor fusion substantially improve early failure prediction, providing a potential foundation for proactive maintenance of network hardware through non-intrusive monitoring.

中文解读

背景:AI 数据中心负载、功率密度和能源约束同步上升,液冷、热管理和数据中心能效正在成为智算中心设计的关键变量。问题:论文聚焦现有方案在效率、可靠性或工程协同上的瓶颈。方法:摘要显示作者采用框架构建和频域/系统级分析,把运行负载、冷却/能源系统和基础设施约束放在同一分析框架中。结果:研究重点指向冷却效率、能源利用或运维策略的改进方向。意义:对日报读者而言,它可用于判断液冷方案、热管理路线和高密度部署节奏。仍需结合全文实验条件、样本范围和成本假设核验。

参考文献

Ashly Joseph. Predictive Failure Detection in Network Hardware Using Thermal Imaging and Deep Learning with Sensor Fusion[J/OL]. (2026-08-05)[2026-09-03]. http://arxiv.org/abs/2608.07582v1.

Full text 中文海报
热管理与液冷 论文图示
Research Article算电协同

Flexible Training Workloads in Large-Scale AI Data Centers for Transient-Stability Support in Transmission-Constrained Power Systems

Jae-Kyeong Kim

Published 2026-08-31 · arXiv · Credibility S

The rapid expansion of large-scale artificial intelligence (AI) data centers is adding substantial, concentrated, and rapidly varying loads to transmission-constrained power systems. Although such load variations are generally regarded as operational challenges, this paper presents an alternative perspective in which the upward load flexibility of AI data centers could be coordinated for transient-stability support.…

Abstract, interpretation and reference

Abstract

The rapid expansion of large-scale artificial intelligence (AI) data centers is adding substantial, concentrated, and rapidly varying loads to transmission-constrained power systems. Although such load variations are generally regarded as operational challenges, this paper presents an alternative perspective in which the upward load flexibility of AI data centers could be coordinated for transient-stability support. To this end, this paper proposes training-induced load surge (TILS), a fast demand-side strategy that initiates or resumes flexible AI training workloads after fault clearing to increase active-power demand at electrically effective locations. The resulting load increase allows accelerating generators to supply additional electrical power, thereby reducing the accelerating-power imbalance and limiting the first-swing rotor-angle excursion. The underlying mechanism is first clarified in a single-machine infinite-bus (SMIB) system and then evaluated in the IEEE 39-bus system and a large-scale Korean power system. Results across all three systems demonstrate that TILS can increase the transient-stability-constrained generation limit. Larger responses, earlier activation, and siting at buses with a stronger electrical influence on the critical generators provide greater generation-limit increases. These results suggest that the upward load-response capability of AI data centers can provide complementary transient-stability support when sufficient electrical headroom, flexible workloads, and reliable grid-triggered activation are available.

中文解读

背景:AI 数据中心负载、功率密度和能源约束同步上升,算力负载与电网侧资源的协同调度正在成为智算中心设计的关键变量。问题:论文聚焦现有方案在效率、可靠性或工程协同上的瓶颈。方法:摘要显示作者采用文献摘要中的模型、实验或案例分析,把运行负载、冷却/能源系统和基础设施约束放在同一分析框架中。结果:研究重点指向AI 负载波动对电网设备寿命和调频边界的影响。意义:对日报读者而言,它可用于判断智算中心建设是否受电网容量、负载波动和调度机制约束。仍需结合全文实验条件、样本范围和成本假设核验。

参考文献

Jae-Kyeong Kim. Flexible Training Workloads in Large-Scale AI Data Centers for Transient-Stability Support in Transmission-Constrained Power Systems[J/OL]. (2026-08-31)[2026-09-03]. http://arxiv.org/abs/2608.30901v1.

Full text 中文海报
算电协同 论文图示
Research Article热管理与液冷

Generalizing Thermal Transport in High-Contrast Metamaterials through Interfacial Fresnel Reflection

Seung Hyeon Ham、Yu Min Kim、In Hyeok Choi、Jeong Woo Han

Published 2026-08-26 · arXiv · Credibility S

The rapid growth of generative AI has intensified the need for efficient heat dissipation in large-scale data centers. To control heat flow, thermal metamaterials with layered structures have been widely used, which impart the anisotropic properties of thermal conductivities. However, the conventional effective medium approximation (EMA) often fails to provide accurate predictions in systems with a high thermal cond…

Abstract, interpretation and reference

Abstract

The rapid growth of generative AI has intensified the need for efficient heat dissipation in large-scale data centers. To control heat flow, thermal metamaterials with layered structures have been widely used, which impart the anisotropic properties of thermal conductivities. However, the conventional effective medium approximation (EMA) often fails to provide accurate predictions in systems with a high thermal conductivity contrast between adjacent layers embedded in a background medium. Here, we generalize the EMA by introducing two corrective coefficients that extend its validity to regimes where the conventional EMA was previously inapplicable, i.e., high-contrast thermal metamaterials with the background medium. Notably, one of these coefficients that we proposed has the same mathematical form as the Fresnel reflection coefficient in optics. This allows us to interpret the "reflection-like" behavior of heat flow as it penetrates adjacent layers with high thermal contrast. Our findings suggest that heat diffusion, traditionally viewed as a purely dissipative process, can be understood intuitively through the framework of ray optics.

中文解读

背景:AI 数据中心负载、功率密度和能源约束同步上升,液冷、热管理和数据中心能效正在成为智算中心设计的关键变量。问题:论文聚焦现有方案在效率、可靠性或工程协同上的瓶颈。方法:摘要显示作者采用框架构建和频域/系统级分析,把运行负载、冷却/能源系统和基础设施约束放在同一分析框架中。结果:研究重点指向冷却效率、能源利用或运维策略的改进方向。意义:对日报读者而言,它可用于判断液冷方案、热管理路线和高密度部署节奏。仍需结合全文实验条件、样本范围和成本假设核验。

参考文献

Seung Hyeon Ham, Yu Min Kim, In Hyeok Choi, 等. Generalizing Thermal Transport in High-Contrast Metamaterials through Interfacial Fresnel Reflection[J/OL]. (2026-08-26)[2026-09-03]. http://arxiv.org/abs/2608.25499v1.

Full text 中文海报
热管理与液冷 论文图示
Research Article算电协同

Minimizing Grid Interconnection Capacity Requirements for AI Data Centers: A Developer-Side Planning Framework with Onsite Resources and Workload Flexibility

Hassan Zahid Butt、Rida Fatima、Xingpeng Li

Published 2026-08-30 · arXiv · Credibility S

Securing grid interconnection capacity has become a bottleneck for AI data center projects and can take longer than constructing the facilities themselves. This mismatch can delay deployment for years, making early interconnection planning essential. This paper develops ICP-AI, an interconnection capacity planning framework from a data center developer's perspective. The framework minimizes grid import capacity unde…

Abstract, interpretation and reference

Abstract

Securing grid interconnection capacity has become a bottleneck for AI data center projects and can take longer than constructing the facilities themselves. This mismatch can delay deployment for years, making early interconnection planning essential. This paper develops ICP-AI, an interconnection capacity planning framework from a data center developer's perspective. The framework minimizes grid import capacity under a prescribed onsite investment budget while jointly sizing photovoltaic (PV) and battery energy storage system (BESS) resources and scheduling deadline constrained workload flexibility. A secondary refinement fixes the minimum grid capacity and selects the minimum-investment PV-BESS portfolio among solutions that achieve that capacity. The framework is evaluated using monthly composite stress profiles across varying temporal assumptions, load shapes, flexible load fractions, and deferral windows. Results show that interconnection capacity reduction depends strongly on the planning environment: at a $100M budget, it is about 6% for the high load factor baseline, exceeds 10% under monthly average solar availability, and reaches 13.3% for a more diurnal load. At a $10M budget, 5% flexible load with a 1 h workload deferral window reduces BESS capacity from 15.30 to 4.87 MWh while increasing capacity reduction from 4.43% to 4.84%. To test sensitivity to temporal compression, the model is also solved over the full 8,760 h chronology, which preserves the main capacity and flexibility trends. Overall, ICP-AI quantifies the interconnection capacity and infrastructure substitution value of workload flexibility, providing an investment-interconnection frontier to support capital allocation and early project planning in constrained grid environments.

中文解读

背景:AI 数据中心负载、功率密度和能源约束同步上升,算力负载与电网侧资源的协同调度正在成为智算中心设计的关键变量。问题:论文聚焦现有方案在效率、可靠性或工程协同上的瓶颈。方法:摘要显示作者采用建模优化、调度分析或算法评估,把运行负载、冷却/能源系统和基础设施约束放在同一分析框架中。结果:研究重点指向AI 负载波动对电网设备寿命和调频边界的影响。意义:对日报读者而言,它可用于判断智算中心建设是否受电网容量、负载波动和调度机制约束。仍需结合全文实验条件、样本范围和成本假设核验。

参考文献

Hassan Zahid Butt, Rida Fatima, Xingpeng Li. Minimizing Grid Interconnection Capacity Requirements for AI Data Centers: A Developer-Side Planning Framework with Onsite Resources and Workload Flexibility[J/OL]. (2026-08-30)[2026-09-03]. http://arxiv.org/abs/2608.29359v1.

Full text 中文海报
算电协同 论文图示
Research Article算电协同

Techno-Economic Boundary Analysis of Small Modular Reactor Cogeneration for Hyperscale Data Center IT and Cooling Loads

Honglin Li、Buxin She、Jie Zhang

Published 2026-08-11 · arXiv · Credibility S

Hyperscale data centers are adding firm, high-utilization demand faster than grids can serve it, renewing interest in colocating them with small modular reactors. Such a plant could earn revenue in two ways, selling low-carbon power and diverting steam to absorption chillers that serve a cooling load accounting for 20-40% of facility electricity use, but neither revenue stream has been priced across the conditions t…

Abstract, interpretation and reference

Abstract

Hyperscale data centers are adding firm, high-utilization demand faster than grids can serve it, renewing interest in colocating them with small modular reactors. Such a plant could earn revenue in two ways, selling low-carbon power and diverting steam to absorption chillers that serve a cooling load accounting for 20-40% of facility electricity use, but neither revenue stream has been priced across the conditions that must coincide. Here we co-optimize reactor dispatch, steam extraction, absorption cooling and grid exchange hourly for a 200 MW$_\mathrm{e}$ data center in the Electric Reliability Council of Texas (ERCOT) region, across 109 runs spanning capital, market, policy, financing and cooling efficiency. At 2023 mid-range reactor capital, the nuclear configurations cost 49-62% more than grid supply even with the Section 45Y production tax credit. The viable region opens near \$5,000 kW$_\mathrm{e}^{-1}$, and nth-of-a-kind capital makes them 77-89% cheaper in 2023, though between parity and 34% more expensive in the low-price 2024 market. A carbon price of \$53-64 tCO$_2^{-1}$ closes the mid-range gap under hourly export crediting. Absorption cooling is dispatched in response to hourly electricity prices and supplies 38% of annual cooling, at an added cost of \$9.2 million yr$^{-1}$ relative to the reactor-only plant; that gap closes at an installed absorption cost of \$60 kW$_\mathrm{c}^{-1}$ at baseline efficiency and \$570 kW$_\mathrm{c}^{-1}$ on a legacy-efficiency campus, against surveyed commercial prices of \$450-1,200 kW$_\mathrm{c}^{-1}$. Together these results delineate the capital, market and policy conditions under which colocated reactor cogeneration is competitive with grid procurement, and the range over which each condition moves the outcome.

中文解读

背景:AI 数据中心负载、功率密度和能源约束同步上升,算力负载与电网侧资源的协同调度正在成为智算中心设计的关键变量。问题:论文聚焦现有方案在效率、可靠性或工程协同上的瓶颈。方法:摘要显示作者采用综述归纳和指标比较,把运行负载、冷却/能源系统和基础设施约束放在同一分析框架中。结果:研究重点指向AI 负载波动对电网设备寿命和调频边界的影响。意义:对日报读者而言,它可用于判断智算中心建设是否受电网容量、负载波动和调度机制约束。仍需结合全文实验条件、样本范围和成本假设核验。

参考文献

Honglin Li, Buxin She, Jie Zhang. Techno-Economic Boundary Analysis of Small Modular Reactor Cogeneration for Hyperscale Data Center IT and Cooling Loads[J/OL]. (2026-08-11)[2026-09-03]. http://arxiv.org/abs/2608.10999v1.

Full text 中文海报
算电协同 论文图示
Research Article算电协同

Shift or curtail? How much data-center flexibility is worth depends on the host power grid

Saroj Khanal、Geon Roh、Boyu Yao、Abraham Silverman、Dennice Gayme、Charalambos Konstantinou、Jip Kim、Yury Dvorkin

Published 2026-08-20 · arXiv · Credibility S

Data-center growth risks overbuilding power grid infrastructure and stranding capital. Flexible data-center operation can defer infrastructure investments, but its value depends on the flexibility mechanism and the host power grid characteristics. We classify data-center load as firm, flexible or interruptible, and embed them in capacity expansion applied to market-organized, fossil-heavy PJM and carbon-capped, cent…

Abstract, interpretation and reference

Abstract

Data-center growth risks overbuilding power grid infrastructure and stranding capital. Flexible data-center operation can defer infrastructure investments, but its value depends on the flexibility mechanism and the host power grid characteristics. We classify data-center load as firm, flexible or interruptible, and embed them in capacity expansion applied to market-organized, fossil-heavy PJM and carbon-capped, centrally coordinated Korea. In PJM, the flexibility value is spatial: shifting workloads between zones reduces system cost by 6% in 2028 and 19% in 2038, avoiding 4.4 GW and 8.9 GW of gas and nuclear generation. In Korea, it is temporal: shifting load into midday solar hours makes 0.5 GW of additional solar worth building in 2028 and avoids 1.2 GW of gas and 0.3 GW of batteries in 2038. In both, realistic event-shape limits diminish the value of curtailment. The results show that flexibility procurement and its value are driven by grid characteristics and policy objectives.

中文解读

背景:AI 数据中心负载、功率密度和能源约束同步上升,算力负载与电网侧资源的协同调度正在成为智算中心设计的关键变量。问题:论文聚焦现有方案在效率、可靠性或工程协同上的瓶颈。方法:摘要显示作者采用文献摘要中的模型、实验或案例分析,把运行负载、冷却/能源系统和基础设施约束放在同一分析框架中。结果:研究重点指向AI 负载波动对电网设备寿命和调频边界的影响。意义:对日报读者而言,它可用于判断智算中心建设是否受电网容量、负载波动和调度机制约束。仍需结合全文实验条件、样本范围和成本假设核验。

参考文献

Saroj Khanal, Geon Roh, Boyu Yao, 等. Shift or curtail? How much data-center flexibility is worth depends on the host power grid[J/OL]. (2026-08-20)[2026-09-03]. http://arxiv.org/abs/2608.19622v1.

Full text 中文海报