Research Article算电协同
Bojun Du、Hongyang Jia、Tonghui Li、Qingchun Hou、Ze Wang、Ershun Du、Ning Zhang
Published 2026-09-09 · arXiv · Credibility S
AI data centers may face power supply shortages during certain periods, requiring operators to shift large language model (LLM) inference workloads spatially to maintain service rates. However, existing workload-shifting methods typically assume that any data center with sufficient computing resources can immediately serve shifted requests, which may lead to infeasible transfers and unserved demand. This letter prop…
Abstract, interpretation and reference
Abstract
AI data centers may face power supply shortages during certain periods, requiring operators to shift large language model (LLM) inference workloads spatially to maintain service rates. However, existing workload-shifting methods typically assume that any data center with sufficient computing resources can immediately serve shifted requests, which may lead to infeasible transfers and unserved demand. This letter proposes model commitment (MC), a mixed-integer linear programming framework that jointly schedules model deployment and cross-site request routing under power constraints and electricity-price signals. First, MC formulates the intertemporal coupling introduced by model replica loading. Second, it translates prefill and decode latency requirements into the amount of demand that each replica can serve. Case studies based on real-world data show that MC enables AI data center operators to achieve a 100% service rate under time-varying grid conditions and reduce total operating cost by 29.0%.
中文解读
背景:AI 数据中心负载、功率密度和能源约束同步上升,算力负载与电网侧资源的协同调度正在成为智算中心设计的关键变量。问题:论文聚焦现有方案在效率、可靠性或工程协同上的瓶颈。方法:摘要显示作者采用框架构建和频域/系统级分析,把运行负载、冷却/能源系统和基础设施约束放在同一分析框架中。结果:研究重点指向AI 负载波动对电网设备寿命和调频边界的影响。意义:对日报读者而言,它可用于判断智算中心建设是否受电网容量、负载波动和调度机制约束。仍需结合全文实验条件、样本范围和成本假设核验。
参考文献
Bojun Du, Hongyang Jia, Tonghui Li, 等. Spatial LLM Workload Shifting Needs Foresight: Model Commitment for AI Data Center Operation under Power Grid Constraints[J/OL]. (2026-09-09)[2026-09-12]. http://arxiv.org/abs/2609.09787v1.
Research Article芯片与算力
Can Emre Koksal、Richard A. Barry、Artun Sel
Published 2026-08-13 · arXiv · Credibility S
The growing power demands and variability of AI workloads make electrical power delivery a critical constraint in data-center operation. Distributed energy storage can reduce the power capacity required to support stochastic loads, but its benefits depend fundamentally on the statistics and time scales of demand. This paper develops a probabilistic framework that jointly characterizes provisioned power, energy-stora…
Abstract, interpretation and reference
Abstract
The growing power demands and variability of AI workloads make electrical power delivery a critical constraint in data-center operation. Distributed energy storage can reduce the power capacity required to support stochastic loads, but its benefits depend fundamentally on the statistics and time scales of demand. This paper develops a probabilistic framework that jointly characterizes provisioned power, energy-storage capacity, and the probability of overdraw. We show that storage-assisted provisioning separates into two operating regimes. In the Small Battery Region, overdraw is dominated by short-lived demand excursions and storage provides nearly linear reductions in the required power margin. In the Large Battery Region, overdraw results from sustained demand fluctuations over longer spans of time, and the required margin exhibits diminishing returns with storage. For this regime we introduce effective power, an analogue of effective bandwidth that captures the temporal statistics of the demand and gives an asymptotically tight characterization of the required power. We further quantify how temporal correlation and spatial aggregation affect storage requirements and statistical multiplexing gains, and extend the analysis to loads with multiple demand time scales. Finally, we evaluate the framework using power-demand traces from three production data centers spanning HPC, GPU-training, and cloud-service workloads. Despite their heterogeneous, cyclo-stationary and multi-modal behavior, the measured workloads exhibit the predicted regimes, and a simple four-parameter two-state model captures the dynamics governing their storage-power tradeoffs. The resulting framework provides both a probabilistic foundation and practical dimensioning principles for storage-assisted power provisioning in next-generation AI data centers.
中文解读
背景:AI 数据中心负载、功率密度和能源约束同步上升,芯片、服务器和高密度算力部署正在成为智算中心设计的关键变量。问题:论文聚焦现有方案在效率、可靠性或工程协同上的瓶颈。方法:摘要显示作者采用框架构建和频域/系统级分析,把运行负载、冷却/能源系统和基础设施约束放在同一分析框架中。结果:研究重点指向跨地域数据中心负载与电力资源之间的调度关系。意义:对日报读者而言,它可用于判断芯片路线和服务器密度变化如何传导到机房设计。仍需结合全文实验条件、样本范围和成本假设核验。
参考文献
Can Emre Koksal, Richard A. Barry, Artun Sel. A Theory of Probabilistic Power Provisioning for Data Centers with Distributed Energy Storage[J/OL]. (2026-08-13)[2026-09-12]. http://arxiv.org/abs/2608.12993v1.
Research Article算电协同
Yubo Song、Rui Kong、Takuro Umihara、Pooya Davari、Frede Blaabjerg、Subham Sahoo
Published 2026-09-10 · arXiv · Credibility S
The rapid growth of artificial intelligence (AI) computing is transforming data centers into large, dynamic electrical loads. Their deployment is primarily constrained by energy availability and grid-connection capacity, which is further aggravated by the ability of power-delivery architectures, control systems, and computing workloads to operate reliably during fast grid disturbances. This article presents a techno…
Abstract, interpretation and reference
Abstract
The rapid growth of artificial intelligence (AI) computing is transforming data centers into large, dynamic electrical loads. Their deployment is primarily constrained by energy availability and grid-connection capacity, which is further aggravated by the ability of power-delivery architectures, control systems, and computing workloads to operate reliably during fast grid disturbances. This article presents a technological perspective on AI data centers as grid-interactive computing systems. First, it reviews grid-integration bottlenecks, evolving connection policies, grid-code requirements, which has fostered new technological trends via spatio-temporal flexibility available through workload orchestration, cooling systems, on-site resources, and energy storage. Second, it maps the evolution of power-delivery architectures from medium-voltage grid interfaces to chip-level, discussing higher-voltage DC distribution, solid-state transformers, wide-bandgap devices, advanced chip-level power delivery, and liquid cooling. Third, it establishes a three-level stability framework spanning rack-level DC-bus dynamics, facility-level converter interactions, and system-level grid-coupled behavior. The framework connects dominant instability mechanisms, including constant power load effects, impedance interactions, forced oscillations, and operating-mode transitions, with suitable modeling, assessment, and mitigation approaches. Synthesizing these topics, this article highlights grid-to-chip co-design as a central requirement for scalable AI infrastructure, linking computing workloads, power-delivery systems, energy buffers, and grid operation.
中文解读
背景:AI 数据中心负载、功率密度和能源约束同步上升,算力负载与电网侧资源的协同调度正在成为智算中心设计的关键变量。问题:论文聚焦现有方案在效率、可靠性或工程协同上的瓶颈。方法:摘要显示作者采用综述归纳和指标比较,把运行负载、冷却/能源系统和基础设施约束放在同一分析框架中。结果:研究重点指向AI 负载波动对电网设备寿命和调频边界的影响。意义:对日报读者而言,它可用于判断智算中心建设是否受电网容量、负载波动和调度机制约束。仍需结合全文实验条件、样本范围和成本假设核验。
参考文献
Yubo Song, Rui Kong, Takuro Umihara, 等. From Grid to Chip: Power Architecture, Stability, and Flexibility of AI Data Centers[J/OL]. (2026-09-10)[2026-09-12]. http://arxiv.org/abs/2609.11649v1.
Research Article芯片与算力
Hanzhao Wang、Jingxuan Wu、Yumeng Li、Yu Pan、Guanting Chen
Published 2026-08-19 · arXiv · Credibility S
The growing demand for AI-driven workloads, particularly from Large Language Models (LLMs), has raised concerns about the significant energy and resource consumption in data centers. This work introduces a novel LLM-based predictive scheduling system designed to enhance operational efficiency while reducing the environmental impact of data centers. Our system utilizes an LLM to predict key metrics such as execution …
Abstract, interpretation and reference
Abstract
The growing demand for AI-driven workloads, particularly from Large Language Models (LLMs), has raised concerns about the significant energy and resource consumption in data centers. This work introduces a novel LLM-based predictive scheduling system designed to enhance operational efficiency while reducing the environmental impact of data centers. Our system utilizes an LLM to predict key metrics such as execution time and energy consumption from source code, and it has the potential to extend to other sustainability-focused metrics like water usage for cooling and carbon emissions, provided the data center can track such data. The predictive model is followed by a real-time scheduling algorithm that allocates GPU resources, aiming to improve sustainability by optimizing both energy consumption and queuing delays. With fast inference times, the ability to generalize across diverse task types, and minimal data requirements for training, our approach offers a practical solution for data center scheduling. This framework demonstrates strong potential for advancing sustainability objectives in AI-driven infrastructure. Through our collaboration with a data center, we achieved a 32% reduction in energy consumption and a 30% decrease in waiting time.
中文解读
背景:AI 数据中心负载、功率密度和能源约束同步上升,芯片、服务器和高密度算力部署正在成为智算中心设计的关键变量。问题:论文聚焦现有方案在效率、可靠性或工程协同上的瓶颈。方法:摘要显示作者采用建模优化、调度分析或算法评估,把运行负载、冷却/能源系统和基础设施约束放在同一分析框架中。结果:研究重点指向能效评价口径、运营指标和优化目标的系统化梳理。意义:对日报读者而言,它可用于判断芯片路线和服务器密度变化如何传导到机房设计。仍需结合全文实验条件、样本范围和成本假设核验。
参考文献
Hanzhao Wang, Jingxuan Wu, Yumeng Li, 等. LLM-Powered Predictive Decision-Making for Sustainable Data Center Operations[J/OL]. (2026-08-19)[2026-09-12]. http://arxiv.org/abs/2608.18503v1.
Research Article算电协同
Xin Chen
Published 2026-09-04 · arXiv · Credibility S
To facilitate the grid-friendly integration of highly variable AI data center loads, this paper proposes a grid-mode-aware model predictive control (G-MPC) framework for managing a hybrid energy storage system (HESS) to smooth grid-side power demand. The framework optimally coordinates a battery energy storage system (BESS) and a supercapacitor (SC) by solving a multi-step optimization problem in a receding-horizon …
Abstract, interpretation and reference
Abstract
To facilitate the grid-friendly integration of highly variable AI data center loads, this paper proposes a grid-mode-aware model predictive control (G-MPC) framework for managing a hybrid energy storage system (HESS) to smooth grid-side power demand. The framework optimally coordinates a battery energy storage system (BESS) and a supercapacitor (SC) by solving a multi-step optimization problem in a receding-horizon manner. In particular, band-pass filter dynamics are directly embedded in the G-MPC formulation to extract and suppress grid-side power components associated with vulnerable grid oscillatory modes, thus mitigating load-induced grid oscillations. The resulting G-MPC optimization jointly minimizes violations of grid-side power-envelope, ramp-rate, and modal-power requirements and the degradation and power-ramping costs of the BESS and SC, while satisfying power limits, state-of-charge limits, and other operational constraints. To enable real-time implementation, a fix-and-re-optimize algorithm is developed to solve each G-MPC problem efficiently while preventing simultaneous charging and discharging. Extensive simulations demonstrate the effectiveness, flexibility, and computational efficiency of the proposed framework. The results also highlight the importance of explicitly suppressing power components associated with vulnerable grid modes, rather than merely reducing overall load variations, to effectively mitigate grid oscillations.
中文解读
背景:AI 数据中心负载、功率密度和能源约束同步上升,算力负载与电网侧资源的协同调度正在成为智算中心设计的关键变量。问题:论文聚焦现有方案在效率、可靠性或工程协同上的瓶颈。方法:摘要显示作者采用建模优化、调度分析或算法评估,把运行负载、冷却/能源系统和基础设施约束放在同一分析框架中。结果:研究重点指向AI 负载波动对电网设备寿命和调频边界的影响。意义:对日报读者而言,它可用于判断智算中心建设是否受电网容量、负载波动和调度机制约束。仍需结合全文实验条件、样本范围和成本假设核验。
参考文献
Xin Chen. Grid-Mode-Aware Model Predictive Control of Hybrid Energy Storage Systems for AI Data Center Power Smoothing[J/OL]. (2026-09-04)[2026-09-12]. http://arxiv.org/abs/2609.04398v1.
Research Article算电协同
Pengyu Ren、Wei Sun、Fei Teng
Published 2026-09-03 · arXiv · Credibility S
Large data centers are emerging as concentrated, power-electronic grid loads whose abrupt disconnection or transfer to on-site backup supply during voltage disturbances can remove large demand from the power system, and may create a system-level stability problem. Their interconnection feasibility therefore depends not only on steady-state thermal and voltage limits, but also on whether internal power-conditioning s…
Abstract, interpretation and reference
Abstract
Large data centers are emerging as concentrated, power-electronic grid loads whose abrupt disconnection or transfer to on-site backup supply during voltage disturbances can remove large demand from the power system, and may create a system-level stability problem. Their interconnection feasibility therefore depends not only on steady-state thermal and voltage limits, but also on whether internal power-conditioning systems can maintain IT service while limiting customer-initiated load reduction. This paper presents a voltage ride-through (VRT)-aware data center and grid co-planning framework that couples transmission-level fault simulation with an internal data center ride-through model. Python-based dynamic simulations generate point-of-interconnection (POI) voltage trajectories under selected network faults, and the resulting waveforms drive an internal model incorporating IT and cooling-load dynamics, DC-link, Uninterruptible Power Supply (UPS) response, and converter apparent power limits. The IEEE 118-bus case study shows that internal VRT capability can become a binding interconnection constraint: steady-state planning alone can overestimate feasible data center capacity, whereas increased UPS converter headroom progressively restores hosting capacity. Under the reduced-order response models studied, the grid-forming mode provides greater ride-through margin than the current-limited grid-following mode under the same network fault conditions. The results further show that VRT constraints can materially change both the total hosting capacity of data centers and its spatial allocation across candidate interconnection buses.
中文解读
背景:AI 数据中心负载、功率密度和能源约束同步上升,算力负载与电网侧资源的协同调度正在成为智算中心设计的关键变量。问题:论文聚焦现有方案在效率、可靠性或工程协同上的瓶颈。方法:摘要显示作者采用框架构建和频域/系统级分析,把运行负载、冷却/能源系统和基础设施约束放在同一分析框架中。结果:研究重点指向AI 负载波动对电网设备寿命和调频边界的影响。意义:对日报读者而言,它可用于判断智算中心建设是否受电网容量、负载波动和调度机制约束。仍需结合全文实验条件、样本范围和成本假设核验。
参考文献
Pengyu Ren, Wei Sun, Fei Teng. Hosting Capacity Assessment of Data Centers with Voltage Ride-Through Capability in Power Systems[J/OL]. (2026-09-03)[2026-09-12]. http://arxiv.org/abs/2609.03030v1.
Research Article算电协同
Nicoletta Tsiopani、Moysis Symeonides、George Pallis、Marios D. Dikaiakos
Published 2026-08-13 · arXiv · Credibility S
The rapid growth of LLM inference is shifting sustainability concerns from one-time training to continuous serving, where infrastructure decisions shape energy use, carbon emissions, water consumption, and service quality. Yet operators often need to compare deployment alternatives before large-scale infrastructure is built, making direct measurement costly, slow, and sometimes infeasible. We present InFactPlanner, …
Abstract, interpretation and reference
Abstract
The rapid growth of LLM inference is shifting sustainability concerns from one-time training to continuous serving, where infrastructure decisions shape energy use, carbon emissions, water consumption, and service quality. Yet operators often need to compare deployment alternatives before large-scale infrastructure is built, making direct measurement costly, slow, and sometimes infeasible. We present InFactPlanner, a trace-driven decision-support framework for what-if analysis of sustainable AI data center deployment for LLM inference across single and geo-distributed sites. InFactPlanner combines query traces, hardware-model profiles, candidate site configurations, PUE/WUE parameters, renewable generation models, and time-varying grid carbon intensity to estimate power, energy, carbon emissions, water use, latency, and server utilization. The framework abstracts low-level serving effects into configurable hardware-model profiles, enabling rapid comparison of site selection, capacity placement, hardware, model, renewable integration, and routing choices. We validate the energy accounting pipeline by reproducing reference LLM inference energy estimates with less than 10% deviation, evaluate scalability across multiple data centers and server counts, and demonstrate scenario-driven decision analyses for hardware selection, renewable placement, geographic deployment, and carbon-aware routing. Our results show that sustainability-optimal choices can differ from latency-optimal ones, and that the carbon value of deployment depends strongly on the local grid mix.
中文解读
背景:AI 数据中心负载、功率密度和能源约束同步上升,算力负载与电网侧资源的协同调度正在成为智算中心设计的关键变量。问题:论文聚焦现有方案在效率、可靠性或工程协同上的瓶颈。方法:摘要显示作者采用框架构建和频域/系统级分析,把运行负载、冷却/能源系统和基础设施约束放在同一分析框架中。结果:研究重点指向AI 负载波动对电网设备寿命和调频边界的影响。意义:对日报读者而言,它可用于判断智算中心建设是否受电网容量、负载波动和调度机制约束。仍需结合全文实验条件、样本范围和成本假设核验。
参考文献
Nicoletta Tsiopani, Moysis Symeonides, George Pallis, 等. InFactPlanner: Planning Sustainable Geo-Distributed LLM Data Centers[J/OL]. (2026-08-13)[2026-09-12]. http://arxiv.org/abs/2608.12915v1.
Research Article算电协同
Arya Joshi、Hamed Haggi、Chinmay Morankar
Published 2026-09-01 · arXiv · Credibility S
The accelerated growth in data center projects has introduced a demand-driven bottleneck throughout power grids and contributed to a substantial increase in carbon emissions. These concerns are fueling discussions on methods to use existing energy assets to drive operational efficiency. To this end, this paper explores the benefits of Vehicle-to-Building (V2B) applications to support peak shaving of data center cool…
Abstract, interpretation and reference
Abstract
The accelerated growth in data center projects has introduced a demand-driven bottleneck throughout power grids and contributed to a substantial increase in carbon emissions. These concerns are fueling discussions on methods to use existing energy assets to drive operational efficiency. To this end, this paper explores the benefits of Vehicle-to-Building (V2B) applications to support peak shaving of data center cooling loads. Initially, a literature review was conducted considering V2B constraints and optimization methods including SoC limitations, EV participation, tariffs, and building loads. This analysis was then used to develop a conceptual case study of a 10 MW data center in Loudoun County, VA by simulating a temperature-dependent load profile and adjusting the V2B participation of 40 commercial and passenger EVs. Simulation results indicate that, depending on seasonal variations in cooling load demands, strategic deployment of V2B assets between 12-5pm can offset gross cooling loads by 13-36%.
中文解读
背景:AI 数据中心负载、功率密度和能源约束同步上升,算力负载与电网侧资源的协同调度正在成为智算中心设计的关键变量。问题:论文聚焦现有方案在效率、可靠性或工程协同上的瓶颈。方法:摘要显示作者采用综述归纳和指标比较,把运行负载、冷却/能源系统和基础设施约束放在同一分析框架中。结果:研究重点指向AI 负载波动对电网设备寿命和调频边界的影响。意义:对日报读者而言,它可用于判断智算中心建设是否受电网容量、负载波动和调度机制约束。仍需结合全文实验条件、样本范围和成本假设核验。
参考文献
Arya Joshi, Hamed Haggi, Chinmay Morankar. Exploiting the Benefits of V2B Application on Peak Shaving of Data Center Loads[J/OL]. (2026-09-01)[2026-09-12]. http://arxiv.org/abs/2609.00204v1.