To facilitate the grid-friendly integration of highly variable AI data center loads, this paper proposes a grid-mode-aware model predictive control (G-MPC) framework for managing a hybrid energy storage system (HESS) to smooth grid-side power demand. The framework optimally coordinates a battery energy storage system (BESS) and a supercapacitor (SC) by solving a multi-step optimization problem in a receding-horizon …
Abstract, interpretation and reference
Abstract
To facilitate the grid-friendly integration of highly variable AI data center loads, this paper proposes a grid-mode-aware model predictive control (G-MPC) framework for managing a hybrid energy storage system (HESS) to smooth grid-side power demand. The framework optimally coordinates a battery energy storage system (BESS) and a supercapacitor (SC) by solving a multi-step optimization problem in a receding-horizon manner. In particular, band-pass filter dynamics are directly embedded in the G-MPC formulation to extract and suppress grid-side power components associated with vulnerable grid oscillatory modes, thus mitigating load-induced grid oscillations. The resulting G-MPC optimization jointly minimizes violations of grid-side power-envelope, ramp-rate, and modal-power requirements and the degradation and power-ramping costs of the BESS and SC, while satisfying power limits, state-of-charge limits, and other operational constraints. To enable real-time implementation, a fix-and-re-optimize algorithm is developed to solve each G-MPC problem efficiently while preventing simultaneous charging and discharging. Extensive simulations demonstrate the effectiveness, flexibility, and computational efficiency of the proposed framework. The results also highlight the importance of explicitly suppressing power components associated with vulnerable grid modes, rather than merely reducing overall load variations, to effectively mitigate grid oscillations.
中文解读
背景:AI 数据中心负载、功率密度和能源约束同步上升,算力负载与电网侧资源的协同调度正在成为智算中心设计的关键变量。问题:论文聚焦现有方案在效率、可靠性或工程协同上的瓶颈。方法:摘要显示作者采用建模优化、调度分析或算法评估,把运行负载、冷却/能源系统和基础设施约束放在同一分析框架中。结果:研究重点指向AI 负载波动对电网设备寿命和调频边界的影响。意义:对日报读者而言,它可用于判断智算中心建设是否受电网容量、负载波动和调度机制约束。仍需结合全文实验条件、样本范围和成本假设核验。
参考文献
Xin Chen. Grid-Mode-Aware Model Predictive Control of Hybrid Energy Storage Systems for AI Data Center Power Smoothing[J/OL]. (2026-09-04)[2026-09-27]. http://arxiv.org/abs/2609.04398v1.
Research ArticleAI 运维优化
Slava G. Turyshev
Published 2026-08-27 · arXiv · Credibility S
Megawatt-class orbital data centers require continuous maintenance, replacement, inventory, and service capacity in addition to spacecraft power/thermal systems. We formulate an analytical lifecycle framework for permanent/transient failures, modular orbital replacement units, robotic servicing, spare inventory, scheduled technology refresh, correlated faults, cybersecurity, optional human support. The model combine…
Abstract, interpretation and reference
Abstract
Megawatt-class orbital data centers require continuous maintenance, replacement, inventory, and service capacity in addition to spacecraft power/thermal systems. We formulate an analytical lifecycle framework for permanent/transient failures, modular orbital replacement units, robotic servicing, spare inventory, scheduled technology refresh, correlated faults, cybersecurity, optional human support. The model combines nonhomogeneous component hazards, capacity-weighted availability, multiclass robotic-service capacity, Poisson base-stock inventory, replacement-flow accounting, human-support break-even relations. For a 1 MW cluster with 10 active 100 kW nodes, 1 reserve node, ~200 5 kW compute cartridges, low, nominal, high deployed-mass allocations span ~50-75 kg/kW. Assumptions yield 70.2 random or life-limited interventions and 323-349 planned refresh operations/(MW-year), for a total of 393-419 standardized operations/(MW-year). Analysis gives a first-generation logistics of 5.3-9.0 t/(MW-year), with a nominal case of ~ 6.6 t/(MW year), 560-700 productive robot-hors/(MW-year). Planned refresh exceeds random replacement under the stated component populations, hazards, 3-15-year intervals. At ~400 standardized operations/(MW-year), the post-internal-recovery exception probability is <$10^{-3}$, with an objective near $10^{-4}$ at large scale; terminal non-recovery $p_U$ requires a smaller mission-level allocation. The target catastrophic-loss hazard for a 100 kW node is 0.01-0.03 1/yr. Parametric workload and cost cases place contingency visits at 10s of MWs, periodic campaigns at 10-100s of MWs, dedicated personnel at several 100 MWs to GWs. The reference first deployment is uncrewed, autonomously fault-managed, robotically maintainable, supported by specific inventory based on a 6-month replenishment horizon, compatible with later human access without permanent habitation.
中文解读
背景:AI 数据中心负载、功率密度和能源约束同步上升,AI 运维、负载预测和设施调优正在成为智算中心设计的关键变量。问题:论文聚焦现有方案在效率、可靠性或工程协同上的瓶颈。方法:摘要显示作者采用框架构建和频域/系统级分析,把运行负载、冷却/能源系统和基础设施约束放在同一分析框架中。结果:研究重点指向能效评价口径、运营指标和优化目标的系统化梳理。意义:对日报读者而言,它可用于判断AI 工具是否能降低运维复杂度并提升可用性。仍需结合全文实验条件、样本范围和成本假设核验。
参考文献
Slava G. Turyshev. Operations, Maintenance, and Industrial Scaling of MW-Class Orbital Data Centers[J/OL]. (2026-08-27)[2026-09-27]. http://arxiv.org/abs/2608.27499v1.
Research Article算电协同
Yubo Song、Rui Kong、Takuro Umihara、Pooya Davari、Frede Blaabjerg、Subham Sahoo
Published 2026-09-10 · arXiv · Credibility S
The rapid growth of artificial intelligence (AI) computing is transforming data centers into large, dynamic electrical loads. Their deployment is primarily constrained by energy availability and grid-connection capacity, which is further aggravated by the ability of power-delivery architectures, control systems, and computing workloads to operate reliably during fast grid disturbances. This article presents a techno…
Abstract, interpretation and reference
Abstract
The rapid growth of artificial intelligence (AI) computing is transforming data centers into large, dynamic electrical loads. Their deployment is primarily constrained by energy availability and grid-connection capacity, which is further aggravated by the ability of power-delivery architectures, control systems, and computing workloads to operate reliably during fast grid disturbances. This article presents a technological perspective on AI data centers as grid-interactive computing systems. First, it reviews grid-integration bottlenecks, evolving connection policies, grid-code requirements, which has fostered new technological trends via spatio-temporal flexibility available through workload orchestration, cooling systems, on-site resources, and energy storage. Second, it maps the evolution of power-delivery architectures from medium-voltage grid interfaces to chip-level, discussing higher-voltage DC distribution, solid-state transformers, wide-bandgap devices, advanced chip-level power delivery, and liquid cooling. Third, it establishes a three-level stability framework spanning rack-level DC-bus dynamics, facility-level converter interactions, and system-level grid-coupled behavior. The framework connects dominant instability mechanisms, including constant power load effects, impedance interactions, forced oscillations, and operating-mode transitions, with suitable modeling, assessment, and mitigation approaches. Synthesizing these topics, this article highlights grid-to-chip co-design as a central requirement for scalable AI infrastructure, linking computing workloads, power-delivery systems, energy buffers, and grid operation.
中文解读
背景:AI 数据中心负载、功率密度和能源约束同步上升,算力负载与电网侧资源的协同调度正在成为智算中心设计的关键变量。问题:论文聚焦现有方案在效率、可靠性或工程协同上的瓶颈。方法:摘要显示作者采用综述归纳和指标比较,把运行负载、冷却/能源系统和基础设施约束放在同一分析框架中。结果:研究重点指向AI 负载波动对电网设备寿命和调频边界的影响。意义:对日报读者而言,它可用于判断智算中心建设是否受电网容量、负载波动和调度机制约束。仍需结合全文实验条件、样本范围和成本假设核验。
参考文献
Yubo Song, Rui Kong, Takuro Umihara, 等. From Grid to Chip: Power Architecture, Stability, and Flexibility of AI Data Centers[J/OL]. (2026-09-10)[2026-09-27]. http://arxiv.org/abs/2609.11649v1.
Research Article算电协同
Pengyu Ren、Wei Sun、Fei Teng
Published 2026-09-03 · arXiv · Credibility S
Large data centers are emerging as concentrated, power-electronic grid loads whose abrupt disconnection or transfer to on-site backup supply during voltage disturbances can remove large demand from the power system, and may create a system-level stability problem. Their interconnection feasibility therefore depends not only on steady-state thermal and voltage limits, but also on whether internal power-conditioning s…
Abstract, interpretation and reference
Abstract
Large data centers are emerging as concentrated, power-electronic grid loads whose abrupt disconnection or transfer to on-site backup supply during voltage disturbances can remove large demand from the power system, and may create a system-level stability problem. Their interconnection feasibility therefore depends not only on steady-state thermal and voltage limits, but also on whether internal power-conditioning systems can maintain IT service while limiting customer-initiated load reduction. This paper presents a voltage ride-through (VRT)-aware data center and grid co-planning framework that couples transmission-level fault simulation with an internal data center ride-through model. Python-based dynamic simulations generate point-of-interconnection (POI) voltage trajectories under selected network faults, and the resulting waveforms drive an internal model incorporating IT and cooling-load dynamics, DC-link, Uninterruptible Power Supply (UPS) response, and converter apparent power limits. The IEEE 118-bus case study shows that internal VRT capability can become a binding interconnection constraint: steady-state planning alone can overestimate feasible data center capacity, whereas increased UPS converter headroom progressively restores hosting capacity. Under the reduced-order response models studied, the grid-forming mode provides greater ride-through margin than the current-limited grid-following mode under the same network fault conditions. The results further show that VRT constraints can materially change both the total hosting capacity of data centers and its spatial allocation across candidate interconnection buses.
中文解读
背景:AI 数据中心负载、功率密度和能源约束同步上升,算力负载与电网侧资源的协同调度正在成为智算中心设计的关键变量。问题:论文聚焦现有方案在效率、可靠性或工程协同上的瓶颈。方法:摘要显示作者采用框架构建和频域/系统级分析,把运行负载、冷却/能源系统和基础设施约束放在同一分析框架中。结果:研究重点指向AI 负载波动对电网设备寿命和调频边界的影响。意义:对日报读者而言,它可用于判断智算中心建设是否受电网容量、负载波动和调度机制约束。仍需结合全文实验条件、样本范围和成本假设核验。
参考文献
Pengyu Ren, Wei Sun, Fei Teng. Hosting Capacity Assessment of Data Centers with Voltage Ride-Through Capability in Power Systems[J/OL]. (2026-09-03)[2026-09-27]. http://arxiv.org/abs/2609.03030v1.
Research Article算电协同
Arya Joshi、Hamed Haggi、Chinmay Morankar
Published 2026-09-01 · arXiv · Credibility S
The accelerated growth in data center projects has introduced a demand-driven bottleneck throughout power grids and contributed to a substantial increase in carbon emissions. These concerns are fueling discussions on methods to use existing energy assets to drive operational efficiency. To this end, this paper explores the benefits of Vehicle-to-Building (V2B) applications to support peak shaving of data center cool…
Abstract, interpretation and reference
Abstract
The accelerated growth in data center projects has introduced a demand-driven bottleneck throughout power grids and contributed to a substantial increase in carbon emissions. These concerns are fueling discussions on methods to use existing energy assets to drive operational efficiency. To this end, this paper explores the benefits of Vehicle-to-Building (V2B) applications to support peak shaving of data center cooling loads. Initially, a literature review was conducted considering V2B constraints and optimization methods including SoC limitations, EV participation, tariffs, and building loads. This analysis was then used to develop a conceptual case study of a 10 MW data center in Loudoun County, VA by simulating a temperature-dependent load profile and adjusting the V2B participation of 40 commercial and passenger EVs. Simulation results indicate that, depending on seasonal variations in cooling load demands, strategic deployment of V2B assets between 12-5pm can offset gross cooling loads by 13-36%.
中文解读
背景:AI 数据中心负载、功率密度和能源约束同步上升,算力负载与电网侧资源的协同调度正在成为智算中心设计的关键变量。问题:论文聚焦现有方案在效率、可靠性或工程协同上的瓶颈。方法:摘要显示作者采用综述归纳和指标比较,把运行负载、冷却/能源系统和基础设施约束放在同一分析框架中。结果:研究重点指向AI 负载波动对电网设备寿命和调频边界的影响。意义:对日报读者而言,它可用于判断智算中心建设是否受电网容量、负载波动和调度机制约束。仍需结合全文实验条件、样本范围和成本假设核验。
参考文献
Arya Joshi, Hamed Haggi, Chinmay Morankar. Exploiting the Benefits of V2B Application on Peak Shaving of Data Center Loads[J/OL]. (2026-09-01)[2026-09-27]. http://arxiv.org/abs/2609.00204v1.
Research Article算电协同
Jae-Kyeong Kim
Published 2026-08-31 · arXiv · Credibility S
The rapid expansion of large-scale artificial intelligence (AI) data centers is adding substantial, concentrated, and rapidly varying loads to transmission-constrained power systems. Although such load variations are generally regarded as operational challenges, this paper presents an alternative perspective in which the upward load flexibility of AI data centers could be coordinated for transient-stability support.…
Abstract, interpretation and reference
Abstract
The rapid expansion of large-scale artificial intelligence (AI) data centers is adding substantial, concentrated, and rapidly varying loads to transmission-constrained power systems. Although such load variations are generally regarded as operational challenges, this paper presents an alternative perspective in which the upward load flexibility of AI data centers could be coordinated for transient-stability support. To this end, this paper proposes training-induced load surge (TILS), a fast demand-side strategy that initiates or resumes flexible AI training workloads after fault clearing to increase active-power demand at electrically effective locations. The resulting load increase allows accelerating generators to supply additional electrical power, thereby reducing the accelerating-power imbalance and limiting the first-swing rotor-angle excursion. The underlying mechanism is first clarified in a single-machine infinite-bus (SMIB) system and then evaluated in the IEEE 39-bus system and a large-scale Korean power system. Results across all three systems demonstrate that TILS can increase the transient-stability-constrained generation limit. Larger responses, earlier activation, and siting at buses with a stronger electrical influence on the critical generators provide greater generation-limit increases. These results suggest that the upward load-response capability of AI data centers can provide complementary transient-stability support when sufficient electrical headroom, flexible workloads, and reliable grid-triggered activation are available.
中文解读
背景:AI 数据中心负载、功率密度和能源约束同步上升,算力负载与电网侧资源的协同调度正在成为智算中心设计的关键变量。问题:论文聚焦现有方案在效率、可靠性或工程协同上的瓶颈。方法:摘要显示作者采用文献摘要中的模型、实验或案例分析,把运行负载、冷却/能源系统和基础设施约束放在同一分析框架中。结果:研究重点指向AI 负载波动对电网设备寿命和调频边界的影响。意义:对日报读者而言,它可用于判断智算中心建设是否受电网容量、负载波动和调度机制约束。仍需结合全文实验条件、样本范围和成本假设核验。
参考文献
Jae-Kyeong Kim. Flexible Training Workloads in Large-Scale AI Data Centers for Transient-Stability Support in Transmission-Constrained Power Systems[J/OL]. (2026-08-31)[2026-09-27]. http://arxiv.org/abs/2608.30901v1.
Research Article算电协同
Hassan Zahid Butt、Rida Fatima、Xingpeng Li
Published 2026-08-30 · arXiv · Credibility S
Securing grid interconnection capacity has become a bottleneck for AI data center projects and can take longer than constructing the facilities themselves. This mismatch can delay deployment for years, making early interconnection planning essential. This paper develops ICP-AI, an interconnection capacity planning framework from a data center developer's perspective. The framework minimizes grid import capacity unde…
Abstract, interpretation and reference
Abstract
Securing grid interconnection capacity has become a bottleneck for AI data center projects and can take longer than constructing the facilities themselves. This mismatch can delay deployment for years, making early interconnection planning essential. This paper develops ICP-AI, an interconnection capacity planning framework from a data center developer's perspective. The framework minimizes grid import capacity under a prescribed onsite investment budget while jointly sizing photovoltaic (PV) and battery energy storage system (BESS) resources and scheduling deadline constrained workload flexibility. A secondary refinement fixes the minimum grid capacity and selects the minimum-investment PV-BESS portfolio among solutions that achieve that capacity. The framework is evaluated using monthly composite stress profiles across varying temporal assumptions, load shapes, flexible load fractions, and deferral windows. Results show that interconnection capacity reduction depends strongly on the planning environment: at a $100M budget, it is about 6% for the high load factor baseline, exceeds 10% under monthly average solar availability, and reaches 13.3% for a more diurnal load. At a $10M budget, 5% flexible load with a 1 h workload deferral window reduces BESS capacity from 15.30 to 4.87 MWh while increasing capacity reduction from 4.43% to 4.84%. To test sensitivity to temporal compression, the model is also solved over the full 8,760 h chronology, which preserves the main capacity and flexibility trends. Overall, ICP-AI quantifies the interconnection capacity and infrastructure substitution value of workload flexibility, providing an investment-interconnection frontier to support capital allocation and early project planning in constrained grid environments.
中文解读
背景:AI 数据中心负载、功率密度和能源约束同步上升,算力负载与电网侧资源的协同调度正在成为智算中心设计的关键变量。问题:论文聚焦现有方案在效率、可靠性或工程协同上的瓶颈。方法:摘要显示作者采用建模优化、调度分析或算法评估,把运行负载、冷却/能源系统和基础设施约束放在同一分析框架中。结果:研究重点指向AI 负载波动对电网设备寿命和调频边界的影响。意义:对日报读者而言,它可用于判断智算中心建设是否受电网容量、负载波动和调度机制约束。仍需结合全文实验条件、样本范围和成本假设核验。
参考文献
Hassan Zahid Butt, Rida Fatima, Xingpeng Li. Minimizing Grid Interconnection Capacity Requirements for AI Data Centers: A Developer-Side Planning Framework with Onsite Resources and Workload Flexibility[J/OL]. (2026-08-30)[2026-09-27]. http://arxiv.org/abs/2608.29359v1.
Research Article算电协同
Garrett Alston、Nancy Love、Rabab Haider
Published 2026-09-22 · arXiv · Credibility S
Data centers are being developed at an unprecedented pace, yet their energy and water impacts, and the spatial and temporal distribution of these impacts, remain poorly characterized. Data centers consume water for cooling (direct) and through electricity generation (indirect). Decisions on siting and cooling technology result in water-energy trade-offs that extend impacts beyond the facility's location. Existing as…
Abstract, interpretation and reference
Abstract
Data centers are being developed at an unprecedented pace, yet their energy and water impacts, and the spatial and temporal distribution of these impacts, remain poorly characterized. Data centers consume water for cooling (direct) and through electricity generation (indirect). Decisions on siting and cooling technology result in water-energy trade-offs that extend impacts beyond the facility's location. Existing assessment frameworks rely on facility efficiency metrics and average grid water intensity factors, suppressing the temporal impacts of data center load and generation availability. They also attribute indirect consumption to the facility's location rather than to the generators (and corresponding hydrologic regions) that respond to the added load, misattributing spatial impacts. To close this gap, we develop a computational model of the data center-energy-water nexus that links facility cooling and electricity demand with hourly economic dispatch, generator-level water consumption, and monthly subbasin depletion. Built on open-source data, the model resolves where and when water is consumed, and where this consumption compounds existing water risk or creates new risk. Using the model, we study different cooling configurations and proposed developments in the state of Michigan. Air-cooled data centers halve total water consumption relative to evaporative cooling, but increase electricity demand and raise indirect water consumption by one-third, shifting the water footprint from the facility to generators. Mapping these changes to subbasins reveals depletion increases beyond the data center sites, in regions that facility-level reporting may overlook. These results show that data center water and energy impacts cannot be assessed in isolation, motivating the need for integrated modeling to inform siting, design, and reporting practices.
中文解读
背景:AI 数据中心负载、功率密度和能源约束同步上升,算力负载与电网侧资源的协同调度正在成为智算中心设计的关键变量。问题:论文聚焦现有方案在效率、可靠性或工程协同上的瓶颈。方法:摘要显示作者采用框架构建和频域/系统级分析,把运行负载、冷却/能源系统和基础设施约束放在同一分析框架中。结果:研究重点指向AI 负载波动对电网设备寿命和调频边界的影响。意义:对日报读者而言,它可用于判断智算中心建设是否受电网容量、负载波动和调度机制约束。仍需结合全文实验条件、样本范围和成本假设核验。
参考文献
Garrett Alston, Nancy Love, Rabab Haider. Data center cooling choices shift water impacts across the grid: An integrated water-energy model for sustainable data center development[J/OL]. (2026-09-22)[2026-09-27]. http://arxiv.org/abs/2609.25437v1.