Spatial LLM Workload Shifting Needs Foresight: Model Commitment for AI Data Center Operation under Power Grid Constraints

Bojun Du、Hongyang Jia、Tonghui Li、Qingchun Hou、Ze Wang、Ershun Du、Ning Zhang

Published 2026-09-09 · arXiv · Credibility S

AI data centers may face power supply shortages during certain periods, requiring operators to shift large language model (LLM) inference workloads spatially to maintain service rates. However, existing workload-shifting methods typically assume that any data center with sufficient computing resources can immediately serve shifted requests, which may lead to infeasible transfers and unserved demand. This letter prop…

Abstract, interpretation and reference

Abstract

AI data centers may face power supply shortages during certain periods, requiring operators to shift large language model (LLM) inference workloads spatially to maintain service rates. However, existing workload-shifting methods typically assume that any data center with sufficient computing resources can immediately serve shifted requests, which may lead to infeasible transfers and unserved demand. This letter proposes model commitment (MC), a mixed-integer linear programming framework that jointly schedules model deployment and cross-site request routing under power constraints and electricity-price signals. First, MC formulates the intertemporal coupling introduced by model replica loading. Second, it translates prefill and decode latency requirements into the amount of demand that each replica can serve. Case studies based on real-world data show that MC enables AI data center operators to achieve a 100% service rate under time-varying grid conditions and reduce total operating cost by 29.0%.

中文解读

背景:AI 数据中心负载、功率密度和能源约束同步上升,算力负载与电网侧资源的协同调度正在成为智算中心设计的关键变量。问题:论文聚焦现有方案在效率、可靠性或工程协同上的瓶颈。方法:摘要显示作者采用框架构建和频域/系统级分析,把运行负载、冷却/能源系统和基础设施约束放在同一分析框架中。结果:研究重点指向AI 负载波动对电网设备寿命和调频边界的影响。意义:对日报读者而言,它可用于判断智算中心建设是否受电网容量、负载波动和调度机制约束。仍需结合全文实验条件、样本范围和成本假设核验。

参考文献

Bojun Du, Hongyang Jia, Tonghui Li, 等. Spatial LLM Workload Shifting Needs Foresight: Model Commitment for AI Data Center Operation under Power Grid Constraints[J/OL]. (2026-09-09)[2026-09-30]. http://arxiv.org/abs/2609.09787v1.

Full text 中文海报
算电协同 论文图示
Research Article芯片与算力

Integrated Thermal and Power Management for Wave-Powered Subsea Data Centers via Nonlinear Model Predictive Control

Wanqun Yang、Jun Chen

Published 2026-09-28 · arXiv · Credibility S

This paper develops an integrated modeling and nonlinear model predictive control (NMPC) framework for coordinating thermal management, flexible workload scheduling, wave-power utilization, and battery operation in a wave-powered subsea data center. Realistic data center workloads are constructed from job-level CPU, memory, and GPU measurements from the MIT Supercloud dataset and divided into interactive and delay-t…

Abstract, interpretation and reference

Abstract

This paper develops an integrated modeling and nonlinear model predictive control (NMPC) framework for coordinating thermal management, flexible workload scheduling, wave-power utilization, and battery operation in a wave-powered subsea data center. Realistic data center workloads are constructed from job-level CPU, memory, and GPU measurements from the MIT Supercloud dataset and divided into interactive and delay-tolerant flexible jobs. Thermal behavior is represented by a three-node lumped model of the IT equipment, recirculating nitrogen, and pressure hull with surrounding seawater as the thermal boundary. The NMPC jointly optimizes the flexible workload power budget and cooling command subject to thermal, battery, and workload constraints. Closed-loop simulations under different workload, thermal, battery, and renewable-generation conditions demonstrate that the proposed framework maintains thermal safety while adapting cooling operation and flexible workload execution to wave-power availability and battery state-of-charge. The parametric studies show that battery capacity and wave-generation capacity strongly affect battery availability and flexible-workload queue accumulation, while excessive renewable generation capacity may lead to increased energy curtailment. Monte Carlo and distance-correlation analyses further show that flexible-job delay is relatively insensitive to the investigated system parameters, whereas terminal battery state-of-charge is primarily influenced by battery energy capacity and wave generation capacity.

中文解读

背景:AI 数据中心负载、功率密度和能源约束同步上升,芯片、服务器和高密度算力部署正在成为智算中心设计的关键变量。问题:论文聚焦现有方案在效率、可靠性或工程协同上的瓶颈。方法:摘要显示作者采用建模优化、调度分析或算法评估,把运行负载、冷却/能源系统和基础设施约束放在同一分析框架中。结果:研究重点指向能效评价口径、运营指标和优化目标的系统化梳理。意义:对日报读者而言,它可用于判断芯片路线和服务器密度变化如何传导到机房设计。仍需结合全文实验条件、样本范围和成本假设核验。

参考文献

Wanqun Yang, Jun Chen. Integrated Thermal and Power Management for Wave-Powered Subsea Data Centers via Nonlinear Model Predictive Control[J/OL]. (2026-09-28)[2026-09-30]. http://arxiv.org/abs/2609.34109v1.

Full text 中文海报
芯片与算力 论文图示
Research Article算电协同

Grid-Mode-Aware Model Predictive Control of Hybrid Energy Storage Systems for AI Data Center Power Smoothing

Xin Chen

Published 2026-09-04 · arXiv · Credibility S

To facilitate the grid-friendly integration of highly variable AI data center loads, this paper proposes a grid-mode-aware model predictive control (G-MPC) framework for managing a hybrid energy storage system (HESS) to smooth grid-side power demand. The framework optimally coordinates a battery energy storage system (BESS) and a supercapacitor (SC) by solving a multi-step optimization problem in a receding-horizon …

Abstract, interpretation and reference

Abstract

To facilitate the grid-friendly integration of highly variable AI data center loads, this paper proposes a grid-mode-aware model predictive control (G-MPC) framework for managing a hybrid energy storage system (HESS) to smooth grid-side power demand. The framework optimally coordinates a battery energy storage system (BESS) and a supercapacitor (SC) by solving a multi-step optimization problem in a receding-horizon manner. In particular, band-pass filter dynamics are directly embedded in the G-MPC formulation to extract and suppress grid-side power components associated with vulnerable grid oscillatory modes, thus mitigating load-induced grid oscillations. The resulting G-MPC optimization jointly minimizes violations of grid-side power-envelope, ramp-rate, and modal-power requirements and the degradation and power-ramping costs of the BESS and SC, while satisfying power limits, state-of-charge limits, and other operational constraints. To enable real-time implementation, a fix-and-re-optimize algorithm is developed to solve each G-MPC problem efficiently while preventing simultaneous charging and discharging. Extensive simulations demonstrate the effectiveness, flexibility, and computational efficiency of the proposed framework. The results also highlight the importance of explicitly suppressing power components associated with vulnerable grid modes, rather than merely reducing overall load variations, to effectively mitigate grid oscillations.

中文解读

背景:AI 数据中心负载、功率密度和能源约束同步上升,算力负载与电网侧资源的协同调度正在成为智算中心设计的关键变量。问题:论文聚焦现有方案在效率、可靠性或工程协同上的瓶颈。方法:摘要显示作者采用建模优化、调度分析或算法评估,把运行负载、冷却/能源系统和基础设施约束放在同一分析框架中。结果:研究重点指向AI 负载波动对电网设备寿命和调频边界的影响。意义:对日报读者而言,它可用于判断智算中心建设是否受电网容量、负载波动和调度机制约束。仍需结合全文实验条件、样本范围和成本假设核验。

参考文献

Xin Chen. Grid-Mode-Aware Model Predictive Control of Hybrid Energy Storage Systems for AI Data Center Power Smoothing[J/OL]. (2026-09-04)[2026-09-30]. http://arxiv.org/abs/2609.04398v1.

Full text 中文海报
算电协同 论文图示
Research Article算电协同

From Grid to Chip: Power Architecture, Stability, and Flexibility of AI Data Centers

Yubo Song、Rui Kong、Takuro Umihara、Pooya Davari、Frede Blaabjerg、Subham Sahoo

Published 2026-09-10 · arXiv · Credibility S

The rapid growth of artificial intelligence (AI) computing is transforming data centers into large, dynamic electrical loads. Their deployment is primarily constrained by energy availability and grid-connection capacity, which is further aggravated by the ability of power-delivery architectures, control systems, and computing workloads to operate reliably during fast grid disturbances. This article presents a techno…

Abstract, interpretation and reference

Abstract

The rapid growth of artificial intelligence (AI) computing is transforming data centers into large, dynamic electrical loads. Their deployment is primarily constrained by energy availability and grid-connection capacity, which is further aggravated by the ability of power-delivery architectures, control systems, and computing workloads to operate reliably during fast grid disturbances. This article presents a technological perspective on AI data centers as grid-interactive computing systems. First, it reviews grid-integration bottlenecks, evolving connection policies, grid-code requirements, which has fostered new technological trends via spatio-temporal flexibility available through workload orchestration, cooling systems, on-site resources, and energy storage. Second, it maps the evolution of power-delivery architectures from medium-voltage grid interfaces to chip-level, discussing higher-voltage DC distribution, solid-state transformers, wide-bandgap devices, advanced chip-level power delivery, and liquid cooling. Third, it establishes a three-level stability framework spanning rack-level DC-bus dynamics, facility-level converter interactions, and system-level grid-coupled behavior. The framework connects dominant instability mechanisms, including constant power load effects, impedance interactions, forced oscillations, and operating-mode transitions, with suitable modeling, assessment, and mitigation approaches. Synthesizing these topics, this article highlights grid-to-chip co-design as a central requirement for scalable AI infrastructure, linking computing workloads, power-delivery systems, energy buffers, and grid operation.

中文解读

背景:AI 数据中心负载、功率密度和能源约束同步上升,算力负载与电网侧资源的协同调度正在成为智算中心设计的关键变量。问题:论文聚焦现有方案在效率、可靠性或工程协同上的瓶颈。方法:摘要显示作者采用综述归纳和指标比较,把运行负载、冷却/能源系统和基础设施约束放在同一分析框架中。结果:研究重点指向AI 负载波动对电网设备寿命和调频边界的影响。意义:对日报读者而言,它可用于判断智算中心建设是否受电网容量、负载波动和调度机制约束。仍需结合全文实验条件、样本范围和成本假设核验。

参考文献

Yubo Song, Rui Kong, Takuro Umihara, 等. From Grid to Chip: Power Architecture, Stability, and Flexibility of AI Data Centers[J/OL]. (2026-09-10)[2026-09-30]. http://arxiv.org/abs/2609.11649v1.

Full text 中文海报
算电协同 论文图示
Research Article算电协同

Hosting Capacity Assessment of Data Centers with Voltage Ride-Through Capability in Power Systems

Pengyu Ren、Wei Sun、Fei Teng

Published 2026-09-03 · arXiv · Credibility S

Large data centers are emerging as concentrated, power-electronic grid loads whose abrupt disconnection or transfer to on-site backup supply during voltage disturbances can remove large demand from the power system, and may create a system-level stability problem. Their interconnection feasibility therefore depends not only on steady-state thermal and voltage limits, but also on whether internal power-conditioning s…

Abstract, interpretation and reference

Abstract

Large data centers are emerging as concentrated, power-electronic grid loads whose abrupt disconnection or transfer to on-site backup supply during voltage disturbances can remove large demand from the power system, and may create a system-level stability problem. Their interconnection feasibility therefore depends not only on steady-state thermal and voltage limits, but also on whether internal power-conditioning systems can maintain IT service while limiting customer-initiated load reduction. This paper presents a voltage ride-through (VRT)-aware data center and grid co-planning framework that couples transmission-level fault simulation with an internal data center ride-through model. Python-based dynamic simulations generate point-of-interconnection (POI) voltage trajectories under selected network faults, and the resulting waveforms drive an internal model incorporating IT and cooling-load dynamics, DC-link, Uninterruptible Power Supply (UPS) response, and converter apparent power limits. The IEEE 118-bus case study shows that internal VRT capability can become a binding interconnection constraint: steady-state planning alone can overestimate feasible data center capacity, whereas increased UPS converter headroom progressively restores hosting capacity. Under the reduced-order response models studied, the grid-forming mode provides greater ride-through margin than the current-limited grid-following mode under the same network fault conditions. The results further show that VRT constraints can materially change both the total hosting capacity of data centers and its spatial allocation across candidate interconnection buses.

中文解读

背景:AI 数据中心负载、功率密度和能源约束同步上升,算力负载与电网侧资源的协同调度正在成为智算中心设计的关键变量。问题:论文聚焦现有方案在效率、可靠性或工程协同上的瓶颈。方法:摘要显示作者采用框架构建和频域/系统级分析,把运行负载、冷却/能源系统和基础设施约束放在同一分析框架中。结果:研究重点指向AI 负载波动对电网设备寿命和调频边界的影响。意义:对日报读者而言,它可用于判断智算中心建设是否受电网容量、负载波动和调度机制约束。仍需结合全文实验条件、样本范围和成本假设核验。

参考文献

Pengyu Ren, Wei Sun, Fei Teng. Hosting Capacity Assessment of Data Centers with Voltage Ride-Through Capability in Power Systems[J/OL]. (2026-09-03)[2026-09-30]. http://arxiv.org/abs/2609.03030v1.

Full text 中文海报
算电协同 论文图示
Research Article算电协同

Exploiting the Benefits of V2B Application on Peak Shaving of Data Center Loads

Arya Joshi、Hamed Haggi、Chinmay Morankar

Published 2026-09-01 · arXiv · Credibility S

The accelerated growth in data center projects has introduced a demand-driven bottleneck throughout power grids and contributed to a substantial increase in carbon emissions. These concerns are fueling discussions on methods to use existing energy assets to drive operational efficiency. To this end, this paper explores the benefits of Vehicle-to-Building (V2B) applications to support peak shaving of data center cool…

Abstract, interpretation and reference

Abstract

The accelerated growth in data center projects has introduced a demand-driven bottleneck throughout power grids and contributed to a substantial increase in carbon emissions. These concerns are fueling discussions on methods to use existing energy assets to drive operational efficiency. To this end, this paper explores the benefits of Vehicle-to-Building (V2B) applications to support peak shaving of data center cooling loads. Initially, a literature review was conducted considering V2B constraints and optimization methods including SoC limitations, EV participation, tariffs, and building loads. This analysis was then used to develop a conceptual case study of a 10 MW data center in Loudoun County, VA by simulating a temperature-dependent load profile and adjusting the V2B participation of 40 commercial and passenger EVs. Simulation results indicate that, depending on seasonal variations in cooling load demands, strategic deployment of V2B assets between 12-5pm can offset gross cooling loads by 13-36%.

中文解读

背景:AI 数据中心负载、功率密度和能源约束同步上升,算力负载与电网侧资源的协同调度正在成为智算中心设计的关键变量。问题:论文聚焦现有方案在效率、可靠性或工程协同上的瓶颈。方法:摘要显示作者采用综述归纳和指标比较,把运行负载、冷却/能源系统和基础设施约束放在同一分析框架中。结果:研究重点指向AI 负载波动对电网设备寿命和调频边界的影响。意义:对日报读者而言,它可用于判断智算中心建设是否受电网容量、负载波动和调度机制约束。仍需结合全文实验条件、样本范围和成本假设核验。

参考文献

Arya Joshi, Hamed Haggi, Chinmay Morankar. Exploiting the Benefits of V2B Application on Peak Shaving of Data Center Loads[J/OL]. (2026-09-01)[2026-09-30]. http://arxiv.org/abs/2609.00204v1.

Full text 中文海报
算电协同 论文图示
Research Article算电协同

Flexible Training Workloads in Large-Scale AI Data Centers for Transient-Stability Support in Transmission-Constrained Power Systems

Jae-Kyeong Kim

Published 2026-08-31 · arXiv · Credibility S

The rapid expansion of large-scale artificial intelligence (AI) data centers is adding substantial, concentrated, and rapidly varying loads to transmission-constrained power systems. Although such load variations are generally regarded as operational challenges, this paper presents an alternative perspective in which the upward load flexibility of AI data centers could be coordinated for transient-stability support.…

Abstract, interpretation and reference

Abstract

The rapid expansion of large-scale artificial intelligence (AI) data centers is adding substantial, concentrated, and rapidly varying loads to transmission-constrained power systems. Although such load variations are generally regarded as operational challenges, this paper presents an alternative perspective in which the upward load flexibility of AI data centers could be coordinated for transient-stability support. To this end, this paper proposes training-induced load surge (TILS), a fast demand-side strategy that initiates or resumes flexible AI training workloads after fault clearing to increase active-power demand at electrically effective locations. The resulting load increase allows accelerating generators to supply additional electrical power, thereby reducing the accelerating-power imbalance and limiting the first-swing rotor-angle excursion. The underlying mechanism is first clarified in a single-machine infinite-bus (SMIB) system and then evaluated in the IEEE 39-bus system and a large-scale Korean power system. Results across all three systems demonstrate that TILS can increase the transient-stability-constrained generation limit. Larger responses, earlier activation, and siting at buses with a stronger electrical influence on the critical generators provide greater generation-limit increases. These results suggest that the upward load-response capability of AI data centers can provide complementary transient-stability support when sufficient electrical headroom, flexible workloads, and reliable grid-triggered activation are available.

中文解读

背景:AI 数据中心负载、功率密度和能源约束同步上升,算力负载与电网侧资源的协同调度正在成为智算中心设计的关键变量。问题:论文聚焦现有方案在效率、可靠性或工程协同上的瓶颈。方法:摘要显示作者采用文献摘要中的模型、实验或案例分析,把运行负载、冷却/能源系统和基础设施约束放在同一分析框架中。结果:研究重点指向AI 负载波动对电网设备寿命和调频边界的影响。意义:对日报读者而言,它可用于判断智算中心建设是否受电网容量、负载波动和调度机制约束。仍需结合全文实验条件、样本范围和成本假设核验。

参考文献

Jae-Kyeong Kim. Flexible Training Workloads in Large-Scale AI Data Centers for Transient-Stability Support in Transmission-Constrained Power Systems[J/OL]. (2026-08-31)[2026-09-30]. http://arxiv.org/abs/2608.30901v2.

Full text 论文栏目封面
智算中心论文栏目通用封面
Research Article算电协同

Grid-Forming E-STATCOMs for Stable Integration of Large-Scale Data Centers: Modeling and Control

Prabhat Ranjan Bana、Novan Zakkia、Jean-Philippe Hasler、Christer Danielsson

Published 2026-09-27 · arXiv · Credibility S

The rapid expansion of large-scale AI data centers (AIDC) is introducing new stability challenges, particularly in weak or low-inertia networks characterized by fast, step-like demand variations and strict requirements on voltage and dynamic performance. This paper investigates the use of grid-forming (GFM) Enhanced STATCOMs (E-STATCOMs) to support reliable integration of such facilities. A power-admittance-based li…

Abstract, interpretation and reference

Abstract

The rapid expansion of large-scale AI data centers (AIDC) is introducing new stability challenges, particularly in weak or low-inertia networks characterized by fast, step-like demand variations and strict requirements on voltage and dynamic performance. This paper investigates the use of grid-forming (GFM) Enhanced STATCOMs (E-STATCOMs) to support reliable integration of such facilities. A power-admittance-based linear modelling framework is developed to capture system interactions and is validated through detailed EMT simulations. The results demonstrate that E-STATCOMs provide fast, well-damped responses to abrupt load changes while effectively mitigating low-frequency oscillations and interactions with network resonances. By enabling tunable dynamic behavior via a load balancer, virtual impedance, and coordinated active-reactive power support, the proposed approach allows precise shaping of system response and improved regulation at the point of connection. These features make E-STATCOMs a flexible and scalable solution for integrating large data centers into weak grids and long transmission systems, supported by a design-oriented framework that facilitates parameter selection and performance assessment without extensive reliance on EMT studies to meet grid codes and AIDC interconnection requirements.

中文解读

背景:AI 数据中心负载、功率密度和能源约束同步上升,算力负载与电网侧资源的协同调度正在成为智算中心设计的关键变量。问题:论文聚焦现有方案在效率、可靠性或工程协同上的瓶颈。方法:摘要显示作者采用框架构建和频域/系统级分析,把运行负载、冷却/能源系统和基础设施约束放在同一分析框架中。结果:研究重点指向AI 负载波动对电网设备寿命和调频边界的影响。意义:对日报读者而言,它可用于判断智算中心建设是否受电网容量、负载波动和调度机制约束。仍需结合全文实验条件、样本范围和成本假设核验。