Thermally-driven quantum reservoir computing

This research explores thermally-driven quantum reservoir computing, where data is encoded through time-dependent thermal bath temperatures, shifting the memory-nonlinearity trade-off to the measurement channel. A key question is whether the non-universal impact of observable selection on computational power holds across different quantum systems.

arXivPreprint
Read the paper & insight

Compute–power coordination/ Related research

Joint Electricity Price and Load Forecasting for Data Center Battery Dispatch Using Polynomial Diffusion Models

This study adopts a computational modeling perspective to investigate the integration of polynomial diffusion models for joint electricity price and load forecasting in data center battery dispatch. A key design dimension to examine is how the conditional expectation properties of PDMs influence the dynamic programming framework's ability to adapt to varying market conditions and load patterns.

arXivPreprint

Computing & systems/ Related research

Halley: A Predictive Control Plane for Optical AI Data Center Networks

Halley's predictive control plane addresses resource management in optical AI data center networks by dynamically allocating reserves and prioritizing risk mitigation through formal guarantees. A key research question is how predictive scheduling and failure anticipation can be adapted to varying network topologies and resource constraints while maintaining deterministic performance bounds.

arXivPreprint

READING NOTEStart with the research insight, then examine the methods, comparisons and conditions.

RESEARCH & PERSPECTIVES

Papers & insights

Leave each paper with a question worth pursuing.

31 papers

Cooling & thermal management

01

Thermally-driven quantum reservoir computing

arXivPreprint
Research insight

This research explores thermally-driven quantum reservoir computing, where data is encoded through time-dependent thermal bath temperatures, shifting the memory-nonlinearity trade-off to the measurement channel. A key question is whether the non-universal impact of observable selection on computational power holds across different quantum systems.

Abstract & detailed commentary

Thiago Werlang, Daniel Valente

Source abstract

Heat generation limits computation, classical and quantum, from single logic gates to entire data centers. However, an in principle limiting physical factor can sometimes be turned into a resource. In reservoir computing, energy dissipation is what gives a reservoir its fading memory. Here, we introduce a paradigm where the data injection itself is encoded on the time-dependent temperature of a thermal bath. We derive an exact expression for the nonlinear response of any fixed readout, and prove a rigorous memory-nonlinearity trade-off which turns out to be a structural necessity, rather than a tunable dynamical regime, since the same coupling that injects data also enforces equilibration. We illustrate both results with a driven qubit, using a single free parameter, and with a pair of coupled qubits, where the breaking of a discrete symmetry opens a fifteen-dimensional space to a single observable, yet that observable alone recovers just over half of it. This refutes the misconception that large Hilbert spaces guarantee computational power. Our results relocate the memory-nonlinearity trade-off from the reservoir's dynamics to its measurement channel, pointing to observable choice and bath engineering (instead of Hamiltonian control) as the physical levers for a thermally-native quantum reservoir computer.

Original paperChinese poster

Compute–power coordination

02

Joint Electricity Price and Load Forecasting for Data Center Battery Dispatch Using Polynomial Diffusion Models

arXivPreprint
Research insight

This study adopts a computational modeling perspective to investigate the integration of polynomial diffusion models for joint electricity price and load forecasting in data center battery dispatch. A key design dimension to examine is how the conditional expectation properties of PDMs influence the dynamic programming framework's ability to adapt to varying market conditions and load patterns.

Abstract & detailed commentary

Matthew Van Ham, Yiping Liu, Xiaozhe Wang

Source abstract

The rapid growth of large-scale data centers (DCs) is increasing electricity demand, market volatility, and operating costs. Battery energy storage systems (BESSs) can mitigate these challenges by shifting electricity purchases from high-price to low-price periods. This paper proposes a real-time BESS dispatch framework using polynomial diffusion models (PDMs) to forecast both electricity prices and DC loads. Leveraging the closed-form conditional expectations of PDMs, the forecasts are integrated into a dynamic programming (DP) framework to minimize electricity procurement costs. Across the evaluated BESS configurations, the proposed approach achieves 2.63 times the cost savings of a rule-based (RB) strategy.

Original paperChinese poster

Compute–power coordination

03

Adaptive Grid-Mode-Aware Hybrid Energy Storage Control for AI Data Center Oscillation Mitigation

arXivPreprint
Research insight

This research investigates the dynamic adaptation of hybrid energy storage control in AI data centers by integrating real-time grid modal identification with mode-selective suppression, focusing on how shifting grid modes affect control efficacy and the potential for adaptive parameter tuning in response to varying oscillatory demands.

Abstract & detailed commentary

Quang Manh Hoang, Sina Mohammadi, Phi Long Nguyen, Wencong Su, Van-Hai Bui

Source abstract

Oscillatory power components in AI data-center demand can produce large frequency deviations when they coincide with vulnerable grid modes. Mode-aware hybrid energy storage systems (HESSs) can selectively suppress these components, but their effectiveness degrades when the grid mode changes while the control target remains fixed. This paper proposes a closed-loop grid-mode-adaptive HESS control framework that integrates measurement-based modal identification with mode-selective control. A sliding-window N4SID estimator identifies the local grid dynamics from grid-side power and frequency measurements, and the resulting natural-frequency estimate is used to retune the modal suppression branch assigned to the supercapacitor. The framework is evaluated under a grid-mode shift from 0.50 to 1.35Hz while maintaining equal physical damping and approximately equal load excitation at both frequencies. Compared with the fixed-target controller, the adaptive method reduces the post-change grid-side modal power component from 8.78 to 2.02MW, corresponding to a 76.94% reduction, and substantially lowers the resulting frequency deviation.

Original paperChinese poster

Compute–power coordination

04

Temporary gas turbines powering a US AI data center created a cross-state air pollution hotspot

arXivPreprint
Research insight

This research examines the cross-state air pollution impacts of temporary gas turbines used to power AI data centers, focusing on how regulatory frameworks and energy configurations influence pollutant dispersion and health risks across jurisdictions. A key design dimension to explore is the relationship between energy source selection and the spatial distribution of nitrogen dioxide emissions in unmonitored regions.

Abstract & detailed commentary

Will W. Qiang, Bo Huang, Xingjian Liu, Harry F. Lee

Source abstract

Data centers increasingly use on-site gas turbines that regulators can treat as temporary. Two satellites show the fleet powering SpaceXAI's Colossus 2 raised local nitrogen dioxide columns by about half as it expanded, the most anomalous increase among 656 urban locations nationwide since 2020. Mississippi authorized the fleet, but two-thirds of the hotspot's 116,000 mostly Black residents live in Tennessee, and the hotspot contains no regulatory nitrogen dioxide monitor. The fleet causes an estimated four premature deaths yearly, valued at $49 million, over 80% outside Mississippi and nearly all from units without selective catalytic reduction. On new turbines, this control's benefits exceed costs over the service life, but not over temporary stays or for in-state damages alone. Standards following the equipment could recover these benefits.

Original paperChinese poster

Computing & systems

05

Halley: A Predictive Control Plane for Optical AI Data Center Networks

arXivPreprint
Research insight

Halley's predictive control plane addresses resource management in optical AI data center networks by dynamically allocating reserves and prioritizing risk mitigation through formal guarantees. A key research question is how predictive scheduling and failure anticipation can be adapted to varying network topologies and resource constraints while maintaining deterministic performance bounds.

Abstract & detailed commentary

Manav Mishra, Krishna M. Sivalingam

Source abstract

A frontier AI model is trained in an AI data center, on tens of thousands of accelerators joined by a dedicated network, and every training step ends with all of them exchanging data at once. Between racks, that network is optical, and each of its four layers, from lasers to switches, runs a fixed or after-the-fact policy. Lasers sharing an enclosure, cooling, and power can fail together. At a fixed spare ratio, correlated failure provably caps a pool's availability however large it grows. In this paper, we present a comprehensive predictive control plane framework, called Halley, that reads each resource's next state and acts before the failure occurs. It has four components, each carrying a formal guarantee: LightReserve that sizes the laser pool to provide a coverage bound, FoldFit that schedules the switch within $11/9$ of the optimal, ThermaLead that holds a microring with one-step-ahead control, and TriageGuard that protects the highest-risk modules first. Halley gives each layer a predictive controller that defers to the deployed policy when unsure. Composed from simulations at that point, effective goodput, the share of ideal throughput kept, rises from 65.2\% to 76.5\% if a window that exhausts its spares is lost. If only the dark channels' bandwidth is lost, it reaches 67.4\%. Per megawatt, that is up to 1.03--1.17 times the training; for the same training, up to 3.3--14.7\% less data center capacity. \textsf{Halley}'s fallback circuits are formally verified and are shown to achieve close timing on a commercial FPGA, and pass a 130~nm signoff.

Original paperChinese poster

Compute–power coordination

06

Grid-Mode-Aware AI Data Center Power Smoothing via Bayesian-Optimized Hybrid Energy Storage System

arXivPreprint
Research insight

This research investigates the role of hybrid energy storage systems in grid-mode-aware control, focusing on how parameterized frequency-decoupling policies can mitigate oscillatory load components. A key design dimension to examine is the impact of varying energy storage configurations on the suppression of critical oscillatory patterns within dynamic power demands.

Abstract & detailed commentary

Sina Mohammadi, Quang Manh Hoang, Marcus Chen I Wada, Van-Hai Bui, Wencong Su

Source abstract

AI data centers exhibit highly stochastic, volatile power demands from intensive workloads and synchronized GPU training cycles, which can excite grid natural frequencies and threaten system stability. This paper proposes a real-time, forecasting-independent control framework utilizing a Hybrid Energy Storage System (HESS) that coordinates a Battery Energy Storage System (BESS) and a supercapacitor (SC). Employing a parameterized frequency-decoupling and active modal-damping policy, the framework mitigates critical oscillatory load components while smoothing overall power fluctuations. To bypass the heavy computational burden of online receding-horizon optimization, this work introduces an offline Bayesian Optimization (BO) approach to optimally tune real-time control parameters, minimizing a multi-objective cost function that balances grid compliance penalties and storage degradation. Numerical simulations demonstrate that the proposed method ensures grid stability and strong target envelope adherence. Specifically, it reshapes extreme 75-160 MW raw demand fluctuations to largely fit within a tight 10 MW target band, with only brief transient excursions, while attenuating the critical 20 MW oscillatory component below 1 MW to suppress resonant excitation.

Original paperChinese poster

Compute–power coordination

07

Dynamic Modeling of Transmission Networks, Grid-Following Inverters, and UPS-Based AI Data Centers

arXivPreprint
Research insight

This research presents a dynamic modeling approach for transmission networks and UPS-based AI data centers, focusing on the integration of grid-following inverters and power-electronic loads within a synchronous dq frame. A key design dimension to examine is the impact of smooth surrogate models for non-smooth operations on the continuous differentiability of discretized system representations.

Abstract & detailed commentary

Muhammad Hamza Ali, Amritanshu Pandey

Source abstract

This document presents dynamic models of a transmission network and average models of power-electronic devices and loads in the synchronous $dq$ frame. We model the network in the positive sequence and its synchronous generators with the classical swing equation and a first-order turbine governor. The power-electronic models cover grid-following inverters and AI data centers. Each inverter has a phase-locked loop, a power controller, and a current controller. Each data center connects to the grid through two step-down transformers. Its low-voltage bus feeds an IT load, an induction-motor cooling load, and a constant-impedance load. A double-conversion uninterruptible power supply (UPS) serves the IT load. We model its rectifier, grid-forming output inverter, battery, and bidirectional DC-DC converter. A measured GPU power trace drives the IT demand. We replace every non-smooth operation with a smooth surrogate. This keeps the discretized model continuously differentiable for the nonlinear solver. We also show how we initialize each model at its power-flow operating point.

Original paperChinese poster

AI & modeling

08

Market Efficiency and Capacity Investment under Flexible Price-Making Loads: A Computational Study

arXivPreprint
Research insight

This study examines the strategic use of temporal and spatial flexibility by price-making loads in relation to system capacity and renewable integration, highlighting how these flexibilities substitute for or complement thermal and transmission capacity. A key research question is how varying levels of renewable penetration influence the synergies between flexibility and transmission capacity in optimizing grid efficiency.

Abstract & detailed commentary

Aron Brenner, Deepjyoti Deka, Saurabh Amin

Source abstract

Large flexible loads such as data centers can shift consumption across locations and hours to lower their bills. We model a price-making consumer leading the system operator in a Stackelberg game and compare its shifts with a cost-minimizing planner's over a simulated RTS-GMLC year. Strategic temporal and spatial shifting capture 75% and 93% of the planner's savings, forgoing the rest mostly by withholding flexibility to protect favorable prices. Scarce capacity and abundant renewables raise this share for temporal shifting; scarce transmission lowers it for spatial shifting. Temporal and spatial flexibility substitute for thermal and transmission capacity, respectively, and complement renewables.

Original paperChinese poster

Resources & environment

09

Water as a Battery: Using Hydropower Flexibility to Support the Grid

arXivPreprint
Research insight

Hydropower dispatchability can change the preferred mix of wind, solar, and batteries, but the outcome depends on local resources and land availability. Data center energy planning should compare hourly supply availability and storage needs alongside those site conditions.

Abstract & detailed commentary

Chinmay Morankar, Abdullah Al Mehadi

Source abstract

This study presents a two-layer optimization framework to determine the optimal sizing of PV, wind, and battery storage co-located with existing hydroelectric plants to support rapidly increasing data center loads while minimizing cost, grid reliance, and transmission upgrades. The outer layer uses Particle Swarm Optimization (PSO) to select capacity combinations, while the inner layer performs rolling-horizon dispatch simulations to model hourly energy balance among PV, wind, hydro, and BESS, considering operational constraints. Two case studies were analyzed. At The Dalles Dam (Oregon), favorable wind resources and land availability enabled deployment of 111.2 MW PV and 117.9 MW wind, with no BESS required. Hydro flexibility allowed the system to meet the load with minimal grid support. In contrast, Conowingo Dam (Maryland) faced land constraints and limited renewables to 130 MW PV, leading to higher grid dependence. Co-locating hydro with renewables significantly enhances reliability and cost effectiveness by leveraging hydro's dispatchability to balance daily and seasonal variable generation from PV + Wind, reducing the need for storage or costly grid imports. This analysis provides a framework to meet the 99.9% availability targets of this new load type on the grid with sustainable energy resources.

Original paperChinese poster

AI & modeling

10

Multi-Timescale Deliverability of Shared Hybrid Storage for AI Data Center Campuses

arXivPreprint
Research insight

This research examines the multi-timescale coordination of shared hybrid energy storage systems to dynamically align commanded and delivered power in AI data center campuses, with a focus on validating the layered scheduling model's delay compensation effectiveness across varying campus scales.

Abstract & detailed commentary

Zihan Meng, Ruizhang Yang, Chenxi Hu, Francis Yunhe Hou

Source abstract

Artificial intelligence data center (AIDC) campuses contain sustained power variations and subsecond power fluctuations, requiring both sufficient stored energy and fast response. A shared hybrid energy storage system (HESS) can mitigate aggregate AIDC power deviations, but interval-based schedules cannot capture the delay between commanded and delivered power at the campus point of common coupling (PCC). To this end, this paper proposes a multi-timescale scheduling model for mitigating AIDC power fluctuations with the shared HESS. First, it models electrical pooling at the campus bus and constrains the shared HESS to a single PCC injection. Second, a two-layer model passes five-minute scheduled power, energy state, and reserve capacity to a causal fast response model that distinguishes commanded power from delivered power. Case studies using the National Laboratory of the Rockies (NLR) GenAI Power Profiles Dataset show reductions in both PCC and fast integral absolute error (IAE), while retaining most of the improvement available under ideal response.

Original paperChinese poster

AI & modeling

11

Identifiability-Guided Composite Load Modeling of AI Data Centers

arXivPreprint
Research insight

An accurate fit to aggregate power can still hide errors in identifying the cooling branch. Load models for transient studies should make clear what branch measurements, protection rules, and reconnection assumptions allow to be identified.

Abstract & detailed commentary

Ding Lin, Jianhui Wang, Meng Yue, Tianqiao Zhao

Source abstract

The rapid growth of AI data centers introduces large, workload-dependent loads whose protection and reconnection behavior can affect power-system transient stability. Calibrating dynamic models of such loads is challenging because treating all associated elements as freely estimable may lead to weakly identified or physically confounded parameterizations. This paper proposes an identifiability-guided calibration framework for a composite load model with separate IT, cooling, and auxiliary branches. A nuisance-projected Fisher-information criterion characterizes the local identifiability of the cooling-motor composition, while a workload non-equivalence result shows that voltage-only recalibration cannot reproduce workload-dependent responses. Guided by these results, a grey-box estimator trained with branch-level supervision learns the workload-to-power relation and the cooling composition, while retaining a prescribed UPS protection law and an externally anchored reconnect-ramp duration. The learned workload relation is then distilled into a closed form for transient-stability simulation. Evaluation using 300,000 MIT Supercloud GPU power-utilization samples and 12,600 IEEE 39-bus fault scenarios yields an aggregate active-power $R^2$ of 0.948, compared with 0.856 for an LSTM baseline. Removing branch-level supervision preserves relatively high aggregate accuracy but substantially degrades cooling-component recovery. Under unseen deep voltage sags, the proposed model achieves a transient $R^2$ of 0.750, compared with 0.033 for the LSTM. Closed-loop simulations further show that cooling composition and protection behavior can affect retained-load states and voltage responses near protection thresholds.

Original paperChinese poster

Compute–power coordination

12

Degradation Aware V2G Dispatch for Co-Optimization of Parking Facility and Edge Data Center Located in the Airport Campus

arXivPreprint
Research insight

Adding bidirectional chargers may reduce peaks further without increasing operator profit, because battery wear and payments to vehicle owners also affect the economics. V2G sizing should jointly assess peak-reduction value, owners' participation conditions, and the incremental cost of equipment.

Abstract & detailed commentary

Abdullah Al Mehadi, Hamed Haggi, Chinmay Morankar

Source abstract

This paper studies an airport campus where long stay EV parking, airport buildings, and an AI data center share a single grid connection. The campus pays a commercial electricity tariff that charges for both the energy used and the highest power drawn during peak hours. Parked EVs can send power back to the campus through vehicle to grid (V2G) chargers and lower this peak. This paper proposes a two stage method. In the first stage, a linear program schedules EV charging and discharging to maximize the operator's profit and also sets a fixed daily payment to EV owners. In the second stage, a search chooses the share of energy savings paid to owners. The model guarantees that every owner is paid enough to take part, pays for battery wear so that EVs discharge only when it is worth the wear, and assigns charging ports on a first come, first served basis. In the case study, 400 V2G chargers are added to 1200 existing Level 2 chargers, serving 5000 expected sessions under summer and winter rates. In a summer week, V2G raises operator profit by $4978 compared with smart charging and lowers the high peak demand by 4400 kW (9%). The best contract gives owners 70% of the energy savings and earns 21% more than a fixed payment alone. Doubling the V2G ports to 800 lowers the peak further but reduces profit, because owner payments grow faster than the savings. V2G pays back within 10 years if a bidirectional charger costs less than about $1800 more than a standard one. Compared with a 5 MW/10 MWh stationary battery, V2G cuts more peak demand at $409 of investment per kW instead of $1522 and needs no extra land, while the battery does not pay back within its lifetime.

Original paperChinese poster

Compute–power coordination

13

On the Stability of Power Systems with AI Data Centers: A Multi-Equilibrium Switched DAE Framework

arXivPreprint
Research insight

Switching between GPU computation phases changes both the power system's equilibrium and the consistency conditions on its state. Stability assessment should examine switching sequences, dwell times, and stochastic transitions alongside steady-state behavior.

Abstract & detailed commentary

Vishal Shenoy, Damola Ajeyemi, Mahmoud Abdelgalil, Guido Cavraro, Emiliano Dall'Anese, Jorge I. Poveda

Source abstract

The rapid growth of Artificial Intelligence (AI) data centers is introducing dynamic loads into power transmission systems as GPU clusters switch between computational phases with distinct power demands. These dynamics are naturally modeled by switched affine differential-algebraic equations (DAEs), where each mode induces a different equilibrium and consistency space. We study their stability using control and hybrid systems tools. Differential projectors derived from the quasi-Weierstrass form yield an equivalent hybrid representation, from which we characterize the $ω$-limit set and establish Lyapunov conditions for practical stability with an explicit $\mathcal{KL}$ bound accounting for switching-induced resets. For stochastic inference workloads, we use Foster--Lyapunov techniques to establish probabilistic uniform global recurrence under mode-dependent dwell times and transition probabilities. The framework is validated on the IEEE 39-bus transmission network with co-located AI data centers using high-fidelity electromagnetic transient simulations of deterministic training and stochastic inference workloads.

Original paperChinese poster

Resources & environment

14

Generalized green and red concepts for artificial intelligence, big data, and information and communication technologies: Multidimensional framework and countermeasures

arXivPreprint
Research insight

AI sustainability impacts extend through electricity, water, materials, and the use of services; improving one efficiency metric does not establish a lifecycle benefit. A common system boundary is needed before comparing the resource costs of different technology choices.

Abstract & detailed commentary

Jinsong Wu, Yixin Xiao, Haowei Bi, Huamin Fang

Source abstract

The rapid expansions of artificial intelligence (AI), big data (BD), and information and communication technologies (ICT) are driving substantial growth in electricity, water, and material demands, with data centers projected to consume 6.7--12\% of U.S. electricity by 2028 (up from 4.4\% in 2023) and AI-related water demand estimated at 4--6 billion m$^3$ annually by 2027. Existing ``green AI'' and ``red AI'' discussions have largely emphasized computational efficiency and carbon emissions, providing limited guidance for lifecycle trade-offs, service-versus-use impacts, and broader sustainability externalities beyond energy. To bridge this gap, this paper proposes generalized green AI (GGAI) and generalized red AI (GRAI) and extends the taxonomy to red BD (RBD) and red ICT (RICT) as well as red electronic and electrical engineering (REEE) \& red digital technologies (RDT) under a unified Environmental-Economic-Social-Technical/Operational (E/Ec/S/T) framework. Based on representative footprint indicators in the large-model era (electricity, carbon, water, and e-waste), we analyze how risks propagate across AI-BD-ICT stacks and across service-use boundaries. We further organize actionable countermeasures into a four-tier taxonomy aligned with the Environmental-Economic-Social-Technical/Operational framework: metric-level reform for accountability, revision of information and communication technologies design principles and demand shaping, efficiency-oriented LLM development practices (data, model, training, and scaling), and energy-infrastructure transition. The proposed framework operationalizes the Environmental-Economic-Social-Technical/Operational-aligned assessment and intervention prioritization across the AI-BD-ICT stacks, enabling sustainability-by-design without sacrificing utility.

Original paperChinese poster

AI & modeling

15

Locked In: Multi-Objective RL for the AI Data Center Build-Out

arXivPreprint
Research insight

Siting, power procurement, and cooling commitments can lock in capital and resource use for years, so an initial site score cannot represent lifetime performance. Planning models should preserve irreversibility, retrofit timing, and the consequences of forecast error.

Abstract & detailed commentary

Satyapragnya Kar, Rajarshi Das, PR Panigrahi

Source abstract

AI data center build-out is a multi-trillion-dollar, multi-decade infrastructure program. Yet siting, power procurement, and cooling decisions are still made with static, single-point scoring tools. These tools are evaluated once, on day-zero numbers. This is a poor fit. A site's water, power, and carbon profile drifts substantially over the 10 to 20 year asset life. The governing decisions are also irreversible, and they bind capital and physical plant for years. We formalize long-horizon build-out as a tiered multi-objective Markov decision process. Strategic commitments are gated to discrete windows, incur switching costs, and energize only after source-dependent lead times. Operational dispatch is restricted to capacity that physically exists. We solve the problem with a preference-conditioned multi-objective agent that has a semi-Markov manager and worker hierarchy. The agent recovers a family of policies that a planner can steer across cost, carbon, water, and reliability at inference time. We validate long-horizon dynamics with a lightweight counterfactual rollout model. Across three commitment regimes (irreversible, reversible, and commit-once) on real site data, preference conditioning yields a confirmed, steerable trade-off on both objective pairs in every regime. Imposing lock-in produces a more evenly covered frontier and a far more consistent rate of anticipatory retrofit ahead of a binding water-stress constraint than a freely reversible formulation. Finally, a compact counterfactual dynamics model tracks slow-moving state well. It is measurably outperformed by simple persistence on the water-stress axis. We report this limitation rather than obscure it. We release the environment, agents, baselines, and evaluation harness. All of them are grounded in real interconnection-queue, water-stress, and grid-emissions data.

Original paperChinese poster

Computing & systems

16

Democratizing LLM Training with the Edge: Challenges, Systems, and the Road Ahead

arXivPreprint
Research insight

Distributed LLM training depends on communication, compression, and fault tolerance that can accommodate heterogeneous clients and unreliable links. Stable convergence across university sites motivates further testing with larger models and different privacy requirements.

Abstract & detailed commentary

Ziyue Luo, Jiaxuan Cai, Cedric LeDenmat, Srijith Nair, Fatemeh Nourzad, Rohith Krishnan, Qinhang Wu, Jifan Zhang, Sungjae Lee, Zhe Li, Peiwen Qiu, Siddharth Shah, Rishabh Sharma, Sundararajan Srinivasan, Yinglun Xia, Xue Zheng, Zidong Liu, Bicheng Ying, Kaushik Chowdhury, Gauri Joshi, Yingbin Liang, Robert Nowak, Srinivasan Parthasarathy, Saurav Prakash, Balaraman Ravindran, Sanjay Shakkottai, Ness B. Shroff, Haibo Yang, Aylin Yener, Jia Liu

Source abstract

The growing computational power of modern GPU data centers has let a few industrial giants train and deploy large language models (LLMs) on massive amounts of data. Yet the sheer scale of these models and their training data makes centralized development increasingly hard to sustain, and at the same time shuts out smaller institutions that hold relevant private data but lack comparable infrastructure. In this paper, we organize our positions on distributed LLM training around the pretraining and fine-tuning paradigms, covering federated learning, split learning, and decentralized approaches, and we assess their readiness for geo-distributed settings with heterogeneous hardware and unreliable connectivity. We then present a {\em unified} system architecture built around a cloud-hosted parameter server that coordinates heterogeneous clients over outbound gRPC connections, reusing one communication, compression, and fault-tolerance stack for both pretraining and a family of fine-tuning methods. We validate the design with real geo-distributed experiments on GPT-2 Medium and Llama3-1B pretraining across multiple university sites, showing stable convergence under realistic conditions. Finally, we chart the road ahead, identifying open problems that span frontier model support, elastic fault tolerance, adaptive compression, federated alignment, privacy and trust, incentive design, and system--algorithm co-design, all of which must be addressed to make democratized LLM training a reality.

Original paperChinese poster

Compute–power coordination

17

Comparative Analysis of Large Load Interconnection Requirements Across U.S. Transmission Entities

arXivPreprint
Research insight

Data centers' potential to support grid operation needs to be expressed through explicit, comparable interconnection requirements. Checking load models, fault ride-through, and dispatchability item by item can help turn a connection request into a demonstration of operating capability.

Abstract & detailed commentary

Rafi Zahedi, Rahul Anilkumar, Amin Zamani

Source abstract

The rapid growth of large loads, especially data centers driven by artificial intelligence, is creating unprecedented demands on the North American electric grid. Data centers now account for nearly 80% of large load interconnection requests in the Western Interconnection, and U.S. electricity consumption from data centers is projected to reach 325-580 TWh by 2028. Despite this urgency, technical interconnection requirements for large loads have not yet matured and still contain several gaps. This paper presents a comparative analysis of large load interconnection requirements across eleven U.S. entities, including AEP, Ameren, CAISO, Dominion, Duke Energy, ERCOT, LIPA, MISO, PJM, Southern Company, and SPP, under seven technical categories: large load definition, load data and modeling, fault ride-through, load curtailment and shedding, dispatchability, power quality, and reactive power control. The analysis reveals significant variation in both the scope and specificity of requirements. LIPA addresses all seven technical categories at least partially, while Dominion and Duke Energy provide detailed coverage across nearly all categories. The analysis also finds that data center applicants can be viewed as potential grid resources, rather than only as consumers. The findings provide a structured baseline from which utilities, regulators, ISOs/RTOs, and developers can identify gaps, benchmark against peers, and accelerate the development of interconnection standards.

Original paperChinese poster

Compute–power coordination

18

Execution-Feasible Dispatch of LLM Pre-training Loads for Renewable-Dominant AI Data Centers

arXivPreprint
Research insight

Checkpointing creates grid flexibility only when waiting can be paired with executable parallel modes that recover the required training progress. Dispatch models should constrain their flexibility claims with throughput, memory capacity, and completion requirements.

Abstract & detailed commentary

Xi Tong, Ershun Du, Haiyang Jiang, Long Chen, Qin Wang

Source abstract

AI data centers (AIDCs) are emerging as large power-system loads, making their operational flexibility increasingly valuable. Existing studies often treat AIDC demand as continuously adjustable or generically delay-tolerant, which overstating the flexibility of large language model (LLM) pretraining. This paper proposes an execution-feasible dispatch framework for LLM pre-training in renewable-dominant AIDCs. LLM descriptors are first converted into checkpoint-domain daily workloads, then mapped to feasible 3D-parallel GPU modes with explicit throughput, GPU-capacity, memory, and IT-power limits. The resulting checkpoint- and mode-constrained load states are embedded into a day-ahead power dispatch model. Case studies on a 2048 GPUs AIDC with two LLaMA pretraining tasks show that checkpoint-aware 3D dispatch reduces operating cost by 20.02% and renewable curtailment from 1.077 to 0.014 MWh relative to fixed continuous training. Related results also show that checkpoint records alone do not create load flexibility,practical grid-interactive flexibility arises from checkpoint waiting combined with execution-feasible 3D-mode compensation.

Original paperChinese poster

Compute–power coordination

19

Virtual Transmission Lines from Data Center Workload Migration: Coordinated Multi-Year Transmission Expansion Planning

arXivPreprint
Research insight

Workload migration can relieve transmission congestion by changing where electricity is consumed and can complement physical line expansion. Its planning value remains constrained by bandwidth, latency, and workload balance, so it cannot be taken to eliminate the need for grid reinforcement.

Abstract & detailed commentary

Mengxin Zhu, Qian Kai, Yadong Liu, Yingjie Yan, Haoyu Zhao

Source abstract

The rapid growth of electricity demand from AI data centers is creating a dual mismatch in power systems: a temporal mismatch between fast-rising demand and slow transmission expansion, and a spatial mismatch between concentrated data-center loads and geographically dispersed renewable resources. These mismatches can exacerbate transmission congestion, resulting in unserved data-center load and renewable-energy curtailment. This study models geographic workload migration as a virtual transmission line (VTL) that changes nodal data-center demand without transferring physical electricity. A mixed-integer linear programming model is then developed to co-optimize multi-year candidate-line construction and workload migration, subject to construction delays, renewable-energy curtailment, unserved data-center load, workload-balance requirements, communication-bandwidth constraints, and link-latency limits. The model is evaluated over an eight-year planning horizon on a modified IEEE 14-bus system. The results show that coordinating VTL with physical transmission expansion reduces total system cost, unserved data-center load, and renewable-energy curtailment while alleviating transmission congestion. VTL-aware planning also requires one fewer candidate line than build-only planning. However, VTL alone cannot meet system demand and does not eliminate the need for physical transmission reinforcement. Sensitivity analysis indicates that VTL provides the greatest value when transfer capacity is tight, construction costs are high, load growth is rapid, and data-center flexibility is greater. Additional validation on the IEEE 118-bus system over a five-year planning horizon shows that coordinated planning retains its cost and reliability benefits while reducing physical expansion requirements.

Original paperChinese poster

Compute–power coordination

20

Large-Scale Data Center Integration in Power Systems: Uncertainty and Multi-Scale Variation

arXivPreprint
Research insight

Workloads with similar peak power can impose different grid requirements because their power fluctuations occur at different frequencies. Interconnection studies should characterize both temporal variation and uncertainty in realized demand, while keeping observed workload signatures within the scope of the measured samples.

Abstract & detailed commentary

Le Xie, Dongjoo Kim, Qian Zhang, Grant Ruan, Paul L. Joskow

Source abstract

Hyperscale artificial intelligence (AI) data centers are emerging as a structurally new class of electricity demand. Unlike conventional loads, they materialize as spatially concentrated, transmission-level point loads with rapid deployment timelines and converter-dominated dynamics. Their integration is governed by two defining properties: forecast uncertainty in load realization and multi-scale temporal variation spanning sub-seconds to planning horizons. We develop a unified framework that links reliability and affordability to these dimensions through a four-quadrant structure: (reliability, affordability) $\times$ (uncertainty, variation), which integrates probabilistic resource adequacy, generation and transmission expansion, operational security, and market design. Measured traces from a public generative-AI workload dataset show strongly tonal GPU power spectra rather than smooth broadband behavior: harmonic combs at the training-step cadence, and a distinct sub-second periodicity in inference. Across these traces the dominant variance band shifts with workload type (seconds for training and offline inference; tens of seconds and longer for online inference). We report this as a characterization of the measured workloads rather than a universal signature, and take it to indicate that such loads warrant a spectral description rather than a peak-demand one. These signatures directly affect reserve requirements, ramping products, voltage stability, ride-through performance, and harmonic interactions in converter-rich grids. Taken together, the analytical framework and empirical results establish a system-level basis for assessing the reliability and cost implications of large AI data center integration across planning and operational horizons.

Original paperChinese poster

AI & modeling

21

Watts If? A Benchmark for Counterfactual Reasoning About the AI Data Center Buildout

arXivPreprint
Research insight

Answering a siting question does not show that a model can enumerate every action still available at a decision point. Evaluations of LLM-assisted infrastructure planning should check action completeness, irreversible commitments, and counterfactual paths.

Abstract & detailed commentary

Pankaj Chouhan, Rajarshi Das, Aditya Dubey, Manminder Tomar, Sreekar Reddy, Samta Sharma, Satyapragnya Kar, PR Panigrahi

Source abstract

An AI data center is committed years before it draws a watt: a few discrete choices (grid or on-site gas, evaporative or dry cooling, which county to file in) fix its capital, water draw, and carbon path, and LLMs are now asked to help screen them with no test of whether they track what each commitment rules out. We introduce DCBench-440, with two arms reported separately: 200 generative questions over STRIPS worlds for five US deal archetypes, with search-verified gold answers and no tested shortcut above 12% on any question type, and 240 multiple-choice questions grounded in quoted site records, emission equations, and stated scenarios. Across open-weight deployments, accuracy spans 12.5-71.5% (generative) and 58.3-92.5% (multiple choice). One skill fails everywhere: asked to list every action available at a decision gate, no model exceeds 4.0% exact match. The strongest list 72-85% of the actions that would change the project's state but omit most permitted actions that change nothing; with those excused, the best exact match is still 24%. Code, data, and other materials are available upon request.

Original paperChinese poster

AI & modeling

22

Trajectory Sensitivity-Based Dynamic Assessment of an AI Data Center Under Contingencies

arXivPreprint
Research insight

Trajectory sensitivities can quickly identify influential parameters, but their predictions describe local changes around a given disturbance trajectory. Operational use should specify the disturbance and parameter ranges and check the estimates against nonlinear simulation.

Abstract & detailed commentary

Arnav Bagga, Saskia A. Putri, Abhishek Banerjee, Xiaofan Wu

Source abstract

Artificial Intelligence (AI) data centers are emerging as converter-dominated, parameter-rich electrical systems whose dynamic response depends on fast workload-driven demand variations, tightly regulated data-hall converters, and coordinated on-site sources. Assessing such systems by repeatedly solving nonlinear time-domain models for every outage, load realization, and parameter perturbation is computationally expensive and provides limited insight into response sensitivity. This paper presents a trajectory sensitivity (TS)-based dynamic assessment framework for a self-contained AI data center supplied by a 2 kV DC microgrid with a grid-tied interface. The model includes time-varying data-hall load profiles, a voltage source converter (VSC), battery energy storage systems (BESS) units, supercapacitors, and synchronous-generation-side sources. For each disturbance, firstly, TS are computed along the nonlinear disturbance trajectory, capturing the local effect of source trips, data-hall outages, converter controls, and load ramps. Later, the computed TS data is used to estimate system trajectories under simultaneous parameter perturbations. Validation against full nonlinear ODE simulations with $\pm 15\%$ perturbations shows close agreement. In addition, the TS-based approach reduces computational time of dynamic-response evaluations from seconds to milliseconds, demonstrating its potential as a scalable screening tool for AI data center dynamics.

Original paperChinese poster

Compute–power coordination

23

Impact of Data Center Load on Co-Optimized Generation and Transmission Expansion Planning with Embedded Unit Commitment

arXivPreprint
Research insight

In the reported planning case, a large added load shifts the preferred investment from transmission reinforcement to generation, with operating costs dominating long-term expenditure. Planning comparisons should jointly examine load siting, unit commitment, and regional supply conditions before applying that result elsewhere.

Abstract & detailed commentary

Haoxiang Wan, Xingpeng Li, Jonghwan Kwon

Source abstract

The rapid growth of hyperscale data centers challenges grid expansion planning, yet existing studies focus largely on operational flexibility rather than long-term investment decisions. This paper examines how large data center loads sited at multiple buses affect co-optimized Transmission Expansion Planning (TEP) and Generation Expansion Planning (GEP). The problem is formulated as a multi-year, Unit Commitment (UC)-embedded mixed-integer linear program on the modified IEEE 24-bus Reliability Test System (RTS-24) with Electric Reliability Council of Texas (ERCOT)-calibrated renewable energy profiles. A 500 MW data center load, about 17.5% of the base-year peak, is allocated across four buses by voltage level, generation headroom, renewable co-location, and network connectivity. Integrating this load raises the 15-year net present value of total system cost by 1,794 million USD (+61.6%) and the system-average locational marginal price (LMP) by 45.2%, with operating cost dominating capital investment (84.2% versus 15.8%). Renewable curtailment remains negligible: existing renewables are already near full utilization, so the added demand is served almost entirely by incremental thermal generation. Most notably, the load shifts the optimal plan from transmission-only to generation-only, replacing the base-case 230 kV reinforcement with a new 400 MW combined-cycle gas turbine and showing that strategically sited generation can substitute for network reinforcement.

Original paperChinese poster

Compute–power coordination

24

A Power-Trajectory Framework for Data Center Participation in Day-Ahead Markets

arXivPreprint
Research insight

Equal energy blocks can conceal different power trajectories, with consequences for generation ramping and settlement. Market design should align demand trajectories, generation constraints, and prices on the same time basis while separating representation errors from remaining supply-side compensation.

Abstract & detailed commentary

Menghan Zhang, Caisheng Wang

Source abstract

The rapid expansion of artificial intelligence (AI) is driving substantial growth in data center electricity demand. Interval-based energy blocks in day-ahead markets do not explicitly retain predictable intra-interval demand evolution, potentially creating mismatches with ramp-feasible generation trajectories and affecting settlement. This paper proposes a power-trajectory framework in which data centers declare predictable aggregate demand evolution through continuous demand-side power trajectories before market clearing. The declared trajectories are treated as exogenous inputs for constructing generation trajectories and the corresponding price trajectory. For feasible market-clearing outcomes, physical temporal consistency is established through continuous-time power balance and satisfaction of the modeled generation operating constraints, while economic temporal consistency is established by preserving the dispatch-price correspondence in energy settlement on a common temporal basis. Under the adopted settlement definitions, a trajectory-based settlement analysis separately quantifies the monetary magnitude of representation-induced power imbalances and the supply-side compensation that may remain under temporally consistent clearing and settlement. An illustrative 5-bus case demonstrates the elimination of representation-induced power imbalance and identifies the timing and physical sources of supply-side compensation. A modified IEEE RTS-GMLC case further illustrates these compensation effects across multiple generating units under workload-driven data center demand variations.

Original paperChinese poster

AI & modeling

25

Converter-Aware Coordination of Computing Flexibility in Behind-the-Meter Data Centers

arXivPreprint
Research insight

A task's ability to shift in time does not guarantee that its resulting power trajectory is electrically feasible. Workload schedules need joint checks against converter, voltage, and network limits before their flexibility can be assigned operational value.

Abstract & detailed commentary

Ruolan Cui, Ruizhang Yang, Chenxi Hu, Franxis Yunhe Hou

Source abstract

Data centers are emerging as large electricity consumers whose demand can be reshaped through workload scheduling. However, computing flexibility in behind-the-meter facilities does not automatically translate into electrically realizable power flexibility. Ignoring converter and network operating limits may cause converter overloads, protection trips, and interruptions to power supply and computing services. This paper proposes a converter-aware intraday scheduling methodology. First, a task-level mixed-integer linear formulation preserves synchronous training configurations and completion requirements, while Minkowski-sum aggregation and Shapley--Folkman convexification yield a linear inference-pool representation without unit-level binary variables. The latter admits a conditional relative relaxation-gap bound that decreases inversely with pool size. Second, a four-node electrical model links computing demand, on-site injections, and grid exchange to converter and network limits through lifted voltage variables and second-order cone relaxation. Finally, a mixed-integer model coordinates workloads, photovoltaic generation, energy storage, and grid purchases. Case studies show that electrical limits reshape scheduling and renewable utilization, while on-site resources reduce grid dependence. Under the studied conditions, fixed training cannot support full inference service within voltage limits, whereas coordinated scheduling achieves negligible inference shortage and passes verification against the original alternating-current model. These findings demonstrate the role of computing--electrical coordination in realizing the operational value of workload flexibility.

Original paperChinese poster

Computing & systems

26

Capturing Electrical Windows Through Reconfigurable Optical Networks: Transfer-aware Scheduling of Multi-Region AI Data Centers

arXivPreprint
Research insight

A low-price or renewable-rich period becomes a usable migration window only if the checkpoint arrives in time for training to resume. Cross-region scheduling should verify feasibility against transfer delays, shared-link capacity, and optical network reconfiguration.

Abstract & detailed commentary

Xi Tong, Zijian Li, Xiaoyi Fan, Cong Zhang, Ershun Du, Qin Wang

Source abstract

Artificial-intelligence data centers (AIDCs) can provide spatiotemporal load flexibility by migrating training workloads in response to regional electricity prices and renewable-energy (RE) availability. However, transfer-blind scheduling may overestimate migration benefits by overlooking transfer time or prevent training from resuming within renewable-rich or low-price windows when considering transfer time. This paper proposes a transfer-aware compute-electricity-network scheduling framework that coordinates training placement, checkpoint transmission, and optical circuit switching (OCS) to improve local RE utilization and reduce grid-purchase cost. A compact compute-electricity master problem generates candidate schedules using estimated transfer delays. The framework then schedules optical circuits, verifies checkpoint delivery under shared-link capacity constraints, and revises infeasible schedules using updated delay estimates. It integrates day-ahead planning, event-triggered intraday updates, and real-time dispatch. In a five-AIDC benchmark with equal completed work and network resources, the proposed method reduces the real-time grid purchase cost by 12.50% and increases the local RE utilization by 2.724 percentage points relative to static optical operation. Sensitivity and ablation analyses indicate that OCS is particularly beneficial when renewable-rich or low-price windows shift across sites and network bottlenecks hinder timely checkpoint delivery.

Original paperChinese poster

Computing & systems

27

FALCON: FPGA-Accelerated Latency-Certifiable Occupancy Networks for Camera-Based Autonomous Driving

arXivPreprint
Research insight

Safety-critical computing needs an explicit account of worst-case delivery time and the output returned when a deadline is missed. Cycle bounds, measured latency envelopes, and full-pipeline performance should be reported separately so that guarantees from proxy tests remain within their tested scope.

Abstract & detailed commentary

Haohua Que, Mingkai Liu, Handong Yao

Source abstract

A perception system that must brake for a pedestrian does not need a low average latency. It must deliver an answer before the deadline on every frame, the worst case included. Commodity edge accelerators optimize the mean through dynamic scheduling, OS jitter, thermal throttling, and contention, so their per-frame latency can be measured but not bounded. We build FALCON, a camera-based 3D occupancy front-end on the AMD Kria KR260, an embedded FPGA drawing 4.3 W idle and up to 6.6 W under inference, and make the latency guarantee layered and explicit: programmable-logic (PL) compute is cycle-bounded analytically; inference is a measured envelope over 100k-frame traces; and a watchdog enforces output delivery, publishing the previous output flagged stale when a frame is late. The deadline runs use a fixed-work proxy of six ResNet-50 DPU inferences per frame, not the full occupancy network: across three 100k-frame enforced runs, all 300k proxy frames delivered an output within the 100 ms deadline plus at most 10.2 ms, the worst of the three runs. The full six-camera FlashOcc pipeline composes to about 1.3 s per frame on the board and is not yet a 10 Hz system. The two operations the DPU cannot run, a view-transform gather and a bilinear resize, become fixed-trip-count PL IPs numerically matched to their software references. On the full Occ3D-nuScenes validation set the board reaches mIoU 29.88, 92.8% of an FP32 baseline the DPU cannot run. On a ResNet-50 probe over 100k frames the KR260 tail stays within 1.5 times its median (2.0 times for the six-inference proxy), where Jetson Orin reaches 4.4 times and the worst datacenter GPU run (NVIDIA L4) 23.6 times. The deployment recipe, HLS sources, and raw timing traces are released.

Original paperChinese poster

Compute–power coordination

28

A Critical Review of Grid Integration Challenges and Flexibility Opportunities for Large-Scale Data Centers

arXivPreprint
Research insight

This research perspective focuses on the unique operational demands of high-density data center loads on distribution networks, emphasizing underexplored distribution-level issues such as harmonic propagation and transformer derating. A critical design dimension to examine is the specific mechanisms by which renewable energy co-location affects grid stability.

Abstract & detailed commentary

Bibek Dhakal, Manohar Chamana, Biswambhar Gayen, Jatendar Kumar, S M Shams Rahman, Aaqib Peerzada, Ki Yeob Lee, Olatunji M. Adeyanju, Bhaskar Mitra, Stephen Bayne

Source abstract

The rapid proliferation of cloud computing and artificial intelligence workloads is fundamentally reshaping the magnitude, spatial concentration, and electrical characteristics of data center power demand. Data centers differ from conventional commercial loads because they combine high rack densities, converter-dominated interfaces, thermally coupled cooling, uninterruptible power supplies, programmable workloads, and increasingly complex behind-the-meter generation and storage within a single facility. This review examines their grid integration from utility and sustainable-energy perspectives across resource planning, large-load interconnection, distribution feeders, market operation, real-time dynamics, power quality, and asset management. Particular attention is given to distribution-level issues that receive limited treatment in broader energy reviews: bidirectional operation on renewable-rich feeders, harmonic propagation and resonance, ride-through and reconnection, transformer derating, cable ampacity, neutral-conductor heating, protection, and measurement. Static, composite, physics-based dynamic, calibrated, impedance, electromagnetic transient, and hybrid load models are compared according to study purpose and data requirements, and utility coordination platforms, uninterruptible power supply and battery control, workload flexibility, renewable co-location, cogeneration, fuel cells, thermal storage, and clean firm supply are assessed. The central finding is that requested peak demand and annual energy matching alone cannot establish reliable or sustainable integration. Credible assessment must consider hourly and locational supply, network deliverability, marginal emissions, lifecycle and water impacts, backup obligations, rebound, asset health, and verified operating capability.

Original paperChinese poster

Cooling & thermal management

29

Modeling Liquid-Cooled Data Centers in EnergyPlus

arXivPreprint
Research insight

Coupling facility water loops and chip junction temperatures in one solver helps trace where liquid cooling saves energy. The benefits of a warm-water design should be tested across climate, workload, and the boundary used to account for on-site water use.

Abstract & detailed commentary

Yun-Dam Ko, Dipashreya A. Sur, Cade Napier, Carlos D. Díaz-Marín, Rishee K. Jain

Source abstract

As AI workloads accelerate data center transition toward high-density racks with direct-to-chip (DTC) liquid cooling, existing simulation tools remain limited in evaluating whole-building and multi-year efficiency. To bridge this gap, we develop a native EnergyPlus object, ElectricEquipment:ITE:LiquidCooled, that models DTC liquid cooling for chilled-water and warm-water architectures as plant-loop components. It couples facility-water loops, rack-side secondary loops, coolant distribution units, and chip-junction temperatures within a single solver. Validation against an independent Modelica implementation across 21 operating conditions, including two full-year runs compared at one-minute resolution, yields loop-temperature RMSE at or below 0.021 K, well within the 0.1 K acceptance threshold. Our case study demonstrates that warm-water liquid cooling reduces annual PUE from 1.43 to 1.25, eliminates on-site water use, and cuts total facility energy by 37.9% relative to an air-cooled baseline. By embedding liquid-cooling logic into EnergyPlus, our work provides whole-building, long-term energy modeling for high-density AI infrastructure within an open-source framework.

Original paperChinese poster

AI & modeling

30

Service-Aware Hosting Capacity Assessment of Edge Data Centers with Workload Flexibility

arXivPreprint
Research insight

The hosting capacity of an edge data center depends on which services can shift in time, a distinction peak demand alone may miss. Assessments should combine task deadlines, cooling overhead, and distribution network constraints.

Abstract & detailed commentary

Linhan Fang, Haoxiang Wan, Anurag Srivastava, Xingpeng Li

Source abstract

The growing demand for edge computing, content delivery, and AI services is driving the interconnection of edge data centers (DCs) with distribution networks. Before interconnection, utilities evaluate how much DC capacity can be accommodated without violating feeder current and voltage limits. Fixed peak load representations can overlook service dependent demand patterns, cooling related facility demand, and delay tolerant computing tasks. This paper develops a hosting capacity (HC) assessment model for edge DCs with shiftable workload scheduling. Three representative types are considered: mobile edge computing (MEC), content delivery network (CDN), and AI DCs. Facility demand is modeled by combining fixed base demand, service driven demand, prescribed cooling-overhead coefficient, and a shiftable workload component. Workload execution is optimized under arrival causality, maximum delay, daily energy balance constraints, and the resulting active and reactive loads are embedded in a distribution power flow model. Compared with the baseline without load shifting, the maximum bus level HC gain on the IEEE 33-bus system reaches 4.46% for MEC DCs and 9.89% for AI DCs, while CDN case shows negligible gain under the assumed cache management windows.

Original paperChinese poster

Computing & systems

31

Stackelberg Game with Multi-Agent Transformer for ISRS-Aware Resource Re-optimization in Multi-Band Optical Networks

arXivPreprint
Research insight

Changing one optical service can alter transmission conditions for others through nonlinear coupling. Resource re-optimization should jointly decide which services to adjust and how to reallocate their channels, with explicit checks on computational cost and the conditions under which benefits hold.

Abstract & detailed commentary

Jiaxin Liu, Rentao Gu, Miao Zhu, Zeguang Zou, Hui Li, Yuefeng Ji

Source abstract

The rapid expansion of generative AI is driving computing infrastructures toward interconnected AI data centers. Multi-band optical networks have become the backbone of such connectivity. To accommodate increasingly dynamic traffic demands, these networks require continual resource re-optimization to improve resource utilization and reduce service blocking. However, multi-band transmission amplifies inter-channel stimulated Raman scattering(ISRS), inducing nonlinear coupling among services. This coupling complicates re-optimization, as local adjustments perturb the global power profile, creating interdependent optimization decisions across services. Moreover, the nonlinear interactions vary with the subset of services selected for re-optimization, and inappropriate selection may reduce re-optimization effectiveness or diminish achievable benefits. To address these challenges, we propose a Stackelberg Game with Multi-Agent Transformer (SG-MAT) approach for ISRS-aware resource re-optimization. SG-MAT employs a leader-follower structure, in which the MAT-based follower models nonlinear coupling and generates coordinated channel reallocations, feeding the utilization improvements to the leader. Using this feedback, the leader identifies critical service subsets, approximating a Stackelberg equilibrium to guide global decisions and enabling consistent and efficient re-optimization. Simulation results show that SG-MAT achieves the highest utilization improvement and reduces the blocking ratio by approximately 30% under moderate traffic loads, with computational complexity comparable to benchmarks.