In focus/ Research highlights

29 papers5 research areas

Cooling & thermal management/ In focus

Thermally-driven quantum reservoir computing

This research explores thermally-driven quantum reservoir computing, where data is encoded through time-dependent thermal bath temperatures, shifting the memory-nonlinearity trade-off to the measurement channel. A key question is whether the non-universal impact of observable selection on computational power holds across different quantum systems.

arXivPreprint
Read the paper & insight

AI & modeling/ Related research

Assessing Data Center Hosting Capacity Considering Electromagnetic Transient Dynamics

This research examines the impact of electromagnetic transient dynamics on data center hosting capacity, emphasizing the need to incorporate dynamic response assessments into capacity evaluations. A key design dimension is comparing connection locations based on post-outage dynamic capacity boundaries to inform grid planning.

arXivPreprint

READING NOTEStart with the research insight, then examine the methods, comparisons and conditions.

RESEARCH & PERSPECTIVES

Papers & insights

Leave each paper with a question worth pursuing.

29 papers

Compute–power coordination

01

Can STATCOM and UPS-Based Voltage Support Mitigate Fault-Induced Reductions in AI Data Center Grid Power Draw?

arXivPreprint
Research insight

This research examines the coordination of active and reactive power control in AIDCs to enhance grid power intake during voltage sags, focusing on how varying fault depths influence the optimization of UPS-based voltage support strategies through simulations and case studies.

Abstract & detailed commentary

Ziang Liu, Yimeng Liu, Francis Yunhe Hou

Source abstract

Artificial intelligence data centers (AIDCs) are rapidly increasing in number and capacity. These large electronic loads are interfaced through power electronic devices and can sharply reduce grid power intake during fault-induced voltage sags. Disturbances exceeding equipment ride-through capabilities may also trigger protective disconnection, posing risks to power system security. Static synchronous compensators (STATCOMs) and appropriately controlled AIDC uninterruptible power supply (UPS) rectifiers can provide reactive power support during voltage sags. This paper compares the individual and combined effectiveness of STATCOM and UPS-based voltage support in mitigating fault-induced reductions in grid power intake through electromagnetic transient simulations of a 1 GW AIDC connected to an IEEE nine-bus system. Simulation results show that STATCOM support better preserves short-term intake in milder tested faults, whereas UPS coordination maintains rectifier operation under deeper sags by reducing active intake to reserve reactive current capacity. Combined support improves auxiliary load retention and recovery in selected cases. However, severe tested sags still cause substantial grid-demand reductions even with combined support.

Original paperChinese poster

Compute–power coordination

02

Speed-to-Power Dominates Energy Costs for AI Data Centers: Technoeconomic Analysis of Powering AI in the Continental United States

arXivPreprint
Research insight

This research examines the economic trade-offs between grid-connected and off-grid energy systems for AI data centers, emphasizing how deployment speed influences cost-effectiveness. A key question is how climate-specific factors and power conversion efficiencies affect the viability of DC-coupled solar-plus-storage solutions compared to AC-coupled or natural gas options across diverse U.S. regions.

Abstract & detailed commentary

Alex C. Newkirk, Daniel L. Gerber, Erica R. H. Fuchs, Alex Hubbard, M. Granger Morgan, Arman Shehabi, Sarah J. Smith, Constantine Samaras

Source abstract

The rapid growth of artificial intelligence is driving demand for new data centers at large scale and on short deployment timelines. To power them, firms connect to the commercial grid or contract generation directly, but interconnection and gas-turbine delays now incentivize on-site generation. We compare grid-connected and off-grid data center energy infrastructure (AC- and DC-coupled solar-plus-storage, islanded natural gas, and grid interconnection) across the continental U.S. Using an open-source technoeconomic framework built on empirically calibrated AI training loads, climate-driven cooling, stage-by-stage power conversion, and physics-based battery degradation, we model designs providing equivalent energy services. Our central contribution is a speed-adjusted cost of energy that values the compute unlocked by faster construction, making options with different deployment timelines directly comparable on one physically consistent basis. We find DC coupling reduces lifetime energy costs by 18% ($0.09/ kWh) on average versus AC counterparts by eliminating inverters and improving efficiency. Though rarely cheapest on unadjusted energy cost, DC-coupled microgrids' faster deployment makes them the lowest-cost modeled option in 85% of U.S. locations once foregone compute is valued, or 55% under accelerated natural gas timelines. For AI infrastructure, deployment speed rather than unit energy cost determines the economically preferred path to power.

Original paperChinese poster

AI & modeling

03

Assessing Data Center Hosting Capacity Considering Electromagnetic Transient Dynamics

arXivPreprint
Research insight

This research examines the impact of electromagnetic transient dynamics on data center hosting capacity, emphasizing the need to incorporate dynamic response assessments into capacity evaluations. A key design dimension is comparing connection locations based on post-outage dynamic capacity boundaries to inform grid planning.

Abstract & detailed commentary

Fan Jiang, Xingpeng Li

Source abstract

Hosting capacity is commonly assessed with steady-state optimization, which leaves the dynamic response of the data center and the grid at the resulting operating point untested. This paper assesses candidate data center capacities by coupling a unit commitment (UC) model with electromagnetic transient (EMT) simulation. During the capacity search, the UC model determines the economic dispatch for each tested data center capacity, and the resulting operating points are tested for settling with the generators committed online by the UC model and after a selected synchronous generator outage. Three nested capacities are obtained: the optimization-based steady-state capacity, the dynamic pre-outage capacity, and the post-outage dynamic capacity, each bounded by the previous one. On a test system with a detailed data center model, both dynamic capacities fall well below the optimization capacity, and the ranking of connection locations changes with the assessment stage and with the outage. In the most severe outage case at each candidate bus, the capacity is about 30% below the steady-state capacity. Thus, the dynamic response of the data center and the grid should be part of the hosting capacity assessment, and the comparison of connection locations should be made on the post-outage dynamic capacity.

Original paperChinese poster

AI & modeling

04

Scalable Reference Electrical Architectures for Modern Data Centers

arXivPreprint
Research insight

This research adopts a modular power architecture perspective to address scalable electrical design challenges in data centers, focusing on the dynamic response characteristics of different power configurations under extreme load variations.

Abstract & detailed commentary

Kiran Kumar Challa</name> <arxiv:affiliation>Joann</arxiv:affiliation> </author> <author> <name> Yan</name> <arxiv:affiliation>Joann</arxiv:affiliation> </author> <author> <name> Zhou, Kumarsinh Jhala

Source abstract

The rapid growth of cloud computing, artificial intelligence (AI), and high-performance computing is driving the deployment of data centers with electrical demands ranging from tens of megawatts to multi-gigawatt campuses, creating significant challenges for utility interconnection and power system planning. This paper presents scalable, vendor-neutral reference electrical architectures for colocation, hyperscale, and AI data centers. The proposed framework integrates modular Power PODs, hierarchical HV/MV/LV distribution, standby generation, uninterruptible power supplies (UPS), battery energy storage systems (BESS), and scalable utility interfaces into a unified planning methodology. Three representative Power POD configurations are developed to support systematic capacity expansion while maintaining consistent electrical topology and equipment sizing. The proposed architectures facilitate utility interconnection studies, equipment demand forecasting, transmission planning, and grid infrastructure assessment, providing an open and reproducible benchmark for evaluating the impacts of large-scale data center deployment on future power systems.

Original paperChinese poster

Compute–power coordination

05

Impact of Grid-Interactive Data Center Microgrids on Grid Reliability

arXivPreprint
Research insight

This research examines the role of coordinated resource management in grid-interactive data center microgrids, focusing on how intelligent control strategies adapt to varying load patterns and enhance grid reliability through localized generation and storage coordination.

Abstract & detailed commentary

Kiran Kumar Challa, Kumarsinh Jhala

Source abstract

Traditional data centers, operating as passive loads with standby backup resources, present significant challenges for grid integration due to their scale, rapid load fluctuations, and limited operational flexibility. This article investigates the transformative potential of grid-interactive data center microgrids, which integrate battery energy storage, on-site generation, and intelligent microgrid controllers to actively support both facility and grid operations. The proposed simulation framework enables the study comparing conventional and grid-interactive architectures under a range of steady-state and contingency scenarios. Results reveal that grid-interactive microgrids can substantially reduce peak grid demand, improve voltage stability, and improve system reliability especially when data center and system load peaks coincide. The findings highlight the critical role of coordinated resource management in enabling the reliable and efficient integration of large data center loads, and provide a practical methodology for assessing their system-level impacts.

Original paperChinese poster

Compute–power coordination

06

Decision-Focused Learning via Neural Optimization Layers for Battery-Assisted Grid-Import Smoothing in AI Data Centers

arXivPreprint
Research insight

This research explores decision-focused learning with neural optimization layers to address grid-import smoothing in AI data centers, emphasizing risk-aware battery energy storage system scheduling. A key question is how to adapt the model's responsiveness to grid-ramp risks across varying data center scales while maintaining efficient, solver-free scheduling operations.

Abstract & detailed commentary

Xinda Zheng, Canchen Jiang, Frits de Nijs, Edward Lam, Markus Wagner

Source abstract

Rapid AI data-center power fluctuations challenge grid integration. Sustained grid-import smoothing requires allocating limited battery power and energy under uncertain demand. We formulate risk-aware BESS scheduling that coordinates advance reserve commitments and demand-responsive dispatch, accounting for operating costs, grid-ramp penalties, and their conditional value-at-risk. We develop battery scheduling decision-focused learning (BS-DFL) with a constraint-aware neural optimization layer trained directly from this objective without optimal-solution labels. The trained layer is then frozen to guide demand-predictor learning through scheduling costs and ramping risk, enabling solver-free rolling-horizon scheduling. In a 10,000-minute simulation using loads derived from measured AI workloads, BS-DFL reduces mean absolute minute-to-minute grid-import changes by 71.70% and total scheduling cost by 18.01% relative to an MSE-trained predictor coupled with a mixed-integer linear programming solver, with an average decision time of 18.77 ms.

Original paperChinese poster

Compute–power coordination

07

Data Center Power Flexibility Characterization: A DeepSets Reinforcement Learning Approach

arXivPreprint
Research insight

This research investigates the role of coordinated endpoint adjustment in maximizing data center power flexibility intervals, leveraging a DeepSets reinforcement learning framework that represents workloads as unordered sets to maintain parameter efficiency. A key design dimension to explore is how role-conditioned cross-head decoders can balance opposing endpoint movements while adhering to carbon constraints, particularly in scenarios with dynamic resource configurations.

Abstract & detailed commentary

Qiong Liu, Changhong Zhao, Meng Yang, Xi Weng, Yue Chen

Source abstract

Data centers can provide power flexibility through the scheduling of computing workloads, cooling systems, and batteries. Characterizing this flexibility online is useful but challenging because of the complex coupling among these resources. To address this challenge, this paper proposes a role-conditioned cross-head DeepSets reinforcement learning approach to characterize the power flexibility interval of a data center at each time step. First, we formulate the flexibility characterization problem as a Markov decision process that jointly models the three resources under a carbon budget, with actions specifying the upper and lower endpoints of the power flexibility interval. We then design DeepSets actor and critic that represent delay-tolerant workloads as an unordered set, enabling the proposed approach to accommodate varying numbers of workloads with a fixed number of trainable parameters. Finally, because maximizing the width of the flexibility interval requires moving its endpoints in opposite directions, we develop a role-conditioned cross-head decoder that distinguishes their respective roles while keeping them coordinated. Case studies on the Google Cluster Data show that the proposed approach provides more than twice the daily flexibility of the standard soft actor-critic method with nearly zero carbon overshoot while using 87.7% fewer trainable parameters.

Original paperChinese poster

Compute–power coordination

08

Grid-Oriented Probabilistic Load Forecasting for AI Data Centers

arXivPreprint
Research insight

This research emphasizes the importance of modeling temporal dependencies in probabilistic load forecasts for AI data centers, suggesting that reconstructing time-series structures from historical forecast errors can improve reserve cost efficiency. A key question for further investigation is how historical error characteristics influence the effectiveness of temporal dependence reconstruction across varying data center scales.

Abstract & detailed commentary

Qingyi Yao, Ding Lin, Tianqiao Zhao, Meng Yue, Jianhui Wang

Source abstract

Probabilistic load forecasts for AI data centers need to represent both uncertainty under changing workloads and temporal dependence to support grid operations. This paper develops an open, grid-oriented benchmark using measured GPU power from a 448-GPU AI cluster. Forecasts are evaluated through four stages: probabilistic prediction, online uncertainty calibration, temporal scenario generation, and horizon-wide reserve sizing. Following a change in cluster utilization, a quantile LightGBM forecast achieves only 63.4% coverage for a nominal 90% interval, while online regime-conditioned calibration increases coverage to 87.3%. Even with well-calibrated marginal forecasts, independent sampling produces unrealistic ramp distributions and excessive reserve procurement. Reconstructing temporal dependence from historical forecast errors reduces the discrepancy in ramp statistics and lowers realized reserve cost by 7.4-10.6% across three forecasting tasks. These findings show that marginal forecast quality alone is insufficient for operational decisions and motivate joint evaluation of calibration, temporal structure, and decision outcomes.

Original paperChinese poster

AI & modeling

09

Real-Time Nonlinear Mixed-Integer Model Predictive Control With Horizon-Tail Relaxations

arXivPreprint
Research insight

This research investigates the integration of horizon-tail relaxations in nonlinear mixed-integer model predictive control to reduce computational complexity while maintaining control feasibility. A key question is how the trade-off between relaxed integer constraints in the prediction horizon and the stability of reconstructed discrete control actions affects real-time performance across varying system dynamics.

Abstract & detailed commentary

Armin Nurkanović

Source abstract

Model predictive control (MPC) of nonlinear systems with discrete decisions leads to mixed-integer nonlinear programs (MINLPs) whose combinatorial complexity often prevents real-time deployment. In this paper, we propose a decomposition-based MPC method that reorders and reduces computations to shorten the delay between receiving a state measurement and applying the control input. Before the measurement arrives, we solve a continuous relaxation of the MINLP at a predicted state and construct a mixed-integer quadratic program (MIQP). Once the measured state is available, we solve the MIQP that reconstructs the discrete controls and simultaneously performs one sequential quadratic programming step toward the corresponding nonlinear solution. To reduce the combinatorial complexity in the horizon length, we either fix the integer controls or relax their integrality over the prediction horizon tail, while retaining an integer-feasible first control input. We derive error bounds relating the nonlinear objective values obtained with the horizon-tail approximations to the optimal value of the original mixed-integer problem. In a data center cooling example, the proposed method reduces mean feedback computation time by 94% relative to a state-of-the-art MINLP method with a total closed-loop cost difference of less than 1%.

Original paperChinese poster

AI & modeling

10

EMT Modeling and Coordinated Mode-Transition Ride-Through Control of Modern Data Centers

arXivPreprint
Research insight

This research focuses on the electromagnetic transient (EMT) modeling of modern data centers to analyze their dynamic response during grid disturbances, with a specific emphasis on the coordinated control of power conversion and cooling systems. A key design dimension to examine is how varying cooling system configurations influence the facility's voltage ride-through capability under different fault scenarios.

Abstract & detailed commentary

Junyuan Zheng, Salish Maharjan, Min Lwin, Soummya Roy, Zhaoyu Wang, Wenlong Shi, Feng Qiu, Rajarshi Roychowdhury

Source abstract

Large data centers are emerging as power-electronic loads whose response to grid voltage disturbances can affect bulk-system stability. This paper presents the composition and control characteristics of a proprietary electromagnetic transient (EMT) model of a modern data center comprising an uninterruptible power supply (UPS) with battery energy storage, induction-motor cooling loads, a computer room air handler (CRAH) driven by a variable-frequency drive (VFD), and an aggregated server load. A voltage-based state machine coordinates three aspects of the facility response: the UPS operating mode (eco, double conversion, or battery), the supply path of the CRAH, and a ramped reconnection of the grid-side UPS converter after the disturbance clears. A 100 MW facility is implemented in PSCAD/EMTDC and benchmarked against the PSSE PERC1 aggregate data center model under a symmetrical three-phase fault and low- and high-voltage ride-through (LVRT/HVRT) events. The two models agree closely in their voltage and active-power trajectories, while the EMT model also resolves the converter and motor-reacceleration transients that the phasor-domain model cannot.

Original paperChinese poster

Compute–power coordination

11

Joint Electricity Price and Load Forecasting for Data Center Battery Dispatch Using Polynomial Diffusion Models

arXivPreprint
Research insight

This study adopts a computational modeling perspective to investigate the integration of polynomial diffusion models for joint electricity price and load forecasting in data center battery dispatch. A key design dimension to examine is how the conditional expectation properties of PDMs influence the dynamic programming framework's ability to adapt to varying market conditions and load patterns.

Abstract & detailed commentary

Matthew Van Ham, Yiping Liu, Xiaozhe Wang

Source abstract

The rapid growth of large-scale data centers (DCs) is increasing electricity demand, market volatility, and operating costs. Battery energy storage systems (BESSs) can mitigate these challenges by shifting electricity purchases from high-price to low-price periods. This paper proposes a real-time BESS dispatch framework using polynomial diffusion models (PDMs) to forecast both electricity prices and DC loads. Leveraging the closed-form conditional expectations of PDMs, the forecasts are integrated into a dynamic programming (DP) framework to minimize electricity procurement costs. Across the evaluated BESS configurations, the proposed approach achieves 2.63 times the cost savings of a rule-based (RB) strategy.

Original paperChinese poster

Compute–power coordination

12

Adaptive Grid-Mode-Aware Hybrid Energy Storage Control for AI Data Center Oscillation Mitigation

arXivPreprint
Research insight

This research investigates the dynamic adaptation of hybrid energy storage control in AI data centers by integrating real-time grid modal identification with mode-selective suppression, focusing on how shifting grid modes affect control efficacy and the potential for adaptive parameter tuning in response to varying oscillatory demands.

Abstract & detailed commentary

Quang Manh Hoang, Sina Mohammadi, Phi Long Nguyen, Wencong Su, Van-Hai Bui

Source abstract

Oscillatory power components in AI data-center demand can produce large frequency deviations when they coincide with vulnerable grid modes. Mode-aware hybrid energy storage systems (HESSs) can selectively suppress these components, but their effectiveness degrades when the grid mode changes while the control target remains fixed. This paper proposes a closed-loop grid-mode-adaptive HESS control framework that integrates measurement-based modal identification with mode-selective control. A sliding-window N4SID estimator identifies the local grid dynamics from grid-side power and frequency measurements, and the resulting natural-frequency estimate is used to retune the modal suppression branch assigned to the supercapacitor. The framework is evaluated under a grid-mode shift from 0.50 to 1.35Hz while maintaining equal physical damping and approximately equal load excitation at both frequencies. Compared with the fixed-target controller, the adaptive method reduces the post-change grid-side modal power component from 8.78 to 2.02MW, corresponding to a 76.94% reduction, and substantially lowers the resulting frequency deviation.

Original paperChinese poster

Compute–power coordination

13

Temporary gas turbines powering a US AI data center created a cross-state air pollution hotspot

arXivPreprint
Research insight

This research examines the cross-state air pollution impacts of temporary gas turbines used to power AI data centers, focusing on how regulatory frameworks and energy configurations influence pollutant dispersion and health risks across jurisdictions. A key design dimension to explore is the relationship between energy source selection and the spatial distribution of nitrogen dioxide emissions in unmonitored regions.

Abstract & detailed commentary

Will W. Qiang, Bo Huang, Xingjian Liu, Harry F. Lee

Source abstract

Data centers increasingly use on-site gas turbines that regulators can treat as temporary. Two satellites show the fleet powering SpaceXAI's Colossus 2 raised local nitrogen dioxide columns by about half as it expanded, the most anomalous increase among 656 urban locations nationwide since 2020. Mississippi authorized the fleet, but two-thirds of the hotspot's 116,000 mostly Black residents live in Tennessee, and the hotspot contains no regulatory nitrogen dioxide monitor. The fleet causes an estimated four premature deaths yearly, valued at $49 million, over 80% outside Mississippi and nearly all from units without selective catalytic reduction. On new turbines, this control's benefits exceed costs over the service life, but not over temporary stays or for in-state damages alone. Standards following the equipment could recover these benefits.

Original paperChinese poster

Cooling & thermal management

14

Thermally-driven quantum reservoir computing

arXivPreprint
Research insight

This research explores thermally-driven quantum reservoir computing, where data is encoded through time-dependent thermal bath temperatures, shifting the memory-nonlinearity trade-off to the measurement channel. A key question is whether the non-universal impact of observable selection on computational power holds across different quantum systems.

Abstract & detailed commentary

Thiago Werlang, Daniel Valente

Source abstract

Heat generation limits computation, classical and quantum, from single logic gates to entire data centers. However, an in principle limiting physical factor can sometimes be turned into a resource. In reservoir computing, energy dissipation is what gives a reservoir its fading memory. Here, we introduce a paradigm where the data injection itself is encoded on the time-dependent temperature of a thermal bath. We derive an exact expression for the nonlinear response of any fixed readout, and prove a rigorous memory-nonlinearity trade-off which turns out to be a structural necessity, rather than a tunable dynamical regime, since the same coupling that injects data also enforces equilibration. We illustrate both results with a driven qubit, using a single free parameter, and with a pair of coupled qubits, where the breaking of a discrete symmetry opens a fifteen-dimensional space to a single observable, yet that observable alone recovers just over half of it. This refutes the misconception that large Hilbert spaces guarantee computational power. Our results relocate the memory-nonlinearity trade-off from the reservoir's dynamics to its measurement channel, pointing to observable choice and bath engineering (instead of Hamiltonian control) as the physical levers for a thermally-native quantum reservoir computer.

Original paperChinese poster

Computing & systems

15

Halley: A Predictive Control Plane for Optical AI Data Center Networks

arXivPreprint
Research insight

Halley's predictive control plane addresses resource management in optical AI data center networks by dynamically allocating reserves and prioritizing risk mitigation through formal guarantees. A key research question is how predictive scheduling and failure anticipation can be adapted to varying network topologies and resource constraints while maintaining deterministic performance bounds.

Abstract & detailed commentary

Manav Mishra, Krishna M. Sivalingam

Source abstract

A frontier AI model is trained in an AI data center, on tens of thousands of accelerators joined by a dedicated network, and every training step ends with all of them exchanging data at once. Between racks, that network is optical, and each of its four layers, from lasers to switches, runs a fixed or after-the-fact policy. Lasers sharing an enclosure, cooling, and power can fail together. At a fixed spare ratio, correlated failure provably caps a pool's availability however large it grows. In this paper, we present a comprehensive predictive control plane framework, called Halley, that reads each resource's next state and acts before the failure occurs. It has four components, each carrying a formal guarantee: LightReserve that sizes the laser pool to provide a coverage bound, FoldFit that schedules the switch within $11/9$ of the optimal, ThermaLead that holds a microring with one-step-ahead control, and TriageGuard that protects the highest-risk modules first. Halley gives each layer a predictive controller that defers to the deployed policy when unsure. Composed from simulations at that point, effective goodput, the share of ideal throughput kept, rises from 65.2\% to 76.5\% if a window that exhausts its spares is lost. If only the dark channels' bandwidth is lost, it reaches 67.4\%. Per megawatt, that is up to 1.03--1.17 times the training; for the same training, up to 3.3--14.7\% less data center capacity. \textsf{Halley}'s fallback circuits are formally verified and are shown to achieve close timing on a commercial FPGA, and pass a 130~nm signoff.

Original paperChinese poster

AI & modeling

16

Market Efficiency and Capacity Investment under Flexible Price-Making Loads: A Computational Study

arXivPreprint
Research insight

This study examines the strategic use of temporal and spatial flexibility by price-making loads in relation to system capacity and renewable integration, highlighting how these flexibilities substitute for or complement thermal and transmission capacity. A key research question is how varying levels of renewable penetration influence the synergies between flexibility and transmission capacity in optimizing grid efficiency.

Abstract & detailed commentary

Aron Brenner, Deepjyoti Deka, Saurabh Amin

Source abstract

Large flexible loads such as data centers can shift consumption across locations and hours to lower their bills. We model a price-making consumer leading the system operator in a Stackelberg game and compare its shifts with a cost-minimizing planner's over a simulated RTS-GMLC year. Strategic temporal and spatial shifting capture 75% and 93% of the planner's savings, forgoing the rest mostly by withholding flexibility to protect favorable prices. Scarce capacity and abundant renewables raise this share for temporal shifting; scarce transmission lowers it for spatial shifting. Temporal and spatial flexibility substitute for thermal and transmission capacity, respectively, and complement renewables.

Original paperChinese poster

Compute–power coordination

17

Dynamic Modeling of Transmission Networks, Grid-Following Inverters, and UPS-Based AI Data Centers

arXivPreprint
Research insight

This research presents a dynamic modeling approach for transmission networks and UPS-based AI data centers, focusing on the integration of grid-following inverters and power-electronic loads within a synchronous dq frame. A key design dimension to examine is the impact of smooth surrogate models for non-smooth operations on the continuous differentiability of discretized system representations.

Abstract & detailed commentary

Muhammad Hamza Ali, Amritanshu Pandey

Source abstract

This document presents dynamic models of a transmission network and average models of power-electronic devices and loads in the synchronous $dq$ frame. We model the network in the positive sequence and its synchronous generators with the classical swing equation and a first-order turbine governor. The power-electronic models cover grid-following inverters and AI data centers. Each inverter has a phase-locked loop, a power controller, and a current controller. Each data center connects to the grid through two step-down transformers. Its low-voltage bus feeds an IT load, an induction-motor cooling load, and a constant-impedance load. A double-conversion uninterruptible power supply (UPS) serves the IT load. We model its rectifier, grid-forming output inverter, battery, and bidirectional DC-DC converter. A measured GPU power trace drives the IT demand. We replace every non-smooth operation with a smooth surrogate. This keeps the discretized model continuously differentiable for the nonlinear solver. We also show how we initialize each model at its power-flow operating point.

Original paperChinese poster

Compute–power coordination

18

Degradation Aware V2G Dispatch for Co-Optimization of Parking Facility and Edge Data Center Located in the Airport Campus

arXivPreprint
Research insight

Adding bidirectional chargers may reduce peaks further without increasing operator profit, because battery wear and payments to vehicle owners also affect the economics. V2G sizing should jointly assess peak-reduction value, owners' participation conditions, and the incremental cost of equipment.

Abstract & detailed commentary

Abdullah Al Mehadi, Hamed Haggi, Chinmay Morankar

Source abstract

This paper studies an airport campus where long stay EV parking, airport buildings, and an AI data center share a single grid connection. The campus pays a commercial electricity tariff that charges for both the energy used and the highest power drawn during peak hours. Parked EVs can send power back to the campus through vehicle to grid (V2G) chargers and lower this peak. This paper proposes a two stage method. In the first stage, a linear program schedules EV charging and discharging to maximize the operator's profit and also sets a fixed daily payment to EV owners. In the second stage, a search chooses the share of energy savings paid to owners. The model guarantees that every owner is paid enough to take part, pays for battery wear so that EVs discharge only when it is worth the wear, and assigns charging ports on a first come, first served basis. In the case study, 400 V2G chargers are added to 1200 existing Level 2 chargers, serving 5000 expected sessions under summer and winter rates. In a summer week, V2G raises operator profit by $4978 compared with smart charging and lowers the high peak demand by 4400 kW (9%). The best contract gives owners 70% of the energy savings and earns 21% more than a fixed payment alone. Doubling the V2G ports to 800 lowers the peak further but reduces profit, because owner payments grow faster than the savings. V2G pays back within 10 years if a bidirectional charger costs less than about $1800 more than a standard one. Compared with a 5 MW/10 MWh stationary battery, V2G cuts more peak demand at $409 of investment per kW instead of $1522 and needs no extra land, while the battery does not pay back within its lifetime.

Original paperChinese poster

AI & modeling

19

Multi-Timescale Deliverability of Shared Hybrid Storage for AI Data Center Campuses

arXivPreprint
Research insight

This research examines the multi-timescale coordination of shared hybrid energy storage systems to dynamically align commanded and delivered power in AI data center campuses, with a focus on validating the layered scheduling model's delay compensation effectiveness across varying campus scales.

Abstract & detailed commentary

Zihan Meng, Ruizhang Yang, Chenxi Hu, Francis Yunhe Hou

Source abstract

Artificial intelligence data center (AIDC) campuses contain sustained power variations and subsecond power fluctuations, requiring both sufficient stored energy and fast response. A shared hybrid energy storage system (HESS) can mitigate aggregate AIDC power deviations, but interval-based schedules cannot capture the delay between commanded and delivered power at the campus point of common coupling (PCC). To this end, this paper proposes a multi-timescale scheduling model for mitigating AIDC power fluctuations with the shared HESS. First, it models electrical pooling at the campus bus and constrains the shared HESS to a single PCC injection. Second, a two-layer model passes five-minute scheduled power, energy state, and reserve capacity to a causal fast response model that distinguishes commanded power from delivered power. Case studies using the National Laboratory of the Rockies (NLR) GenAI Power Profiles Dataset show reductions in both PCC and fast integral absolute error (IAE), while retaining most of the improvement available under ideal response.

Original paperChinese poster

Compute–power coordination

20

Grid-Mode-Aware AI Data Center Power Smoothing via Bayesian-Optimized Hybrid Energy Storage System

arXivPreprint
Research insight

This research investigates the role of hybrid energy storage systems in grid-mode-aware control, focusing on how parameterized frequency-decoupling policies can mitigate oscillatory load components. A key design dimension to examine is the impact of varying energy storage configurations on the suppression of critical oscillatory patterns within dynamic power demands.

Abstract & detailed commentary

Sina Mohammadi, Quang Manh Hoang, Marcus Chen I Wada, Van-Hai Bui, Wencong Su

Source abstract

AI data centers exhibit highly stochastic, volatile power demands from intensive workloads and synchronized GPU training cycles, which can excite grid natural frequencies and threaten system stability. This paper proposes a real-time, forecasting-independent control framework utilizing a Hybrid Energy Storage System (HESS) that coordinates a Battery Energy Storage System (BESS) and a supercapacitor (SC). Employing a parameterized frequency-decoupling and active modal-damping policy, the framework mitigates critical oscillatory load components while smoothing overall power fluctuations. To bypass the heavy computational burden of online receding-horizon optimization, this work introduces an offline Bayesian Optimization (BO) approach to optimally tune real-time control parameters, minimizing a multi-objective cost function that balances grid compliance penalties and storage degradation. Numerical simulations demonstrate that the proposed method ensures grid stability and strong target envelope adherence. Specifically, it reshapes extreme 75-160 MW raw demand fluctuations to largely fit within a tight 10 MW target band, with only brief transient excursions, while attenuating the critical 20 MW oscillatory component below 1 MW to suppress resonant excitation.

Original paperChinese poster

Computing & systems

21

Democratizing LLM Training with the Edge: Challenges, Systems, and the Road Ahead

arXivPreprint
Research insight

Distributed LLM training depends on communication, compression, and fault tolerance that can accommodate heterogeneous clients and unreliable links. Stable convergence across university sites motivates further testing with larger models and different privacy requirements.

Abstract & detailed commentary

Ziyue Luo, Jiaxuan Cai, Cedric LeDenmat, Srijith Nair, Fatemeh Nourzad, Rohith Krishnan, Qinhang Wu, Jifan Zhang, Sungjae Lee, Zhe Li, Peiwen Qiu, Siddharth Shah, Rishabh Sharma, Sundararajan Srinivasan, Yinglun Xia, Xue Zheng, Zidong Liu, Bicheng Ying, Kaushik Chowdhury, Gauri Joshi, Yingbin Liang, Robert Nowak, Srinivasan Parthasarathy, Saurav Prakash, Balaraman Ravindran, Sanjay Shakkottai, Ness B. Shroff, Haibo Yang, Aylin Yener, Jia Liu

Source abstract

The growing computational power of modern GPU data centers has let a few industrial giants train and deploy large language models (LLMs) on massive amounts of data. Yet the sheer scale of these models and their training data makes centralized development increasingly hard to sustain, and at the same time shuts out smaller institutions that hold relevant private data but lack comparable infrastructure. In this paper, we organize our positions on distributed LLM training around the pretraining and fine-tuning paradigms, covering federated learning, split learning, and decentralized approaches, and we assess their readiness for geo-distributed settings with heterogeneous hardware and unreliable connectivity. We then present a {\em unified} system architecture built around a cloud-hosted parameter server that coordinates heterogeneous clients over outbound gRPC connections, reusing one communication, compression, and fault-tolerance stack for both pretraining and a family of fine-tuning methods. We validate the design with real geo-distributed experiments on GPT-2 Medium and Llama3-1B pretraining across multiple university sites, showing stable convergence under realistic conditions. Finally, we chart the road ahead, identifying open problems that span frontier model support, elastic fault tolerance, adaptive compression, federated alignment, privacy and trust, incentive design, and system--algorithm co-design, all of which must be addressed to make democratized LLM training a reality.

Original paperChinese poster

Resources & environment

22

Generalized green and red concepts for artificial intelligence, big data, and information and communication technologies: Multidimensional framework and countermeasures

arXivPreprint
Research insight

AI sustainability impacts extend through electricity, water, materials, and the use of services; improving one efficiency metric does not establish a lifecycle benefit. A common system boundary is needed before comparing the resource costs of different technology choices.

Abstract & detailed commentary

Jinsong Wu, Yixin Xiao, Haowei Bi, Huamin Fang

Source abstract

The rapid expansions of artificial intelligence (AI), big data (BD), and information and communication technologies (ICT) are driving substantial growth in electricity, water, and material demands, with data centers projected to consume 6.7--12\% of U.S. electricity by 2028 (up from 4.4\% in 2023) and AI-related water demand estimated at 4--6 billion m$^3$ annually by 2027. Existing ``green AI'' and ``red AI'' discussions have largely emphasized computational efficiency and carbon emissions, providing limited guidance for lifecycle trade-offs, service-versus-use impacts, and broader sustainability externalities beyond energy. To bridge this gap, this paper proposes generalized green AI (GGAI) and generalized red AI (GRAI) and extends the taxonomy to red BD (RBD) and red ICT (RICT) as well as red electronic and electrical engineering (REEE) \& red digital technologies (RDT) under a unified Environmental-Economic-Social-Technical/Operational (E/Ec/S/T) framework. Based on representative footprint indicators in the large-model era (electricity, carbon, water, and e-waste), we analyze how risks propagate across AI-BD-ICT stacks and across service-use boundaries. We further organize actionable countermeasures into a four-tier taxonomy aligned with the Environmental-Economic-Social-Technical/Operational framework: metric-level reform for accountability, revision of information and communication technologies design principles and demand shaping, efficiency-oriented LLM development practices (data, model, training, and scaling), and energy-infrastructure transition. The proposed framework operationalizes the Environmental-Economic-Social-Technical/Operational-aligned assessment and intervention prioritization across the AI-BD-ICT stacks, enabling sustainability-by-design without sacrificing utility.

Original paperChinese poster

Cooling & thermal management

23

Modeling Liquid-Cooled Data Centers in EnergyPlus

arXivPreprint
Research insight

Coupling facility water loops and chip junction temperatures in one solver helps trace where liquid cooling saves energy. The benefits of a warm-water design should be tested across climate, workload, and the boundary used to account for on-site water use.

Abstract & detailed commentary

Yun-Dam Ko, Dipashreya A. Sur, Cade Napier, Carlos D. Díaz-Marín, Rishee K. Jain

Source abstract

As AI workloads accelerate data center transition toward high-density racks with direct-to-chip (DTC) liquid cooling, existing simulation tools remain limited in evaluating whole-building and multi-year efficiency. To bridge this gap, we develop a native EnergyPlus object, ElectricEquipment:ITE:LiquidCooled, that models DTC liquid cooling for chilled-water and warm-water architectures as plant-loop components. It couples facility-water loops, rack-side secondary loops, coolant distribution units, and chip-junction temperatures within a single solver. Validation against an independent Modelica implementation across 21 operating conditions, including two full-year runs compared at one-minute resolution, yields loop-temperature RMSE at or below 0.021 K, well within the 0.1 K acceptance threshold. Our case study demonstrates that warm-water liquid cooling reduces annual PUE from 1.43 to 1.25, eliminates on-site water use, and cuts total facility energy by 37.9% relative to an air-cooled baseline. By embedding liquid-cooling logic into EnergyPlus, our work provides whole-building, long-term energy modeling for high-density AI infrastructure within an open-source framework.

Original paperChinese poster

AI & modeling

24

Watts If? A Benchmark for Counterfactual Reasoning About the AI Data Center Buildout

arXivPreprint
Research insight

Answering a siting question does not show that a model can enumerate every action still available at a decision point. Evaluations of LLM-assisted infrastructure planning should check action completeness, irreversible commitments, and counterfactual paths.

Abstract & detailed commentary

Pankaj Chouhan, Rajarshi Das, Aditya Dubey, Manminder Tomar, Sreekar Reddy, Samta Sharma, Satyapragnya Kar, PR Panigrahi

Source abstract

An AI data center is committed years before it draws a watt: a few discrete choices (grid or on-site gas, evaporative or dry cooling, which county to file in) fix its capital, water draw, and carbon path, and LLMs are now asked to help screen them with no test of whether they track what each commitment rules out. We introduce DCBench-440, with two arms reported separately: 200 generative questions over STRIPS worlds for five US deal archetypes, with search-verified gold answers and no tested shortcut above 12% on any question type, and 240 multiple-choice questions grounded in quoted site records, emission equations, and stated scenarios. Across open-weight deployments, accuracy spans 12.5-71.5% (generative) and 58.3-92.5% (multiple choice). One skill fails everywhere: asked to list every action available at a decision gate, no model exceeds 4.0% exact match. The strongest list 72-85% of the actions that would change the project's state but omit most permitted actions that change nothing; with those excused, the best exact match is still 24%. Code, data, and other materials are available upon request.

Original paperChinese poster

Computing & systems

25

FALCON: FPGA-Accelerated Latency-Certifiable Occupancy Networks for Camera-Based Autonomous Driving

arXivPreprint
Research insight

Safety-critical computing needs an explicit account of worst-case delivery time and the output returned when a deadline is missed. Cycle bounds, measured latency envelopes, and full-pipeline performance should be reported separately so that guarantees from proxy tests remain within their tested scope.

Abstract & detailed commentary

Haohua Que, Mingkai Liu, Handong Yao

Source abstract

A perception system that must brake for a pedestrian does not need a low average latency. It must deliver an answer before the deadline on every frame, the worst case included. Commodity edge accelerators optimize the mean through dynamic scheduling, OS jitter, thermal throttling, and contention, so their per-frame latency can be measured but not bounded. We build FALCON, a camera-based 3D occupancy front-end on the AMD Kria KR260, an embedded FPGA drawing 4.3 W idle and up to 6.6 W under inference, and make the latency guarantee layered and explicit: programmable-logic (PL) compute is cycle-bounded analytically; inference is a measured envelope over 100k-frame traces; and a watchdog enforces output delivery, publishing the previous output flagged stale when a frame is late. The deadline runs use a fixed-work proxy of six ResNet-50 DPU inferences per frame, not the full occupancy network: across three 100k-frame enforced runs, all 300k proxy frames delivered an output within the 100 ms deadline plus at most 10.2 ms, the worst of the three runs. The full six-camera FlashOcc pipeline composes to about 1.3 s per frame on the board and is not yet a 10 Hz system. The two operations the DPU cannot run, a view-transform gather and a bilinear resize, become fixed-trip-count PL IPs numerically matched to their software references. On the full Occ3D-nuScenes validation set the board reaches mIoU 29.88, 92.8% of an FP32 baseline the DPU cannot run. On a ResNet-50 probe over 100k frames the KR260 tail stays within 1.5 times its median (2.0 times for the six-inference proxy), where Jetson Orin reaches 4.4 times and the worst datacenter GPU run (NVIDIA L4) 23.6 times. The deployment recipe, HLS sources, and raw timing traces are released.

Original paperChinese poster

Resources & environment

26

Water as a Battery: Using Hydropower Flexibility to Support the Grid

arXivPreprint
Research insight

Hydropower dispatchability can change the preferred mix of wind, solar, and batteries, but the outcome depends on local resources and land availability. Data center energy planning should compare hourly supply availability and storage needs alongside those site conditions.

Abstract & detailed commentary

Chinmay Morankar, Abdullah Al Mehadi

Source abstract

This study presents a two-layer optimization framework to determine the optimal sizing of PV, wind, and battery storage co-located with existing hydroelectric plants to support rapidly increasing data center loads while minimizing cost, grid reliance, and transmission upgrades. The outer layer uses Particle Swarm Optimization (PSO) to select capacity combinations, while the inner layer performs rolling-horizon dispatch simulations to model hourly energy balance among PV, wind, hydro, and BESS, considering operational constraints. Two case studies were analyzed. At The Dalles Dam (Oregon), favorable wind resources and land availability enabled deployment of 111.2 MW PV and 117.9 MW wind, with no BESS required. Hydro flexibility allowed the system to meet the load with minimal grid support. In contrast, Conowingo Dam (Maryland) faced land constraints and limited renewables to 130 MW PV, leading to higher grid dependence. Co-locating hydro with renewables significantly enhances reliability and cost effectiveness by leveraging hydro's dispatchability to balance daily and seasonal variable generation from PV + Wind, reducing the need for storage or costly grid imports. This analysis provides a framework to meet the 99.9% availability targets of this new load type on the grid with sustainable energy resources.

Original paperChinese poster

AI & modeling

27

Converter-Aware Coordination of Computing Flexibility in Behind-the-Meter Data Centers

arXivPreprint
Research insight

A task's ability to shift in time does not guarantee that its resulting power trajectory is electrically feasible. Workload schedules need joint checks against converter, voltage, and network limits before their flexibility can be assigned operational value.

Abstract & detailed commentary

Ruolan Cui, Ruizhang Yang, Chenxi Hu, Franxis Yunhe Hou

Source abstract

Data centers are emerging as large electricity consumers whose demand can be reshaped through workload scheduling. However, computing flexibility in behind-the-meter facilities does not automatically translate into electrically realizable power flexibility. Ignoring converter and network operating limits may cause converter overloads, protection trips, and interruptions to power supply and computing services. This paper proposes a converter-aware intraday scheduling methodology. First, a task-level mixed-integer linear formulation preserves synchronous training configurations and completion requirements, while Minkowski-sum aggregation and Shapley--Folkman convexification yield a linear inference-pool representation without unit-level binary variables. The latter admits a conditional relative relaxation-gap bound that decreases inversely with pool size. Second, a four-node electrical model links computing demand, on-site injections, and grid exchange to converter and network limits through lifted voltage variables and second-order cone relaxation. Finally, a mixed-integer model coordinates workloads, photovoltaic generation, energy storage, and grid purchases. Case studies show that electrical limits reshape scheduling and renewable utilization, while on-site resources reduce grid dependence. Under the studied conditions, fixed training cannot support full inference service within voltage limits, whereas coordinated scheduling achieves negligible inference shortage and passes verification against the original alternating-current model. These findings demonstrate the role of computing--electrical coordination in realizing the operational value of workload flexibility.

Original paperChinese poster

Compute–power coordination

28

Comparative Analysis of Large Load Interconnection Requirements Across U.S. Transmission Entities

arXivPreprint
Research insight

Data centers' potential to support grid operation needs to be expressed through explicit, comparable interconnection requirements. Checking load models, fault ride-through, and dispatchability item by item can help turn a connection request into a demonstration of operating capability.

Abstract & detailed commentary

Rafi Zahedi, Rahul Anilkumar, Amin Zamani

Source abstract

The rapid growth of large loads, especially data centers driven by artificial intelligence, is creating unprecedented demands on the North American electric grid. Data centers now account for nearly 80% of large load interconnection requests in the Western Interconnection, and U.S. electricity consumption from data centers is projected to reach 325-580 TWh by 2028. Despite this urgency, technical interconnection requirements for large loads have not yet matured and still contain several gaps. This paper presents a comparative analysis of large load interconnection requirements across eleven U.S. entities, including AEP, Ameren, CAISO, Dominion, Duke Energy, ERCOT, LIPA, MISO, PJM, Southern Company, and SPP, under seven technical categories: large load definition, load data and modeling, fault ride-through, load curtailment and shedding, dispatchability, power quality, and reactive power control. The analysis reveals significant variation in both the scope and specificity of requirements. LIPA addresses all seven technical categories at least partially, while Dominion and Duke Energy provide detailed coverage across nearly all categories. The analysis also finds that data center applicants can be viewed as potential grid resources, rather than only as consumers. The findings provide a structured baseline from which utilities, regulators, ISOs/RTOs, and developers can identify gaps, benchmark against peers, and accelerate the development of interconnection standards.

Original paperChinese poster

AI & modeling

29

Locked In: Multi-Objective RL for the AI Data Center Build-Out

arXivPreprint
Research insight

Siting, power procurement, and cooling commitments can lock in capital and resource use for years, so an initial site score cannot represent lifetime performance. Planning models should preserve irreversibility, retrofit timing, and the consequences of forecast error.

Abstract & detailed commentary

Satyapragnya Kar, Rajarshi Das, PR Panigrahi

Source abstract

AI data center build-out is a multi-trillion-dollar, multi-decade infrastructure program. Yet siting, power procurement, and cooling decisions are still made with static, single-point scoring tools. These tools are evaluated once, on day-zero numbers. This is a poor fit. A site's water, power, and carbon profile drifts substantially over the 10 to 20 year asset life. The governing decisions are also irreversible, and they bind capital and physical plant for years. We formalize long-horizon build-out as a tiered multi-objective Markov decision process. Strategic commitments are gated to discrete windows, incur switching costs, and energize only after source-dependent lead times. Operational dispatch is restricted to capacity that physically exists. We solve the problem with a preference-conditioned multi-objective agent that has a semi-Markov manager and worker hierarchy. The agent recovers a family of policies that a planner can steer across cost, carbon, water, and reliability at inference time. We validate long-horizon dynamics with a lightweight counterfactual rollout model. Across three commitment regimes (irreversible, reversible, and commit-once) on real site data, preference conditioning yields a confirmed, steerable trade-off on both objective pairs in every regime. Imposing lock-in produces a more evenly covered frontier and a far more consistent rate of anticipatory retrofit ahead of a binding water-stress constraint than a freely reversible formulation. Finally, a compact counterfactual dynamics model tracks slow-moving state well. It is measurably outperformed by simple persistence on the water-stress axis. We report this limitation rather than obscure it. We release the environment, agents, baselines, and evaluation harness. All of them are grounded in real interconnection-queue, water-stress, and grid-emissions data.

Original paperChinese poster