Liquid Cooling and AI Data Center Daily | 2026-07-06

A daily English mirror of liquid cooling, AI data center efficiency, research papers, products, policy, financing, and supply-chain signals.

AI data center liquid cooling daily visual
Daily tracking of AI data centers, liquid cooling, power constraints, and infrastructure supply chains.
Collection window2026-07-05 08:00 北京时间 - 2026-07-06 08:00 北京时间
Industry heat score10/10
Updated2026-07-06 15:03 Beijing time

1. Executive brief

This English edition mirrors the same public-source dataset used by the Chinese daily report for 2026-07-06.

  • Collection window: 2026-07-05 08:00 北京时间 - 2026-07-06 08:00 北京时间.
  • Coverage snapshot: 8 industry items; 7 technology items; 8 paper or white-paper items; 8 video signals.
  • Current hot topics: 电力并网与能源约束, 智算中心 CapEx/扩建, AI 芯片供给与交付, NVIDIA Blackwell/GB200/GB300.
  • The heat score is 10/10 and should be read as a source-density signal, not as an investment indicator.

All claims should be verified against the original source links listed at the end of this report.

Academic and Industry Briefs

Papers, videos, industry updates, policy, financing, and projects are compressed into scannable tags with a title, summary, and source link.

Academic

Academic

Research papers, methods, research-oriented videos, and academic signals.

Paper 1 S

Learning Burst-Aware Early Warning Models for Capacity Stress under AI Wo…

The rapid growth of large-scale AI workloads, particularly Large Language Model (LLM) training and inference, is fundamentally resh…

Expand
Paper theme visual
AI 运维优化
Paper 1S

Learning Burst-Aware Early Warning Models for Capacity Stress under AI Workload Surges in Hyperscale Data Centers

Published
2026-06-19
Authors
Zihan Yu, Xianling Zeng, Zhiming Xue, Yalun Qi, Sichen Zhao
Theme
AI 运维优化
Abstract

The rapid growth of large-scale AI workloads, particularly Large Language Model (LLM) training and inference, is fundamentally reshaping the operational dynamics of hyperscale data centers. Unlike traditional cloud workloads, AI-driven jobs exhibit bursty, high-intensity, and rapidly shifting resource demands, often leading to sudden capacity stress that cannot be effectively handled by reactive threshold-based mechanisms. In this paper, we propose a deployment-oriented, burst-aware early warning framework for proactive capacity stress prediction under AI workload surges. We formulate the problem as a high-recall forecasting task over multivariate telemetry windows, with the explicit goal of enabling operational intervention before system degradation occurs. The proposed framework integrates workload intensity, temporal variation, and system pressure signals, and employs a lightweight tree-based learning model to capture nonlinear interactions in highly imbalanced environments. To evaluate the system under realistic conditions, we introduce an AI workload surge injection methodology that simulates burst-driven demand patterns observed in large-scale AI systems. Our XGBoost-based model achieves an ROC AUC of 0.697 and an AP of 0.670, significantly outperforming baseline methods. Under deployment-oriented threshold selection, the framework achieves a Recall of 0.914, enabling the detection of the majority of stress-prone periods with acceptable false-alarm cost. Beyond predictive performance, we show how the proposed framework can be integrated into operational control loops to support proactive actions such as workload throttling and resource scaling. Our results highlight the practical value of high-recall, learning-based early warning systems in enabling resilient and adaptive data center operations in the era of AI-driven workloads.

Chinese interpretation

背景:AI 数据中心负载、功率密度和能源约束同步上升,AI 运维、负载预测和设施调优正在成为智算中心设计的关键变量。问题:论文聚焦现有方案在效率、可靠性或工程协同上的瓶颈。方法:摘要显示作者采用框架构建和频域/系统级分析,把运行负载、冷却/能源系统和基础设施约束放在同一分析框架中。结果:研究重点指向跨地域数据中心负载与电力资源之间的调度关系。意义:对日报读者而言,它可用于判断AI 工具是否能降低运维复杂度并提升可用性。仍需结合全文实验条件、样本范围和成本假设核验。

Reference

Zihan Yu, Xianling Zeng, Zhiming Xue, 等. Learning Burst-Aware Early Warning Models for Capacity Stress under AI Workload Surges in Hyperscale Data Centers[J/OL]. (2026-06-19)[2026-07-06]. http://arxiv.org/abs/2606.21130v1.

arXiv
Paper 2 S

Revisiting "Cooler is Better": ITD-Aware Per-CPU Thermal Optimization for…

As data center energy demand approaches grid-level constraints, optimizing conventional server infrastructure is essential for sust…

Expand
Paper theme visual
算电协同
Paper 2S

Revisiting "Cooler is Better": ITD-Aware Per-CPU Thermal Optimization for Sustainable Data Center Operation

Published
2026-06-10
Authors
Jason Crop, Hayden Moore, Sudeep Pasricha
Theme
算电协同
Abstract

As data center energy demand approaches grid-level constraints, optimizing conventional server infrastructure is essential for sustainable growth. The long-standing assumption that "cooler is better", i.e., lower CPU temperatures reduce power, does not fully hold for modern low-voltage CPUs, where inverse temperature dependence (ITD) drives higher supply voltages at lower temperatures. This creates a non-monotonic performance-per-watt curve where efficiency peaks at an intermediate thermal point. In this paper, for the first time, we empirically characterize ITD on production Intel Xeon CPUs and demonstrate that efficiency-optimal temperatures are CPU part-specific, and frequently higher than typical data center operating conditions. Measurements from commercial cloud data center platforms (Amazon, Equinix) reveal that approximately half of modern high-power CPUs operate about 10°C below their efficiency-optimal thermal point. By implementing ITD-aware thermal grouping of CPUs and inlet temperature adjustments, data center operators can optimize facility-level cooling and overall sustainability. Our case study shows that this approach can reduce total data center energy by 4-13% without sacrificing performance or reliability.

Chinese interpretation

背景:AI 数据中心负载、功率密度和能源约束同步上升,算力负载与电网侧资源的协同调度正在成为智算中心设计的关键变量。问题:论文聚焦现有方案在效率、可靠性或工程协同上的瓶颈。方法:摘要显示作者采用建模优化、调度分析或算法评估,把运行负载、冷却/能源系统和基础设施约束放在同一分析框架中。结果:研究重点指向AI 负载波动对电网设备寿命和调频边界的影响。意义:对日报读者而言,它可用于判断智算中心建设是否受电网容量、负载波动和调度机制约束。仍需结合全文实验条件、样本范围和成本假设核验。

Reference

Jason Crop, Hayden Moore, Sudeep Pasricha. Revisiting "Cooler is Better": ITD-Aware Per-CPU Thermal Optimization for Sustainable Data Center Operation[J/OL]. (2026-06-10)[2026-07-06]. http://arxiv.org/abs/2606.11163v1.

arXiv
Paper 3 S

WattGPU: Predicting Inference Power and Latency on Unseen GPUs and LLMs

Large Language Model (LLM) inference workloads are a rapidly growing contributor to data center energy consumption. Optimizing thes…

Expand
Paper theme visual
芯片与算力
Paper 3S

WattGPU: Predicting Inference Power and Latency on Unseen GPUs and LLMs

Published
2026-07-03
Authors
Mauricio Fadel Argerich, Jonathan Fürst, Marta Patiño-Martínez
Theme
芯片与算力
Abstract

Large Language Model (LLM) inference workloads are a rapidly growing contributor to data center energy consumption. Optimizing these deployments requires matching specific LLMs to the most efficient GPUs, but operators currently lack the tools to do so without exhaustively profiling each combination. While some predictive models exist, they still require profiling data and struggle to generalize to hardware unseen during training. To address this, we introduce \textit{WattGPU}, featuring two predictive models for mean GPU power draw and Inter-Token Latency (ITL). Our approach leverages only publicly available LLM metadata and GPU specifications, eliminating the need for hardware access or profiling while enabling generalization to unseen NVIDIA server-grade GPUs and LLMs. We evaluate our models using rigorous leave-one-GPU-out and leave-one-LLM-out cross-validation on a dataset of 42 open-source LLMs (0.1B--27B parameters) and 8 GPUs under both offline and server scenarios. The mean power draw model achieves a median absolute percentage error of $\leq3.4\%$ for offline and $\leq13.5\%$ for server scenarios on unseen GPUs, while the latency model achieves $\leq8.5\%$ in server mode, both maintaining strong GPU ranking correlations for server scenarios (Kendall $τ\geq0.76$). Compared to standard physically grounded baselines -- Load-Scaled Thermal Design Power (TDP) for power draw and roofline for latency -- our models reduce median absolute percentage error by approximately 4$\times$ on unseen LLM-GPU combinations for server scenarios or approximately 2$\times$ for completely unseen GPUs. WattGPU's data and code are publicly available at https://github.com/maufadel/wattgpu.

Chinese interpretation

背景:AI 数据中心负载、功率密度和能源约束同步上升,芯片、服务器和高密度算力部署正在成为智算中心设计的关键变量。问题:论文聚焦现有方案在效率、可靠性或工程协同上的瓶颈。方法:摘要显示作者采用框架构建和频域/系统级分析,把运行负载、冷却/能源系统和基础设施约束放在同一分析框架中。结果:研究重点指向跨地域数据中心负载与电力资源之间的调度关系。意义:对日报读者而言,它可用于判断芯片路线和服务器密度变化如何传导到机房设计。仍需结合全文实验条件、样本范围和成本假设核验。

Reference

Mauricio Fadel Argerich, Jonathan Fürst, Marta Patiño-Martínez. WattGPU: Predicting Inference Power and Latency on Unseen GPUs and LLMs[J/OL]. (2026-07-03)[2026-07-06]. http://arxiv.org/abs/2607.02391v1.

arXiv Open Chinese poster
Paper 4 S

Financing Artificial Intelligence Infrastructure: Mapping AI Infrastructu…

Artificial intelligence depends on large-scale compute resources and their supporting infrastructure. However, AI governance debate…

Expand
Paper theme visual
热管理与液冷
Paper 4S

Financing Artificial Intelligence Infrastructure: Mapping AI Infrastructure Investment and Compute Governance Across Africa

Published
2026-06-24
Authors
Kai-Hsin Hung, Sumaya Nur Adan, Krupa Suchak, Armita Sadeghian Barzoki, Kofi Yeboah, Mohammad Amir Anwar
Theme
热管理与液冷
Abstract

Artificial intelligence depends on large-scale compute resources and their supporting infrastructure. However, AI governance debates treat compute primarily as a technical input rather than as an outcome of investment, ownership, and financial control. This paper examines AI infrastructure investment flows across Africa through a systematic analysis of 46 publicly announced projects totalling USD $12.7 billion between 2019 and 2025. Using a value chain framework, we analyze who invests in AI-relevant infrastructure and where investments concentrate. Our findings reveal a highly concentrated landscape dominated by global data center operators, hyperscale technology firms, and development finance institutions, clustering in South Africa, Kenya, Nigeria, and Egypt. We introduce asymmetrical interdependence to describe a structural condition in which capital and physical infrastructure account for 73% of total funding while control remains concentrated in the compute layer among a small number of global technology firms. We argue that compute governance must account for capital flows, ownership, and control, not only geographic access, because these dynamics shape AI compute equity. Infrastructure presence is necessary but insufficient for meaningful governance capacity.

Chinese interpretation

背景:AI 数据中心负载、功率密度和能源约束同步上升,液冷、热管理和数据中心能效正在成为智算中心设计的关键变量。问题:论文聚焦现有方案在效率、可靠性或工程协同上的瓶颈。方法:摘要显示作者采用综述归纳和指标比较,把运行负载、冷却/能源系统和基础设施约束放在同一分析框架中。结果:研究重点指向能效评价口径、运营指标和优化目标的系统化梳理。意义:对日报读者而言,它可用于判断液冷方案、热管理路线和高密度部署节奏。仍需结合全文实验条件、样本范围和成本假设核验。

Reference

Kai-Hsin Hung, Sumaya Nur Adan, Krupa Suchak, 等. Financing Artificial Intelligence Infrastructure: Mapping AI Infrastructure Investment and Compute Governance Across Africa[J/OL]. (2026-06-24)[2026-07-06]. http://arxiv.org/abs/2606.28404v1.

arXiv Open Chinese poster
Paper 5 S

Hot AI in Cold Space: Thermal-Crosstalk-Aware Scheduling for Sustainable …

Terrestrial AI training faces an unsustainable energy and water crisis, positioning Orbital Data Centers (ODCs) as a "zero operatio…

Expand
Paper theme visual
AI 运维优化
Paper 5S

Hot AI in Cold Space: Thermal-Crosstalk-Aware Scheduling for Sustainable Orbital AI Clusters

Published
2026-06-23
Authors
Shuyi Chen, Zhengchang Hua, Nikos Tziritas, Georgios Theodoropoulos
Theme
AI 运维优化
Abstract

Terrestrial AI training faces an unsustainable energy and water crisis, positioning Orbital Data Centers (ODCs) as a "zero operational carbon" alternative. However, the sub-$10μ\text{s}$ communication latency required for synchronized scientific workloads, such as distributed Large Language Model (LLM) training, forces ODCs into extreme physical density, triggering a critical "Proximity-Thermal Paradox." As these high-density systems scale into Monolithic Structures or Proximity Swarms, they suffer from intense thermal-fluid crosstalk (heat traps in shared cooling loops) and thermal-radiative crosstalk (mutual heating that blocks deep-space cooling radiators). If left unmitigated, this persistent heat stagnation not only triggers severe thermal throttling that degrades training throughput, but also induces severe thermal fatigue, drastically shortening hardware lifespans and generating premature space e-waste. To make orbital AI truly sustainable, this position paper challenges traditional uniform load-sharing. We propose the Thermal-Aware Heterogeneity Thesis, which treats spatial cooling variances as a primary resource management dimension. Building on this, we introduce Thermal-Load Balancing (TLB), a software framework that dynamically migrates these intensive workloads to the coolest available units based on instantaneous fluid temperatures or absorbed radiation. Our analysis demonstrates that TLB resolves thermal bottlenecks to restore Model Flops Utilization (MFU), while simultaneously reducing physical thermal stress. Extending the operational lifespan of orbital hardware is crucial to amortize the massive embodied carbon of rocket launches, outlining a necessary pathway to scale orbital AI without accelerating e-waste.

Chinese interpretation

背景:AI 数据中心负载、功率密度和能源约束同步上升,AI 运维、负载预测和设施调优正在成为智算中心设计的关键变量。问题:论文聚焦现有方案在效率、可靠性或工程协同上的瓶颈。方法:摘要显示作者采用建模优化、调度分析或算法评估,把运行负载、冷却/能源系统和基础设施约束放在同一分析框架中。结果:研究重点指向AI 负载波动对电网设备寿命和调频边界的影响。意义:对日报读者而言,它可用于判断AI 工具是否能降低运维复杂度并提升可用性。仍需结合全文实验条件、样本范围和成本假设核验。

Reference

Shuyi Chen, Zhengchang Hua, Nikos Tziritas, 等. Hot AI in Cold Space: Thermal-Crosstalk-Aware Scheduling for Sustainable Orbital AI Clusters[J/OL]. (2026-06-23)[2026-07-06]. http://arxiv.org/abs/2606.26150v2.

arXiv Open Chinese poster
Paper 6 S

Grid-Interactive Thermal Management of AI Data Centers via Contextual Dis…

Thermal management in AI data centers is increasingly challenged by bursty workloads and uncertain heat generation. To prevent ther…

Expand
Paper theme visual
算电协同
Paper 6S

Grid-Interactive Thermal Management of AI Data Centers via Contextual Distributionally Robust Optimization

Published
2026-07-01
Authors
Jiachen Shen, Jian Shi, Yijie Yang, Chenye Wu, Dan Wang, Ju Bin Song, Zhu Han
Theme
算电协同
Abstract

Thermal management in AI data centers is increasingly challenged by bursty workloads and uncertain heat generation. To prevent thermal violations, existing cooling strategies either enforce conservative, rigid bounds that severely limit grid responsiveness, or rely on forecast-driven controllers that perform poorly under AI workload uncertainty and distribution shifts. To overcome the above challenges, this paper proposes a Contextual Distributionally Robust Optimization (CDRO) framework for grid-interactive cooling control. Unlike standard DRO with fixed ambiguity sets, the proposed approach dynamically adapts the Wasserstein radius using real-time AI and grid context. This safely shrinks uncertainty bounds during stable regimes, unlocking deep demand-side flexibility. Theoretically, we formulate the control as an infinite-dimensional inf-sup problem, derive an exact tractable reformulation for the Wasserstein worst-case expected-cost term, and then derive a tractable conservative deterministic counterpart for the Distributionally Robust Conditional Value at Risk (DR-CVaR) thermal safety constraint. Solved via a scalable nested Alternating Direction Method of Multipliers (ADMM) algorithm, the CDRO controller achieves near-zero thermal violations under extreme workload spikes in high-fidelity EnergyPlus co-simulations. Simultaneously, it reduces the operational cost premium of robustness by approximately 13.7 percentage points relative to standard Min-Max Model Predictive Control (MPC).

Chinese interpretation

背景:AI 数据中心负载、功率密度和能源约束同步上升,算力负载与电网侧资源的协同调度正在成为智算中心设计的关键变量。问题:论文聚焦现有方案在效率、可靠性或工程协同上的瓶颈。方法:摘要显示作者采用建模优化、调度分析或算法评估,把运行负载、冷却/能源系统和基础设施约束放在同一分析框架中。结果:研究重点指向AI 负载波动对电网设备寿命和调频边界的影响。意义:对日报读者而言,它可用于判断智算中心建设是否受电网容量、负载波动和调度机制约束。仍需结合全文实验条件、样本范围和成本假设核验。

Reference

Jiachen Shen, Jian Shi, Yijie Yang, 等. Grid-Interactive Thermal Management of AI Data Centers via Contextual Distributionally Robust Optimization[J/OL]. (2026-07-01)[2026-07-06]. http://arxiv.org/abs/2607.00099v1.

arXiv Open Chinese poster
Paper 7 S

AI Data Centers and the Water Use Feedback Loop

AI data centres consume water for cooling, water scarcity constrains siting, and AI tools can improve water system efficiency. Thes…

Expand
Paper theme visual
热管理与液冷
Paper 7S

AI Data Centers and the Water Use Feedback Loop

Published
2026-06-20
Authors
Basit A. Akinade, Amobichukwu C. Amanambu, Jonathan M. Frame, Shaolei Ren
Theme
热管理与液冷
Abstract

AI data centres consume water for cooling, water scarcity constrains siting, and AI tools can improve water system efficiency. These dynamics are studied separately yet form a feedback loop. This review formalises the Water and AI Feedback Loop, introduces the Water Consumption Impact index to quantify community-scale utility burden, and demonstrates across ten US sites that burden spans three orders of magnitude, from 0.2% to 134% of host capacity.

Chinese interpretation

背景:AI 数据中心负载、功率密度和能源约束同步上升,液冷、热管理和数据中心能效正在成为智算中心设计的关键变量。问题:论文聚焦现有方案在效率、可靠性或工程协同上的瓶颈。方法:摘要显示作者采用综述归纳和指标比较,把运行负载、冷却/能源系统和基础设施约束放在同一分析框架中。结果:研究重点指向冷却效率、能源利用或运维策略的改进方向。意义:对日报读者而言,它可用于判断液冷方案、热管理路线和高密度部署节奏。仍需结合全文实验条件、样本范围和成本假设核验。

Reference

Basit A. Akinade, Amobichukwu C. Amanambu, Jonathan M. Frame, 等. AI Data Centers and the Water Use Feedback Loop[J/OL]. (2026-06-20)[2026-07-06]. http://arxiv.org/abs/2606.21760v1.

arXiv Open Chinese poster
Paper 8 S

GaN Power Devices and Converter Architectures for AI Data Centers: Effici…

The growth of artificial-intelligence workloads is increasing the electrical and thermal demands on data-center power-delivery syst…

Expand
Paper theme visual
算电协同
Paper 8S

GaN Power Devices and Converter Architectures for AI Data Centers: Efficiency, Reliability, and Deployment Pathways

Published
2026-06-24
Authors
Donald Intal, Abasifreke Ebong
Theme
算电协同
Abstract

The growth of artificial-intelligence workloads is increasing the electrical and thermal demands on data-center power-delivery systems, making conversion efficiency, power density, and reliability critical design priorities. This review examines how gallium-nitride (GaN) power devices can be matched to specific stages of the grid-to-load conversion chain, including power-factor correction, isolated DC/DC conversion, 48-V intermediate-bus conversion, and point-of-load regulation. Si, SiC, and GaN are compared using converter-relevant metrics, and lateral, vertical, and specialized GaN architectures are evaluated in terms of voltage scalability, switching behavior, reverse conduction, thermal pathways, gate control, and technology maturity. The analysis shows that GaN provides a stage-dependent rather than universal advantage. Commercial lateral GaN HEMTs are particularly effective in high-frequency, low-to-mid-voltage stages, while specialized and hybrid devices support bidirectional operation, normally-off control, extreme conversion ratios, and integration. Vertical GaN remains an emerging option for higher-voltage and higher-power conversion. A quantitative framework links cascaded converter efficiency to electrical-loss reduction, cooling demand, annual facility energy use, and operational carbon emissions. Broad deployment further requires low-parasitic packaging, disciplined gate-drive and EMI co-design, mission-profile reliability qualification, scalable manufacturing, and supply-chain resilience. GaN is therefore best treated as a stage-specific system lever whose value depends on coordinated device, topology, package, and thermal co-design.

Chinese interpretation

背景:AI 数据中心负载、功率密度和能源约束同步上升,算力负载与电网侧资源的协同调度正在成为智算中心设计的关键变量。问题:论文聚焦现有方案在效率、可靠性或工程协同上的瓶颈。方法:摘要显示作者采用综述归纳和指标比较,把运行负载、冷却/能源系统和基础设施约束放在同一分析框架中。结果:研究重点指向AI 负载波动对电网设备寿命和调频边界的影响。意义:对日报读者而言,它可用于判断智算中心建设是否受电网容量、负载波动和调度机制约束。仍需结合全文实验条件、样本范围和成本假设核验。

Reference

Donald Intal, Abasifreke Ebong. GaN Power Devices and Converter Architectures for AI Data Centers: Efficiency, Reliability, and Deployment Pathways[J/OL]. (2026-06-24)[2026-07-06]. http://arxiv.org/abs/2606.25281v1.

arXiv Open Chinese poster
Video B

Data Center Leaders on Building AI’s Infrastructure

Bloomberg Live · Query: AI data center energy conference keynote。Useful as technical or research context.

Expand

Data Center Leaders on Building AI’s Infrastructure

学术会议报告 · Bloomberg Live · Query:AI data center energy conference keynote

Open on YouTube
Video B

Keynote: Dr Paolo Bertoldi, Improving Energy, Carbon and Water Efficiency…

ICT4S Conference 2025 · Query: AI data center energy conference keynote。Useful as technical or research context.

Expand

Keynote: Dr Paolo Bertoldi, Improving Energy, Carbon and Water Efficiency in Data Centres and AI

学术会议报告 · ICT4S Conference 2025 · Query:AI data center energy conference keynote

Open on YouTube
Video B

WeCan'22: Brainstorming Session with the Audience - Minghua, George, Davi…

Noman Bashir · Query: ACM SIGEnergy data center energy talk。Useful as technical or research context.

Expand

WeCan'22: Brainstorming Session with the Audience - Minghua, George, David, and Jay

学术讲座 · Noman Bashir · Query:ACM SIGEnergy data center energy talk

Open on YouTube
Video B

Data Democratization Panel | Priya Donti, Julia Stewart Lowndes, Nikki Tu…

WiDS Worldwide · Query: ACM SIGEnergy data center energy talk。Useful as technical or research context.

Expand

Data Democratization Panel | Priya Donti, Julia Stewart Lowndes, Nikki Tulley, Michela Taufer

学术讲座 · WiDS Worldwide · Query:ACM SIGEnergy data center energy talk

Open on YouTube
Video B

Liquid Cooling Technology in Data Centers: How It Supports AI Workloads

Equinix · Query: data center thermal management seminar。Useful as technical or research context.

Expand

Liquid Cooling Technology in Data Centers: How It Supports AI Workloads

专家讲座 · Equinix · Query:data center thermal management seminar

Open on YouTube
Topic B

电力并网与能源约束

Same-source item from the Chinese report. Verify details against the original linked source: 电力并网与能源约束

展开全文
TopicB

电力并网与能源约束

Details

This topic recorded 15 hits with a heat score of 37. Use it as a research and monitoring keyword rather than a factual conclusion.

Topic B

智算中心 CapEx/扩建

Same-source item from the Chinese report. Verify details against the original linked source: 智算中心 CapEx/扩建

展开全文
TopicB

智算中心 CapEx/扩建

Details

This topic recorded 13 hits with a heat score of 28. Use it as a research and monitoring keyword rather than a factual conclusion.

Topic B

AI 芯片供给与交付

Same-source item from the Chinese report. Verify details against the original linked source: AI 芯片供给与交付

展开全文
TopicB

AI 芯片供给与交付

Details

This topic recorded 2 hits with a heat score of 5. Use it as a research and monitoring keyword rather than a factual conclusion.

Industry

Industry

Industry news, products, policy, financing, projects, and market-oriented videos.

Technology S

AI 算力基础设施动态:NVIDIA Blog 发布相关报道(原文标题:How NVIDIA’s Inference Software Stack…

Same-source item from the Chinese report. Verify details against the original linked source: AI 算力基础设施动态:NVIDIA Blog 发布相关报道(原文标题:Ho…

展开全文
TechnologyS

AI 算力基础设施动态:NVIDIA Blog 发布相关报道(原文标题:How NVIDIA’s Inference Software Stack Powers the Lowest Token Cost)

Summary

发布时间:2026-06-30;近 7 天补充观察,非 24 小时窗口内;细节以来源原文为准,本页不复述未核验扩展信息

Entities
NVIDIA
Metrics / amount
No reliable data
Source
NVIDIA Blog
Reading note

Treat amounts, specifications, timing, and order implications as unverified until confirmed by the linked source or an official disclosure.

NVIDIA Blog
Technology S

AI 算力基础设施动态:NVIDIA Blog 发布相关报道(原文标题:Claude Meets Blackwell Ultra: Anthrop…

Same-source item from the Chinese report. Verify details against the original linked source: AI 算力基础设施动态:NVIDIA Blog 发布相关报道(原文标题:Cl…

展开全文
TechnologyS

AI 算力基础设施动态:NVIDIA Blog 发布相关报道(原文标题:Claude Meets Blackwell Ultra: Anthropic’s Models Now Run on NVIDIA GB300 in Azure)

Summary

发布时间:2026-06-30;近 7 天补充观察,非 24 小时窗口内;细节以来源原文为准,本页不复述未核验扩展信息

Entities
NVIDIA
Metrics / amount
No reliable data
Source
NVIDIA Blog
Reading note

Treat amounts, specifications, timing, and order implications as unverified until confirmed by the linked source or an official disclosure.

NVIDIA Blog
Industry A

电力与能源约束观察:Data Center Dynamics 发布相关报道(原文标题:The 20 percent problem: why da…

Same-source item from the Chinese report. Verify details against the original linked source: 电力与能源约束观察:Data Center Dynamics 发布相关报道(…

展开全文
IndustryA

电力与能源约束观察:Data Center Dynamics 发布相关报道(原文标题:The 20 percent problem: why data center sites fail before they’re built)

Summary

发布时间:2026-07-05;检索窗口内;细节以来源原文为准,本页不复述未核验扩展信息

Entities
No reliable data
Metrics / amount
No reliable data
Source
Data Center Dynamics
Reading note

Treat amounts, specifications, timing, and order implications as unverified until confirmed by the linked source or an official disclosure.

Data Center Dynamics
Industry A

智算中心/数据中心建设进展:Data Center Dynamics 发布相关报道,涉及 300MW(原文标题:300MW data center…

Same-source item from the Chinese report. Verify details against the original linked source: 智算中心/数据中心建设进展:Data Center Dynamics 发布相…

展开全文
IndustryA

智算中心/数据中心建设进展:Data Center Dynamics 发布相关报道,涉及 300MW(原文标题:300MW data center campus proposed in Kent, UK)

Summary

发布时间:2026-07-03;近 7 天补充观察,非 24 小时窗口内;可核验指标:300MW;细节以来源原文为准,本页不复述未核验扩展信息

Entities
No reliable data
Metrics / amount
300MW
Source
Data Center Dynamics
Reading note

Treat amounts, specifications, timing, and order implications as unverified until confirmed by the linked source or an official disclosure.

Data Center Dynamics
Industry A

数据中心产业动态:Data Center Dynamics 发布相关报道(原文标题:Equinix-occupied data center in…

Same-source item from the Chinese report. Verify details against the original linked source: 数据中心产业动态:Data Center Dynamics 发布相关报道(原…

展开全文
IndustryA

数据中心产业动态:Data Center Dynamics 发布相关报道(原文标题:Equinix-occupied data center in Manchester, UK, sold to a new landlord - report)

Summary

发布时间:2026-07-03;近 7 天补充观察,非 24 小时窗口内;细节以来源原文为准,本页不复述未核验扩展信息

Entities
Equinix
Metrics / amount
No reliable data
Source
Data Center Dynamics
Reading note

Treat amounts, specifications, timing, and order implications as unverified until confirmed by the linked source or an official disclosure.

Data Center Dynamics
Industry A

数据中心产业动态:Data Center Dynamics 发布相关报道,涉及 $1.75 billion、10GW(原文标题:CPP Inves…

Same-source item from the Chinese report. Verify details against the original linked source: 数据中心产业动态:Data Center Dynamics 发布相关报道,涉…

展开全文
IndustryA

数据中心产业动态:Data Center Dynamics 发布相关报道,涉及 $1.75 billion、10GW(原文标题:CPP Investments to pump $1.75 billion into EQT and EdgeConneX's AI data center build-out)

Summary

发布时间:2026-07-03;近 7 天补充观察,非 24 小时窗口内;可核验指标:$1.75 billion、10GW;细节以来源原文为准,本页不复述未核验扩展信息

Entities
No reliable data
Metrics / amount
$1.75 billion、10GW
Source
Data Center Dynamics
Reading note

Treat amounts, specifications, timing, and order implications as unverified until confirmed by the linked source or an official disclosure.

Data Center Dynamics
Industry A

数据中心产业动态:Data Center Dynamics 发布相关报道(原文标题:New Jersey lawmakers pass bill …

Same-source item from the Chinese report. Verify details against the original linked source: 数据中心产业动态:Data Center Dynamics 发布相关报道(原…

展开全文
IndustryA

数据中心产业动态:Data Center Dynamics 发布相关报道(原文标题:New Jersey lawmakers pass bill to establish large load data center tariff)

Summary

发布时间:2026-07-03;近 7 天补充观察,非 24 小时窗口内;细节以来源原文为准,本页不复述未核验扩展信息

Entities
No reliable data
Metrics / amount
No reliable data
Source
Data Center Dynamics
Reading note

Treat amounts, specifications, timing, and order implications as unverified until confirmed by the linked source or an official disclosure.

Data Center Dynamics
Industry A

电力与能源约束观察:Data Center Dynamics 发布相关报道,涉及 $1.75bn、2GW(原文标题:National Grid V…

Same-source item from the Chinese report. Verify details against the original linked source: 电力与能源约束观察:Data Center Dynamics 发布相关报道,…

展开全文
IndustryA

电力与能源约束观察:Data Center Dynamics 发布相关报道,涉及 $1.75bn、2GW(原文标题:National Grid Ventures invests $1.75bn in Joulent for construction of gas plant powering 2GW Microsoft data center in Texas)

Summary

发布时间:2026-07-03;近 7 天补充观察,非 24 小时窗口内;可核验指标:$1.75bn、2GW;细节以来源原文为准,本页不复述未核验扩展信息

Entities
No reliable data
Metrics / amount
$1.75bn、2GW
Source
Data Center Dynamics
Reading note

Treat amounts, specifications, timing, and order implications as unverified until confirmed by the linked source or an official disclosure.

Data Center Dynamics
Industry A

数据中心产业动态:Data Center Dynamics 发布相关报道,涉及 18MW(原文标题:Nebius signs 18MW lease…

Same-source item from the Chinese report. Verify details against the original linked source: 数据中心产业动态:Data Center Dynamics 发布相关报道,涉…

展开全文
IndustryA

数据中心产业动态:Data Center Dynamics 发布相关报道,涉及 18MW(原文标题:Nebius signs 18MW lease with Merlin Properties at Spain data center - report)

Summary

发布时间:2026-07-03;近 7 天补充观察,非 24 小时窗口内;可核验指标:18MW;细节以来源原文为准,本页不复述未核验扩展信息

Entities
No reliable data
Metrics / amount
18MW
Source
Data Center Dynamics
Reading note

Treat amounts, specifications, timing, and order implications as unverified until confirmed by the linked source or an official disclosure.

Data Center Dynamics
Industry A

数据中心产业动态:Data Center Dynamics 发布相关报道(原文标题:Texas Governor Abbott calls for…

Same-source item from the Chinese report. Verify details against the original linked source: 数据中心产业动态:Data Center Dynamics 发布相关报道(原…

展开全文
IndustryA

数据中心产业动态:Data Center Dynamics 发布相关报道(原文标题:Texas Governor Abbott calls for data centers to be banned in rural areas)

Summary

发布时间:2026-07-03;近 7 天补充观察,非 24 小时窗口内;细节以来源原文为准,本页不复述未核验扩展信息

Entities
No reliable data
Metrics / amount
No reliable data
Source
Data Center Dynamics
Reading note

Treat amounts, specifications, timing, and order implications as unverified until confirmed by the linked source or an official disclosure.

Data Center Dynamics
Technology A

技术与产品进展:Data Center Dynamics 发布相关报道(原文标题:Sponsored: Why even ‘healthy’ da…

Same-source item from the Chinese report. Verify details against the original linked source: 技术与产品进展:Data Center Dynamics 发布相关报道(原文…

展开全文
TechnologyA

技术与产品进展:Data Center Dynamics 发布相关报道(原文标题:Sponsored: Why even ‘healthy’ data centers may be operating at risk)

Summary

发布时间:2026-07-03;近 7 天补充观察,非 24 小时窗口内;细节以来源原文为准,本页不复述未核验扩展信息

Entities
No reliable data
Metrics / amount
No reliable data
Source
Data Center Dynamics
Reading note

Treat amounts, specifications, timing, and order implications as unverified until confirmed by the linked source or an official disclosure.

Data Center Dynamics
Technology A

AI 算力基础设施动态:The Register 发布相关报道,涉及 10 GW(原文标题:SoftBank enters the rent-a-…

Same-source item from the Chinese report. Verify details against the original linked source: AI 算力基础设施动态:The Register 发布相关报道,涉及 10 …

展开全文
TechnologyA

AI 算力基础设施动态:The Register 发布相关报道,涉及 10 GW(原文标题:SoftBank enters the rent-a-GPU race as America looks for support for AI training)

Summary

发布时间:2026-07-03;近 7 天补充观察,非 24 小时窗口内;可核验指标:10 GW;细节以来源原文为准,本页不复述未核验扩展信息

Entities
No reliable data
Metrics / amount
10 GW
Source
The Register
Reading note

Treat amounts, specifications, timing, and order implications as unverified until confirmed by the linked source or an official disclosure.

The Register
Technology A

AI 算力基础设施动态:The Register 发布相关报道,涉及 $42 million(原文标题:Trouble keeps finding…

Same-source item from the Chinese report. Verify details against the original linked source: AI 算力基础设施动态:The Register 发布相关报道,涉及 $42…

展开全文
TechnologyA

AI 算力基础设施动态:The Register 发布相关报道,涉及 $42 million(原文标题:Trouble keeps finding Supermicro as strange server shipments attract police attention in Taiwan and Singapore)

Summary

发布时间:2026-07-02;近 7 天补充观察,非 24 小时窗口内;可核验指标:$42 million;细节以来源原文为准,本页不复述未核验扩展信息

Entities
Supermicro
Metrics / amount
$42 million
Source
The Register
Reading note

Treat amounts, specifications, timing, and order implications as unverified until confirmed by the linked source or an official disclosure.

The Register
Technology A

技术与产品进展:ServeTheHome 发布相关报道,涉及 2026 w(原文标题:ASRock Rack Had One of the Fir…

Same-source item from the Chinese report. Verify details against the original linked source: 技术与产品进展:ServeTheHome 发布相关报道,涉及 2026 w(…

展开全文
TechnologyA

技术与产品进展:ServeTheHome 发布相关报道,涉及 2026 w(原文标题:ASRock Rack Had One of the First Arm AGI Servers at Computex 2026)

Summary

发布时间:2026-07-04;近 7 天补充观察,非 24 小时窗口内;可核验指标:2026 w;细节以来源原文为准,本页不复述未核验扩展信息

Entities
No reliable data
Metrics / amount
2026 w
Source
ServeTheHome
Reading note

Treat amounts, specifications, timing, and order implications as unverified until confirmed by the linked source or an official disclosure.

ServeTheHome
Technology A

技术与产品进展:Data Center Knowledge 发布相关报道(原文标题:Rack-Based Environmental Monito…

Same-source item from the Chinese report. Verify details against the original linked source: 技术与产品进展:Data Center Knowledge 发布相关报道(原…

展开全文
TechnologyA

技术与产品进展:Data Center Knowledge 发布相关报道(原文标题:Rack-Based Environmental Monitoring: Benefits, Insights, and Getting Started)

Summary

发布时间:2026-06-30;近 7 天补充观察,非 24 小时窗口内;细节以来源原文为准,本页不复述未核验扩展信息

Entities
No reliable data
Metrics / amount
No reliable data
Source
Data Center Knowledge
Reading note

Treat amounts, specifications, timing, and order implications as unverified until confirmed by the linked source or an official disclosure.

Data Center Knowledge
Policy A

智算中心/数据中心建设进展:Data Center Knowledge 发布相关报道(原文标题:NERC Flags AI Data Center…

Same-source item from the Chinese report. Verify details against the original linked source: 智算中心/数据中心建设进展:Data Center Knowledge 发布…

展开全文
PolicyA

智算中心/数据中心建设进展:Data Center Knowledge 发布相关报道(原文标题:NERC Flags AI Data Center Grid Risks in Report)

Summary

发布时间:2026-07-03;近 7 天补充观察,非 24 小时窗口内;细节以来源原文为准,本页不复述未核验扩展信息

Entities
No reliable data
Metrics / amount
No reliable data
Source
Data Center Knowledge
Reading note

Treat amounts, specifications, timing, and order implications as unverified until confirmed by the linked source or an official disclosure.

Data Center Knowledge
Financing A

AI 算力基础设施动态:The Register 发布相关报道(原文标题:Nvidia floats double-dipping datacen…

Same-source item from the Chinese report. Verify details against the original linked source: AI 算力基础设施动态:The Register 发布相关报道(原文标题:N…

展开全文
FinancingA

AI 算力基础设施动态:The Register 发布相关报道(原文标题:Nvidia floats double-dipping datacenter financing scheme)

Summary

发布时间:2026-07-03;近 7 天补充观察,非 24 小时窗口内;细节以来源原文为准,本页不复述未核验扩展信息

Entities
NVIDIA
Metrics / amount
No reliable data
Source
The Register
Reading note

Treat amounts, specifications, timing, and order implications as unverified until confirmed by the linked source or an official disclosure.

The Register
Financing A

电力与能源约束观察:Data Center Knowledge 发布相关报道(原文标题:Stargate Update: AI’s Biggest…

Same-source item from the Chinese report. Verify details against the original linked source: 电力与能源约束观察:Data Center Knowledge 发布相关报道…

展开全文
FinancingA

电力与能源约束观察:Data Center Knowledge 发布相关报道(原文标题:Stargate Update: AI’s Biggest Data Center Buildout Meets Reality)

Summary

发布时间:2026-06-30;近 7 天补充观察,非 24 小时窗口内;细节以来源原文为准,本页不复述未核验扩展信息

Entities
No reliable data
Metrics / amount
No reliable data
Source
Data Center Knowledge
Reading note

Treat amounts, specifications, timing, and order implications as unverified until confirmed by the linked source or an official disclosure.

Data Center Knowledge
Financing A

AI 算力基础设施动态:HPCwire 发布相关报道,涉及 $35、$35 million、$60 million(原文标题:OXMIQ Rais…

Same-source item from the Chinese report. Verify details against the original linked source: AI 算力基础设施动态:HPCwire 发布相关报道,涉及 $35、$35 …

展开全文
FinancingA

AI 算力基础设施动态:HPCwire 发布相关报道,涉及 $35、$35 million、$60 million(原文标题:OXMIQ Raises $35M to Scale OxCore Architecture)

Summary

发布时间:2026-07-03;近 7 天补充观察,非 24 小时窗口内;可核验指标:$35、$35 million、$60 million;细节以来源原文为准,本页不复述未核验扩展信息

Entities
No reliable data
Metrics / amount
$35、$35 million、$60 million
Source
HPCwire
Reading note

Treat amounts, specifications, timing, and order implications as unverified until confirmed by the linked source or an official disclosure.

HPCwire
Video B

Data Centers and the Future of AI Infrastructure: Federal, Local, and Ind…

Center for Strategic & International Studies · Query: AI infrastructure datacenter panel discussion。Useful for product, market, or …

Expand

Data Centers and the Future of AI Infrastructure: Federal, Local, and Industry Perspectives

专家圆桌 · Center for Strategic & International Studies · Query:AI infrastructure datacenter panel discussion

Open on YouTube
Video B

Hot Liquid Cooling: 45°C Breakthrough for More Power #NVIDIA #JENSENHUANG

DPN Creative · Query: high performance computing data center cooling workshop。Useful for product, market, or deployment context.

Expand

Hot Liquid Cooling: 45°C Breakthrough for More Power #NVIDIA #JENSENHUANG

技术研讨会 · DPN Creative · Query:high performance computing data center cooling workshop

Open on YouTube
Video B

Inside the Data Center Boom: Understanding the Massive Infrastructure Tha…

Steve Eisman · Query: AI infrastructure datacenter panel discussion。Useful for product, market, or deployment context.

Expand

Inside the Data Center Boom: Understanding the Massive Infrastructure That Supports AI

专家圆桌 · Steve Eisman · Query:AI infrastructure datacenter panel discussion

Open on YouTube
Heat score B

产业热度指数 10/10

Same-source item from the Chinese report. Verify details against the original linked source: 产业热度指数 10/10

展开全文
Heat scoreB

Industry heat score 10/10

Details

The score reflects source coverage and topic density across 27 observed items. It is not an investment signal.

Carryover B

NVIDIA Blackwell/GB200/GB300

Same-source item from the Chinese report. Verify details against the original linked source: NVIDIA Blackwell/GB200/GB300

Expand
CarryoverB

NVIDIA Blackwell/GB200/GB300

Details

今日延续上榜

Carryover B

AI 芯片供给与交付

Same-source item from the Chinese report. Verify details against the original linked source: AI 芯片供给与交付

展开全文
CarryoverB

AI 芯片供给与交付

Details

今日延续上榜

Carryover B

智算中心 CapEx/扩建

Same-source item from the Chinese report. Verify details against the original linked source: 智算中心 CapEx/扩建

展开全文
CarryoverB

智算中心 CapEx/扩建

Details

今日延续上榜

4. Video signals

Data Center Leaders on Building AI’s Infrastructure

学术会议报告 · Bloomberg Live · Query: AI data center energy conference keynote

Open on YouTube

Keynote: Dr Paolo Bertoldi, Improving Energy, Carbon and Water Efficiency in Data Centres and AI

学术会议报告 · ICT4S Conference 2025 · Query: AI data center energy conference keynote

Open on YouTube

WeCan'22: Brainstorming Session with the Audience - Minghua, George, David, and Jay

学术讲座 · Noman Bashir · Query: ACM SIGEnergy data center energy talk

Open on YouTube

Data Democratization Panel | Priya Donti, Julia Stewart Lowndes, Nikki Tulley, Michela Taufer

学术讲座 · WiDS Worldwide · Query: ACM SIGEnergy data center energy talk

Open on YouTube

Data Centers and the Future of AI Infrastructure: Federal, Local, and Industry Perspectives

专家圆桌 · Center for Strategic & International Studies · Query: AI infrastructure datacenter panel discussion

Open on YouTube

Hot Liquid Cooling: 45°C Breakthrough for More Power #NVIDIA #JENSENHUANG

技术研讨会 · DPN Creative · Query: high performance computing data center cooling workshop

Open on YouTube

Inside the Data Center Boom: Understanding the Massive Infrastructure That Supports AI

专家圆桌 · Steve Eisman · Query: AI infrastructure datacenter panel discussion

Open on YouTube

Liquid Cooling Technology in Data Centers: How It Supports AI Workloads

专家讲座 · Equinix · Query: data center thermal management seminar

Open on YouTube

Sources

Collection notes

  • 当前自动化环境未配置 Tavily、Bing News 或 SerpAPI 检索密钥;脚本将使用公开 RSS/Atom、公共 arXiv 接口与固定监测源,不会编造产业新闻。
  • 论文池:已从本地论文池读取 19 条候选;池更新时间 2026-07-06 15:03。
  • x.ai 论文解读:文本生成失败,已回退到规则化论文摘要;原因:HTTP 403:{"code":"permission-denied","error":"Your team 472c8744-ad4f-4879-a588-fa7645e04979 has either used all available credits or reached its monthly spending limit. To continue making…
  • x.ai 论文配图:论文 1 生成失败,已使用内置主题图;原因:HTTP 403:{"code":"permission-denied","error":"Your team 472c8744-ad4f-4879-a588-fa7645e04979 has either used all available credits or reached its monthly spending limit. To continue making…
  • x.ai 论文配图:论文 2 生成失败,已使用内置主题图;原因:HTTP 403:{"code":"permission-denied","error":"Your team 472c8744-ad4f-4879-a588-fa7645e04979 has either used all available credits or reached its monthly spending limit. To continue making…
  • x.ai 论文配图:论文 3 生成失败,已使用内置主题图;原因:HTTP 403:{"code":"permission-denied","error":"Your team 472c8744-ad4f-4879-a588-fa7645e04979 has either used all available credits or reached its monthly spending limit. To continue making…
  • x.ai 论文配图:论文 4 生成失败,已使用内置主题图;原因:HTTP 403:{"code":"permission-denied","error":"Your team 472c8744-ad4f-4879-a588-fa7645e04979 has either used all available credits or reached its monthly spending limit. To continue making…
  • x.ai 论文配图:论文 5 生成失败,已使用内置主题图;原因:HTTP 403:{"code":"permission-denied","error":"Your team 472c8744-ad4f-4879-a588-fa7645e04979 has either used all available credits or reached its monthly spending limit. To continue making…
  • x.ai 论文配图:论文 6 生成失败,已使用内置主题图;原因:HTTP 403:{"code":"permission-denied","error":"Your team 472c8744-ad4f-4879-a588-fa7645e04979 has either used all available credits or reached its monthly spending limit. To continue making…
  • x.ai 论文配图:论文 7 生成失败,已使用内置主题图;原因:HTTP 403:{"code":"permission-denied","error":"Your team 472c8744-ad4f-4879-a588-fa7645e04979 has either used all available credits or reached its monthly spending limit. To continue making…
  • x.ai 论文配图:论文 8 生成失败,已使用内置主题图;原因:HTTP 403:{"code":"permission-denied","error":"Your team 472c8744-ad4f-4879-a588-fa7645e04979 has either used all available credits or reached its monthly spending limit. To continue making…
  • AI 分析:x.ai 调用失败,已回退到规则化模板;原因:HTTP 403:{"code":"permission-denied","error":"Your team 472c8744-ad4f-4879-a588-fa7645e04979 has either used all available credits or reached its monthly spending limit…
Data Center Dynamics The 20 percent problem: why data center sites fail before they’re built Credibility: A Data Center Dynamics 300MW data center campus proposed in Kent, UK Credibility: A Data Center Dynamics Equinix-occupied data center in Manchester, UK, sold to a new landlord - report Credibility: A Data Center Dynamics CPP Investments to pump $1.75 billion into EQT and EdgeConneX's AI data center build-out Credibility: A Data Center Dynamics New Jersey lawmakers pass bill to establish large load data center tariff Credibility: A Data Center Dynamics National Grid Ventures invests $1.75bn in Joulent for construction of gas plant powering 2GW Microsoft data center in Texas Credibility: A Data Center Dynamics Nebius signs 18MW lease with Merlin Properties at Spain data center - report Credibility: A Data Center Dynamics Sponsored: Why even ‘healthy’ data centers may be operating at risk Credibility: A Data Center Dynamics Texas Governor Abbott calls for data centers to be banned in rural areas Credibility: A Data Center Dynamics Amazon's carbon emissions grow by 16 percent in 2025, on the back of record data center capacity additions Credibility: A The Register Startup targets datacenters with 3D-printed nuclear reactor module Credibility: A The Register EU appears to find datacenter emissions easier to offset than lobbyists Credibility: A The Register Nvidia floats double-dipping datacenter financing scheme Credibility: A The Register SoftBank enters the rent-a-GPU race as America looks for support for AI training Credibility: A The Register Trouble keeps finding Supermicro as strange server shipments attract police attention in Taiwan and Singapore Credibility: A ServeTheHome Spotted at Computex 2026: Micron’s First PCIe Gen6 Data Center SSD, the 9650 Credibility: A ServeTheHome ASRock Rack Had One of the First Arm AGI Servers at Computex 2026 Credibility: A Data Center Knowledge NERC Flags AI Data Center Grid Risks in Report Credibility: A Data Center Knowledge Texas Tests New Rules for AI Campuses Behind Existing Power Plants Credibility: A Data Center Knowledge New Data Center Developments: July 2026 Credibility: A Data Center Knowledge AI Interconnect Delays Spur $1.75B National Grid-Joulent Deal Credibility: A Data Center Knowledge Data Center Power Coalition Launches to Tackle AI’s Biggest Bottleneck Credibility: A Data Center Knowledge How Do Utilities Determine Which AI Data Centers Get Grid Access? Credibility: A Data Center Knowledge Why AI Data Centers Make Existing Power Plants More Valuable Credibility: A Data Center Knowledge Digital Realty Pays $3.5B for Blackstone Data Center Stakes Credibility: A Data Center Knowledge Stargate Update: AI’s Biggest Data Center Buildout Meets Reality Credibility: A Data Center Knowledge Rack-Based Environmental Monitoring: Benefits, Insights, and Getting Started Credibility: A HPCwire OXMIQ Raises $35M to Scale OxCore Architecture Credibility: A NVIDIA Blog NVIDIA BioNeMo Agent Toolkit Brings Accelerated AI to Life Sciences Researchers in Claude Science Credibility: S NVIDIA Blog How NVIDIA’s Inference Software Stack Powers the Lowest Token Cost Credibility: S NVIDIA Blog Claude Meets Blackwell Ultra: Anthropic’s Models Now Run on NVIDIA GB300 in Azure Credibility: S arXiv Learning Burst-Aware Early Warning Models for Capacity Stress under AI Workload Surges in Hyperscale Data Centers Credibility: S arXiv Revisiting "Cooler is Better": ITD-Aware Per-CPU Thermal Optimization for Sustainable Data Center Operation Credibility: S arXiv WattGPU: Predicting Inference Power and Latency on Unseen GPUs and LLMs Credibility: S arXiv Financing Artificial Intelligence Infrastructure: Mapping AI Infrastructure Investment and Compute Governance Across Africa Credibility: S arXiv Hot AI in Cold Space: Thermal-Crosstalk-Aware Scheduling for Sustainable Orbital AI Clusters Credibility: S arXiv Grid-Interactive Thermal Management of AI Data Centers via Contextual Distributionally Robust Optimization Credibility: S arXiv AI Data Centers and the Water Use Feedback Loop Credibility: S arXiv GaN Power Devices and Converter Architectures for AI Data Centers: Efficiency, Reliability, and Deployment Pathways Credibility: S arXiv 计算机科学 https://arxiv.org/search/cs?query=data+center+cooling+liquid+thermal&searchtype=all Credibility: S NVIDIA 数据中心 https://www.nvidia.com/en-us/data-center/ Credibility: S 开放计算项目 OCP https://www.opencompute.org/ Credibility: S ASHRAE 技术资源 https://www.ashrae.org/technical-resources Credibility: S 工信部 https://www.miit.gov.cn/ Credibility: S 中国信通院 https://www.caict.ac.cn/ Credibility: S Data Center Dynamics https://www.datacenterdynamics.com/en/rss/ Credibility: A The Register https://www.theregister.com/headlines.atom Credibility: A ServeTheHome https://www.servethehome.com/feed/ Credibility: A Data Center Knowledge https://www.datacenterknowledge.com/rss.xml Credibility: A HPCwire https://www.hpcwire.com/feed/ Credibility: A NVIDIA Blog https://blogs.nvidia.com/feed/ Credibility: S