Liquid Cooling and AI Data Center Daily | 2026-11-13

A daily English mirror of liquid cooling, AI data center efficiency, research papers, products, policy, financing, and supply-chain signals.

AI data center liquid cooling daily visual
Daily tracking of AI data centers, liquid cooling, power constraints, and infrastructure supply chains.
Collection window2026-11-12 08:00 北京时间 - 2026-11-13 08:00 北京时间
Industry heat score10/10
Updated2026-11-13 16:46 Beijing time

1. Executive brief

This English edition mirrors the same public-source dataset used by the Chinese daily report for 2026-11-13.

  • Collection window: 2026-11-12 08:00 北京时间 - 2026-11-13 08:00 北京时间.
  • Coverage snapshot: 8 industry items; 6 technology items; 8 paper or white-paper items; 8 video signals.
  • Current hot topics: 电力并网与能源约束, 智算中心 CapEx/扩建, 液冷路线(冷板/浸没/两相).
  • The heat score is 10/10 and should be read as a source-density signal, not as an investment indicator.

All claims should be verified against the original source links listed at the end of this report.

Academic and Industry Briefs

Papers, videos, industry updates, policy, financing, and projects are compressed into scannable tags with a title, summary, and source link.

Academic

Academic

Research papers, methods, research-oriented videos, and academic signals.

Paper 1 S

Locked In: Multi-Objective RL for the AI Data Center Build-Out

AI data center build-out is a multi-trillion-dollar, multi-decade infrastructure program. Yet siting, power procurement, and coolin…

Expand
Paper theme visual
算电协同
Paper 1S

Locked In: Multi-Objective RL for the AI Data Center Build-Out

Research perspective (Chinese)

选址与冷却决策会锁定多年资本和资源路径,初始评分难以代表全寿命表现。规划模型需要同时保留承诺不可逆性、改造时机与预测失准的代价。

Published
2026-10-26
Authors
Satyapragnya Kar, Rajarshi Das, PR Panigrahi
Theme
算电协同
Abstract

AI data center build-out is a multi-trillion-dollar, multi-decade infrastructure program. Yet siting, power procurement, and cooling decisions are still made with static, single-point scoring tools. These tools are evaluated once, on day-zero numbers. This is a poor fit. A site's water, power, and carbon profile drifts substantially over the 10 to 20 year asset life. The governing decisions are also irreversible, and they bind capital and physical plant for years. We formalize long-horizon build-out as a tiered multi-objective Markov decision process. Strategic commitments are gated to discrete windows, incur switching costs, and energize only after source-dependent lead times. Operational dispatch is restricted to capacity that physically exists. We solve the problem with a preference-conditioned multi-objective agent that has a semi-Markov manager and worker hierarchy. The agent recovers a family of policies that a planner can steer across cost, carbon, water, and reliability at inference time. We validate long-horizon dynamics with a lightweight counterfactual rollout model. Across three commitment regimes (irreversible, reversible, and commit-once) on real site data, preference conditioning yields a confirmed, steerable trade-off on both objective pairs in every regime. Imposing lock-in produces a more evenly covered frontier and a far more consistent rate of anticipatory retrofit ahead of a binding water-stress constraint than a freely reversible formulation. Finally, a compact counterfactual dynamics model tracks slow-moving state well. It is measurably outperformed by simple persistence on the water-stress axis. We report this limitation rather than obscure it. We release the environment, agents, baselines, and evaluation harness. All of them are grounded in real interconnection-queue, water-stress, and grid-emissions data.

Chinese interpretation

该研究将数据中心建设问题建模为多目标决策过程,采用强化学习方法进行优化。方法在真实数据上验证了多目标平衡的有效性,但需注意其适用条件。

Reference

Satyapragnya Kar, Rajarshi Das, PR Panigrahi. Locked In: Multi-Objective RL for the AI Data Center Build-Out[J/OL]. (2026-10-26)[2026-11-13]. http://arxiv.org/abs/2610.35147v1.

arXiv Open Chinese poster
Paper 2 S

Real-Time Nonlinear Mixed-Integer Model Predictive Control With Horizon-T…

Model predictive control (MPC) of nonlinear systems with discrete decisions leads to mixed-integer nonlinear programs (MINLPs) whos…

Expand
Paper theme visual
热管理与液冷
Paper 2S

Real-Time Nonlinear Mixed-Integer Model Predictive Control With Horizon-Tail Relaxations

Research perspective (Chinese)

该方法通过时域尾部松弛策略降低计算复杂度,为实时控制提供了可行路径。研究揭示了离散控制重构与非线性优化的协同机制,值得进一步验证其在不同预测时域长度下的稳定性表现。

Published
2026-11-06
Authors
Armin Nurkanović
Theme
热管理与液冷
Abstract

Model predictive control (MPC) of nonlinear systems with discrete decisions leads to mixed-integer nonlinear programs (MINLPs) whose combinatorial complexity often prevents real-time deployment. In this paper, we propose a decomposition-based MPC method that reorders and reduces computations to shorten the delay between receiving a state measurement and applying the control input. Before the measurement arrives, we solve a continuous relaxation of the MINLP at a predicted state and construct a mixed-integer quadratic program (MIQP). Once the measured state is available, we solve the MIQP that reconstructs the discrete controls and simultaneously performs one sequential quadratic programming step toward the corresponding nonlinear solution. To reduce the combinatorial complexity in the horizon length, we either fix the integer controls or relax their integrality over the prediction horizon tail, while retaining an integer-feasible first control input. We derive error bounds relating the nonlinear objective values obtained with the horizon-tail approximations to the optimal value of the original mixed-integer problem. In a data center cooling example, the proposed method reduces mean feedback computation time by 94% relative to a state-of-the-art MINLP method with a total closed-loop cost difference of less than 1%.

Chinese interpretation

本文研究非线性系统中混合整数规划的实时控制问题,采用分解策略优化计算流程并降低组合复杂度。通过预测状态预计算与时域尾部松弛技术,实现控制决策的快速求解。该方法在数据中心冷却场景中验证了计算效率提升与控制性能的平衡,为复杂系统实时控制提供了新思路。以上判断仅依据摘要,方法细节与适用条件请核验原文。

Reference

Armin Nurkanović. Real-Time Nonlinear Mixed-Integer Model Predictive Control With Horizon-Tail Relaxations[J/OL]. (2026-11-06)[2026-11-13]. http://arxiv.org/abs/2611.09187v1.

arXiv Open Chinese poster
Paper 3 S

Impact of Grid-Interactive Data Center Microgrids on Grid Reliability

Traditional data centers, operating as passive loads with standby backup resources, present significant challenges for grid integra…

Expand
Paper theme visual
算电协同
Paper 3S

Impact of Grid-Interactive Data Center Microgrids on Grid Reliability

Research perspective (Chinese)

电网互动微电网通过协调资源管理提升电网可靠性,其效果依赖于负荷峰值重叠场景。研究提示需验证不同负荷模式下智能控制策略的适应性,特别是本地发电与储能系统的协同调度机制。

Published
2026-11-12
Authors
Kiran Kumar Challa, Kumarsinh Jhala
Theme
算电协同
Abstract

Traditional data centers, operating as passive loads with standby backup resources, present significant challenges for grid integration due to their scale, rapid load fluctuations, and limited operational flexibility. This article investigates the transformative potential of grid-interactive data center microgrids, which integrate battery energy storage, on-site generation, and intelligent microgrid controllers to actively support both facility and grid operations. The proposed simulation framework enables the study comparing conventional and grid-interactive architectures under a range of steady-state and contingency scenarios. Results reveal that grid-interactive microgrids can substantially reduce peak grid demand, improve voltage stability, and improve system reliability especially when data center and system load peaks coincide. The findings highlight the critical role of coordinated resource management in enabling the reliable and efficient integration of large data center loads, and provide a practical methodology for assessing their system-level impacts.

Chinese interpretation

本文探讨了电网互动数据中心微电网对电网可靠性的提升,采用仿真框架对比传统与电网互动架构。研究聚焦于电池储能、本地发电和智能控制技术在应对负荷波动和提升电压稳定性中的作用,分析了数据中心与电网协同运行的潜在优势,为数据中心与电网集成提供了新的研究视角和方法论支持。以上判断仅依据摘要,方法细节与适用条件请核验原文。

Reference

Kiran Kumar Challa, Kumarsinh Jhala. Impact of Grid-Interactive Data Center Microgrids on Grid Reliability[J/OL]. (2026-11-12)[2026-11-13]. http://arxiv.org/abs/2611.15903v1.

arXiv Open Chinese poster
Paper 4 S

Speed-to-Power Dominates Energy Costs for AI Data Centers: Technoeconomic…

The rapid growth of artificial intelligence is driving demand for new data centers at large scale and on short deployment timelines…

Expand
Paper theme visual
算电协同
Paper 4S

Speed-to-Power Dominates Energy Costs for AI Data Centers: Technoeconomic Analysis of Powering AI in the Continental United States

Research perspective (Chinese)

直流耦合技术通过减少逆变器和提升效率降低能源成本,但其经济优势依赖于建设速度。研究提示应验证不同气候区直流耦合系统的实际部署效益,以及如何优化电力转换阶段的能效匹配。

Published
2026-11-13
Authors
Alex C. Newkirk, Daniel L. Gerber, Erica R. H. Fuchs, Alex Hubbard, M. Granger Morgan, Arman Shehabi, Sarah J. Smith, Constantine Samaras
Theme
算电协同
Abstract

The rapid growth of artificial intelligence is driving demand for new data centers at large scale and on short deployment timelines. To power them, firms connect to the commercial grid or contract generation directly, but interconnection and gas-turbine delays now incentivize on-site generation. We compare grid-connected and off-grid data center energy infrastructure (AC- and DC-coupled solar-plus-storage, islanded natural gas, and grid interconnection) across the continental U.S. Using an open-source technoeconomic framework built on empirically calibrated AI training loads, climate-driven cooling, stage-by-stage power conversion, and physics-based battery degradation, we model designs providing equivalent energy services. Our central contribution is a speed-adjusted cost of energy that values the compute unlocked by faster construction, making options with different deployment timelines directly comparable on one physically consistent basis. We find DC coupling reduces lifetime energy costs by 18% ($0.09/ kWh) on average versus AC counterparts by eliminating inverters and improving efficiency. Though rarely cheapest on unadjusted energy cost, DC-coupled microgrids' faster deployment makes them the lowest-cost modeled option in 85% of U.S. locations once foregone compute is valued, or 55% under accelerated natural gas timelines. For AI infrastructure, deployment speed rather than unit energy cost determines the economically preferred path to power.

Chinese interpretation

本文聚焦AI数据中心供电方式选择问题,采用技术经济分析方法,结合实际负载、气候条件和设备特性进行建模。通过引入部署速度调整的能源成本指标,揭示了建设速度对经济性的重要影响。研究为数据中心供电方案选择提供了新视角,尤其强调了快速部署带来的计算能力释放价值。以上判断仅依据摘要,方法细节与适用条件请核验原文。

Reference

Alex C. Newkirk, Daniel L. Gerber, Erica R. H. Fuchs, 等. Speed-to-Power Dominates Energy Costs for AI Data Centers: Technoeconomic Analysis of Powering AI in the Continental United States[J/OL]. (2026-11-13)[2026-11-13]. http://arxiv.org/abs/2611.17098v1.

arXiv Open Chinese poster
Paper 5 S

Can STATCOM and UPS-Based Voltage Support Mitigate Fault-Induced Reductio…

Artificial intelligence data centers (AIDCs) are rapidly increasing in number and capacity. These large electronic loads are interf…

Expand
Paper theme visual
算电协同
Paper 5S

Can STATCOM and UPS-Based Voltage Support Mitigate Fault-Induced Reductions in AI Data Center Grid Power Draw?

Research perspective (Chinese)

UPS通过动态调节有功吸收以维持无功容量的机制为电压支撑策略提供了新思路。在设计电力电子负载的故障穿越能力时,需进一步验证不同电压骤降深度下有功-无功协调控制的优化边界。

Published
2026-11-12
Authors
Ziang Liu, Yimeng Liu, Francis Yunhe Hou
Theme
算电协同
Abstract

Artificial intelligence data centers (AIDCs) are rapidly increasing in number and capacity. These large electronic loads are interfaced through power electronic devices and can sharply reduce grid power intake during fault-induced voltage sags. Disturbances exceeding equipment ride-through capabilities may also trigger protective disconnection, posing risks to power system security. Static synchronous compensators (STATCOMs) and appropriately controlled AIDC uninterruptible power supply (UPS) rectifiers can provide reactive power support during voltage sags. This paper compares the individual and combined effectiveness of STATCOM and UPS-based voltage support in mitigating fault-induced reductions in grid power intake through electromagnetic transient simulations of a 1 GW AIDC connected to an IEEE nine-bus system. Simulation results show that STATCOM support better preserves short-term intake in milder tested faults, whereas UPS coordination maintains rectifier operation under deeper sags by reducing active intake to reserve reactive current capacity. Combined support improves auxiliary load retention and recovery in selected cases. However, severe tested sags still cause substantial grid-demand reductions even with combined support.

Chinese interpretation

本文研究电压骤降对AI数据中心电网功率吸收的影响及STATCOM与UPS电压支撑的缓解作用,采用电磁暂态仿真方法分析两种设备在不同故障深度下的性能差异。研究结果为理解电力电子负载在电网扰动中的响应机制提供了实证依据,对提升数据中心供电可靠性具有参考价值。以上判断仅依据摘要,方法细节与适用条件请核验原文。

Reference

Ziang Liu, Yimeng Liu, Francis Yunhe Hou. Can STATCOM and UPS-Based Voltage Support Mitigate Fault-Induced Reductions in AI Data Center Grid Power Draw?[J/OL]. (2026-11-12)[2026-11-13]. http://arxiv.org/abs/2611.16569v1.

arXiv Open Chinese poster
Paper 6 S

Scalable Reference Electrical Architectures for Modern Data Centers

The rapid growth of cloud computing, artificial intelligence (AI), and high-performance computing is driving the deployment of data…

Expand
Paper theme visual
算电协同
Paper 6S

Scalable Reference Electrical Architectures for Modern Data Centers

Research perspective (Chinese)

模块化电源 POD 设计为数据中心电力系统扩展提供结构化路径。建议验证不同电源配置在极端负载波动下的动态响应特性。

Published
2026-11-12
Authors
Kiran Kumar Challa</name> <arxiv:affiliation>Joann</arxiv:affiliation> </author> <author> <name> Yan</name> <arxiv:affiliation>Joann</arxiv:affiliation> </author> <author> <name> Zhou, Kumarsinh Jhala
Theme
算电协同
Abstract

The rapid growth of cloud computing, artificial intelligence (AI), and high-performance computing is driving the deployment of data centers with electrical demands ranging from tens of megawatts to multi-gigawatt campuses, creating significant challenges for utility interconnection and power system planning. This paper presents scalable, vendor-neutral reference electrical architectures for colocation, hyperscale, and AI data centers. The proposed framework integrates modular Power PODs, hierarchical HV/MV/LV distribution, standby generation, uninterruptible power supplies (UPS), battery energy storage systems (BESS), and scalable utility interfaces into a unified planning methodology. Three representative Power POD configurations are developed to support systematic capacity expansion while maintaining consistent electrical topology and equipment sizing. The proposed architectures facilitate utility interconnection studies, equipment demand forecasting, transmission planning, and grid infrastructure assessment, providing an open and reproducible benchmark for evaluating the impacts of large-scale data center deployment on future power systems.

Chinese interpretation

本文针对数据中心电力系统规划难题,提出整合多种电力设备的统一架构方案。通过模块化设计和分层配电结构,实现电力系统可扩展性与稳定性的平衡。研究方法结合了电源 POD、储能系统和电网接口的协同规划,为数据中心与电网的协同设计提供技术框架,对理解大规模数据中心对电力系统的影响具有参考价值。以上判断仅依据摘要,方法细节与适用条件请核验原文。

Reference

Kiran Kumar Challa</name> <arxiv:affiliation>Joann</arxiv:affiliation> </author> <author> <name> Yan</name> <arxiv:affiliation>Joann</arxiv:affiliation> </author> <author> <name> Zhou, Kumarsinh Jhala. Scalable Reference Electrical Architectures for Modern Data Centers[J/OL]. (2026-11-12)[2026-11-13]. http://arxiv.org/abs/2611.15712v1.

arXiv Open Chinese poster
Paper 7 S

Assessing Data Center Hosting Capacity Considering Electromagnetic Transi…

Hosting capacity is commonly assessed with steady-state optimization, which leaves the dynamic response of the data center and the …

Expand
Paper theme visual
算电协同
Paper 7S

Assessing Data Center Hosting Capacity Considering Electromagnetic Transient Dynamics

Research perspective (Chinese)

电磁暂态动态显著限制数据中心接入容量,需在评估中纳入。接入位置优化应优先考虑停运后动态容量边界,这为电网规划提供了具体验证方向。

Published
2026-11-12
Authors
Fan Jiang, Xingpeng Li
Theme
算电协同
Abstract

Hosting capacity is commonly assessed with steady-state optimization, which leaves the dynamic response of the data center and the grid at the resulting operating point untested. This paper assesses candidate data center capacities by coupling a unit commitment (UC) model with electromagnetic transient (EMT) simulation. During the capacity search, the UC model determines the economic dispatch for each tested data center capacity, and the resulting operating points are tested for settling with the generators committed online by the UC model and after a selected synchronous generator outage. Three nested capacities are obtained: the optimization-based steady-state capacity, the dynamic pre-outage capacity, and the post-outage dynamic capacity, each bounded by the previous one. On a test system with a detailed data center model, both dynamic capacities fall well below the optimization capacity, and the ranking of connection locations changes with the assessment stage and with the outage. In the most severe outage case at each candidate bus, the capacity is about 30% below the steady-state capacity. Thus, the dynamic response of the data center and the grid should be part of the hosting capacity assessment, and the comparison of connection locations should be made on the post-outage dynamic capacity.

Chinese interpretation

本文针对数据中心与电网协同运行中的动态响应问题,提出结合机组组合模型与电磁暂态仿真的评估方法,揭示了动态容量与稳态容量的差异及其对接入位置选择的影响,为数据中心接入电网的稳定性研究提供了新视角。以上判断仅依据摘要,方法细节与适用条件请核验原文。

Reference

Fan Jiang, Xingpeng Li. Assessing Data Center Hosting Capacity Considering Electromagnetic Transient Dynamics[J/OL]. (2026-11-12)[2026-11-13]. http://arxiv.org/abs/2611.15704v1.

arXiv Open Chinese poster
Paper 8 S

Decision-Focused Learning via Neural Optimization Layers for Battery-Assi…

Rapid AI data-center power fluctuations challenge grid integration. Sustained grid-import smoothing requires allocating limited bat…

Expand
Paper theme visual
算电协同
Paper 8S

Decision-Focused Learning via Neural Optimization Layers for Battery-Assisted Grid-Import Smoothing in AI Data Centers

Research perspective (Chinese)

该研究通过神经优化层实现电池调度决策的端到端学习,为电力系统动态响应提供新思路。如何在不同规模数据中心验证该模型对电网爬坡风险的适应性,是值得进一步研究的问题。

Published
2026-11-10
Authors
Xinda Zheng, Canchen Jiang, Frits de Nijs, Edward Lam, Markus Wagner
Theme
算电协同
Abstract

Rapid AI data-center power fluctuations challenge grid integration. Sustained grid-import smoothing requires allocating limited battery power and energy under uncertain demand. We formulate risk-aware BESS scheduling that coordinates advance reserve commitments and demand-responsive dispatch, accounting for operating costs, grid-ramp penalties, and their conditional value-at-risk. We develop battery scheduling decision-focused learning (BS-DFL) with a constraint-aware neural optimization layer trained directly from this objective without optimal-solution labels. The trained layer is then frozen to guide demand-predictor learning through scheduling costs and ramping risk, enabling solver-free rolling-horizon scheduling. In a 10,000-minute simulation using loads derived from measured AI workloads, BS-DFL reduces mean absolute minute-to-minute grid-import changes by 71.70% and total scheduling cost by 18.01% relative to an MSE-trained predictor coupled with a mixed-integer linear programming solver, with an average decision time of 18.77 ms.

Chinese interpretation

本文针对人工智能数据中心电网输入波动问题,提出基于神经优化层的电池调度决策方法。通过风险感知模型协调储备与调度,利用约束感知神经网络直接从目标函数训练,无需最优解标签。该方法在仿真中显著降低电网输入波动和调度成本,验证了决策聚焦学习在电力系统中的有效性。以上判断仅依据摘要,方法细节与适用条件请核验原文。

Reference

Xinda Zheng, Canchen Jiang, Frits de Nijs, 等. Decision-Focused Learning via Neural Optimization Layers for Battery-Assisted Grid-Import Smoothing in AI Data Centers[J/OL]. (2026-11-10)[2026-11-13]. http://arxiv.org/abs/2611.13694v1.

arXiv Open Chinese poster
Video B

Cooling Distribution Unit (CDU) Explained | Liquid Cooling in AI Data Cen…

We build data centres · Query: data center liquid cooling conference presentation。Useful as technical or research context.

Expand

Cooling Distribution Unit (CDU) Explained | Liquid Cooling in AI Data Centres

学术会议报告 · We build data centres · Query:data center liquid cooling conference presentation

Open on YouTube
Video B

Data Center Cooling - A thermal efficiency approach

Anixter · Query: data center thermal management seminar。Useful as technical or research context.

Expand

Data Center Cooling - A thermal efficiency approach

专家讲座 · Anixter · Query:data center thermal management seminar

Open on YouTube
Video B

Data Centers and Energy A Global Challenge

space FACTS004 · Query: data center thermal management seminar。Useful as technical or research context.

Expand

Data Centers and Energy A Global Challenge

专家讲座 · space FACTS004 · Query:data center thermal management seminar

Open on YouTube
Video B

How Meta's AI Data Centers use Liquid Cooling

Tom Shaw · Query: data center liquid cooling conference presentation。Useful as technical or research context.

Expand

How Meta's AI Data Centers use Liquid Cooling

学术会议报告 · Tom Shaw · Query:data center liquid cooling conference presentation

Open on YouTube
Video B

Vertiv Investor Conference 2026 | Data Center Liquid Cooling Production S…

i101 · Query: data center liquid cooling conference presentation。Useful as technical or research context.

Expand

Vertiv Investor Conference 2026 | Data Center Liquid Cooling Production Scales For AI Systems

学术会议报告 · i101 · Query:data center liquid cooling conference presentation

Open on YouTube
Topic B

电力并网与能源约束

Same-source item from the Chinese report. Verify details against the original linked source: 电力并网与能源约束

展开全文
TopicB

电力并网与能源约束

Details

This topic recorded 12 hits with a heat score of 41. Use it as a research and monitoring keyword rather than a factual conclusion.

Topic B

智算中心 CapEx/扩建

Same-source item from the Chinese report. Verify details against the original linked source: 智算中心 CapEx/扩建

展开全文
TopicB

智算中心 CapEx/扩建

Details

This topic recorded 7 hits with a heat score of 25. Use it as a research and monitoring keyword rather than a factual conclusion.

Topic B

液冷路线(冷板/浸没/两相)

Same-source item from the Chinese report. Verify details against the original linked source: 液冷路线(冷板/浸没/两相)

展开全文
TopicB

液冷路线(冷板/浸没/两相)

Details

This topic recorded 1 hits with a heat score of 4. Use it as a research and monitoring keyword rather than a factual conclusion.

Industry

Industry

Industry news, products, policy, financing, projects, and market-oriented videos.

Industry S

AI 算力基础设施动态:NVIDIA Blog 发布相关报道(原文标题:From Chips to Skills, NVIDIA and Kore…

Same-source item from the Chinese report. Verify details against the original linked source: AI 算力基础设施动态:NVIDIA Blog 发布相关报道(原文标题:Fr…

展开全文
IndustryS

AI 算力基础设施动态:NVIDIA Blog 发布相关报道(原文标题:From Chips to Skills, NVIDIA and Korea Expand Sovereign AI Collaboration)

Summary

发布时间:2026-11-09;近 7 天补充观察,非 24 小时窗口内;细节以来源原文为准,本页不复述未核验扩展信息

Entities
NVIDIA
Metrics / amount
No reliable data
Source
NVIDIA Blog
Reading note

Treat amounts, specifications, timing, and order implications as unverified until confirmed by the linked source or an official disclosure.

NVIDIA Blog
Technology S

AI 算力基础设施动态:NVIDIA Blog 发布相关报道(原文标题:NVIDIA Dynamo Recipes Bring Korea’s L…

Same-source item from the Chinese report. Verify details against the original linked source: AI 算力基础设施动态:NVIDIA Blog 发布相关报道(原文标题:NV…

展开全文
TechnologyS

AI 算力基础设施动态:NVIDIA Blog 发布相关报道(原文标题:NVIDIA Dynamo Recipes Bring Korea’s Leading Open Models to Production)

Summary

发布时间:2026-11-09;近 7 天补充观察,非 24 小时窗口内;细节以来源原文为准,本页不复述未核验扩展信息

Entities
NVIDIA
Metrics / amount
No reliable data
Source
NVIDIA Blog
Reading note

Treat amounts, specifications, timing, and order implications as unverified until confirmed by the linked source or an official disclosure.

NVIDIA Blog
Industry A

数据中心产业动态:Data Center Dynamics 发布相关报道(原文标题:Forest County Potawatomi Commun…

Same-source item from the Chinese report. Verify details against the original linked source: 数据中心产业动态:Data Center Dynamics 发布相关报道(原…

展开全文
IndustryA

数据中心产业动态:Data Center Dynamics 发布相关报道(原文标题:Forest County Potawatomi Community seeks to expand Milwaukee data center)

Summary

发布时间:2026-11-13;检索窗口内;细节以来源原文为准,本页不复述未核验扩展信息

Entities
No reliable data
Metrics / amount
No reliable data
Source
Data Center Dynamics
Reading note

Treat amounts, specifications, timing, and order implications as unverified until confirmed by the linked source or an official disclosure.

Data Center Dynamics
Industry A

智算中心/数据中心建设进展:Data Center Dynamics 发布相关报道,涉及 1.4GW(原文标题:CDC files to deve…

Same-source item from the Chinese report. Verify details against the original linked source: 智算中心/数据中心建设进展:Data Center Dynamics 发布相…

展开全文
IndustryA

智算中心/数据中心建设进展:Data Center Dynamics 发布相关报道,涉及 1.4GW(原文标题:CDC files to develop 1.4GW data center campus in Kemps Creek, Australia)

Summary

发布时间:2026-11-13;检索窗口内;可核验指标:1.4GW;细节以来源原文为准,本页不复述未核验扩展信息

Entities
No reliable data
Metrics / amount
1.4GW
Source
Data Center Dynamics
Reading note

Treat amounts, specifications, timing, and order implications as unverified until confirmed by the linked source or an official disclosure.

Data Center Dynamics
Industry A

数据中心产业动态:Data Center Dynamics 发布相关报道(原文标题:Sponsored: Cooling orchestratio…

Same-source item from the Chinese report. Verify details against the original linked source: 数据中心产业动态:Data Center Dynamics 发布相关报道(原…

展开全文
IndustryA

数据中心产业动态:Data Center Dynamics 发布相关报道(原文标题:Sponsored: Cooling orchestration software: A welcome addition to AI data center operations)

Summary

发布时间:2026-11-13;检索窗口内;细节以来源原文为准,本页不复述未核验扩展信息

Entities
No reliable data
Metrics / amount
No reliable data
Source
Data Center Dynamics
Reading note

Treat amounts, specifications, timing, and order implications as unverified until confirmed by the linked source or an official disclosure.

Data Center Dynamics
Industry A

数据中心产业动态:The Register 发布相关报道(原文标题:Russian cloud Yandex says drone attacks…

Same-source item from the Chinese report. Verify details against the original linked source: 数据中心产业动态:The Register 发布相关报道(原文标题:Russ…

展开全文
IndustryA

数据中心产业动态:The Register 发布相关报道(原文标题:Russian cloud Yandex says drone attacks on its datacenters caused data loss)

Summary

发布时间:2026-11-12;检索窗口内;细节以来源原文为准,本页不复述未核验扩展信息

Entities
No reliable data
Metrics / amount
No reliable data
Source
The Register
Reading note

Treat amounts, specifications, timing, and order implications as unverified until confirmed by the linked source or an official disclosure.

The Register
Industry A

AI 算力基础设施动态:Data Center Knowledge 发布相关报道(原文标题:Huang Resigns: Nvidia's AI …

Same-source item from the Chinese report. Verify details against the original linked source: AI 算力基础设施动态:Data Center Knowledge 发布相关…

展开全文
IndustryA

AI 算力基础设施动态:Data Center Knowledge 发布相关报道(原文标题:Huang Resigns: Nvidia's AI Infrastructure Roadmap in Question)

Summary

发布时间:2026-11-13;检索窗口内;细节以来源原文为准,本页不复述未核验扩展信息

Entities
NVIDIA
Metrics / amount
No reliable data
Source
Data Center Knowledge
Reading note

Treat amounts, specifications, timing, and order implications as unverified until confirmed by the linked source or an official disclosure.

Data Center Knowledge
Industry A

数据中心产业动态:Data Center Knowledge 发布相关报道(原文标题:Building AI Kill Switches in D…

Same-source item from the Chinese report. Verify details against the original linked source: 数据中心产业动态:Data Center Knowledge 发布相关报道(…

展开全文
IndustryA

数据中心产业动态:Data Center Knowledge 发布相关报道(原文标题:Building AI Kill Switches in Data Centers)

Summary

发布时间:2026-11-09;近 7 天补充观察,非 24 小时窗口内;细节以来源原文为准,本页不复述未核验扩展信息

Entities
No reliable data
Metrics / amount
No reliable data
Source
Data Center Knowledge
Reading note

Treat amounts, specifications, timing, and order implications as unverified until confirmed by the linked source or an official disclosure.

Data Center Knowledge
Industry A

电力与能源约束观察:Data Center Knowledge 发布相关报道(原文标题:AI’s Expansion Hits the Limit…

Same-source item from the Chinese report. Verify details against the original linked source: 电力与能源约束观察:Data Center Knowledge 发布相关报道…

展开全文
IndustryA

电力与能源约束观察:Data Center Knowledge 发布相关报道(原文标题:AI’s Expansion Hits the Limits of Local Power)

Summary

发布时间:2026-11-06;近 7 天补充观察,非 24 小时窗口内;细节以来源原文为准,本页不复述未核验扩展信息

Entities
No reliable data
Metrics / amount
No reliable data
Source
Data Center Knowledge
Reading note

Treat amounts, specifications, timing, and order implications as unverified until confirmed by the linked source or an official disclosure.

Data Center Knowledge
Technology A

液冷与热管理进展:Data Center Dynamics 发布相关报道(原文标题:Advancing thermal management fo…

Same-source item from the Chinese report. Verify details against the original linked source: 液冷与热管理进展:Data Center Dynamics 发布相关报道(原…

展开全文
TechnologyA

液冷与热管理进展:Data Center Dynamics 发布相关报道(原文标题:Advancing thermal management for the AI era)

Summary

发布时间:2026-11-13;检索窗口内;细节以来源原文为准,本页不复述未核验扩展信息

Entities
No reliable data
Metrics / amount
No reliable data
Source
Data Center Dynamics
Reading note

Treat amounts, specifications, timing, and order implications as unverified until confirmed by the linked source or an official disclosure.

Data Center Dynamics
Technology A

AI 算力基础设施动态:Data Center Dynamics 发布相关报道(原文标题:SpaceX developing custom Nvi…

Same-source item from the Chinese report. Verify details against the original linked source: AI 算力基础设施动态:Data Center Dynamics 发布相关报…

展开全文
TechnologyA

AI 算力基础设施动态:Data Center Dynamics 发布相关报道(原文标题:SpaceX developing custom Nvidia Vera Rubin rack dubbed Kessel for its orbital data centers – report)

Summary

发布时间:2026-11-13;检索窗口内;细节以来源原文为准,本页不复述未核验扩展信息

Entities
NVIDIA
Metrics / amount
No reliable data
Source
Data Center Dynamics
Reading note

Treat amounts, specifications, timing, and order implications as unverified until confirmed by the linked source or an official disclosure.

Data Center Dynamics
Technology A

技术与产品进展:Data Center Dynamics 发布相关报道,涉及 $30bn(原文标题:OpenAI faces civil rack…

Same-source item from the Chinese report. Verify details against the original linked source: 技术与产品进展:Data Center Dynamics 发布相关报道,涉及…

展开全文
TechnologyA

技术与产品进展:Data Center Dynamics 发布相关报道,涉及 $30bn(原文标题:OpenAI faces civil racketeering charges over $30bn data center planned in Effingham County, Georgia)

Summary

发布时间:2026-11-12;检索窗口内;可核验指标:$30bn;细节以来源原文为准,本页不复述未核验扩展信息

Entities
No reliable data
Metrics / amount
$30bn
Source
Data Center Dynamics
Reading note

Treat amounts, specifications, timing, and order implications as unverified until confirmed by the linked source or an official disclosure.

Data Center Dynamics
Technology A

电力与能源约束观察:Data Center Knowledge 发布相关报道(原文标题:Can Optical AI Cut Data Cente…

Same-source item from the Chinese report. Verify details against the original linked source: 电力与能源约束观察:Data Center Knowledge 发布相关报道…

展开全文
TechnologyA

电力与能源约束观察:Data Center Knowledge 发布相关报道(原文标题:Can Optical AI Cut Data Center Inference Power Use?)

Summary

发布时间:2026-11-07;近 7 天补充观察,非 24 小时窗口内;细节以来源原文为准,本页不复述未核验扩展信息

Entities
No reliable data
Metrics / amount
No reliable data
Source
Data Center Knowledge
Reading note

Treat amounts, specifications, timing, and order implications as unverified until confirmed by the linked source or an official disclosure.

Data Center Knowledge
Technology A

电力与能源约束观察:HPCwire 发布相关报道(原文标题:Axelera AI Unveils Titania Architecture Ahe…

Same-source item from the Chinese report. Verify details against the original linked source: 电力与能源约束观察:HPCwire 发布相关报道(原文标题:Axelera …

展开全文
TechnologyA

电力与能源约束观察:HPCwire 发布相关报道(原文标题:Axelera AI Unveils Titania Architecture Ahead of SC26)

Summary

发布时间:2026-11-13;检索窗口内;细节以来源原文为准,本页不复述未核验扩展信息

Entities
No reliable data
Metrics / amount
No reliable data
Source
HPCwire
Reading note

Treat amounts, specifications, timing, and order implications as unverified until confirmed by the linked source or an official disclosure.

HPCwire
Policy A

AI 算力基础设施动态:ServeTheHome 发布相关报道(原文标题:This is the Meta MetaRoCE Network Ad…

Same-source item from the Chinese report. Verify details against the original linked source: AI 算力基础设施动态:ServeTheHome 发布相关报道(原文标题:T…

展开全文
PolicyA

AI 算力基础设施动态:ServeTheHome 发布相关报道(原文标题:This is the Meta MetaRoCE Network Adapter)

Summary

发布时间:2026-11-12;检索窗口内;细节以来源原文为准,本页不复述未核验扩展信息

Entities
No reliable data
Metrics / amount
No reliable data
Source
ServeTheHome
Reading note

Treat amounts, specifications, timing, and order implications as unverified until confirmed by the linked source or an official disclosure.

ServeTheHome
Policy A

电力与能源约束观察:Data Center Knowledge 发布相关报道(原文标题:The Rural Shift in Data Cente…

Same-source item from the Chinese report. Verify details against the original linked source: 电力与能源约束观察:Data Center Knowledge 发布相关报道…

展开全文
PolicyA

电力与能源约束观察:Data Center Knowledge 发布相关报道(原文标题:The Rural Shift in Data Center Development)

Summary

发布时间:2026-11-11;近 7 天补充观察,非 24 小时窗口内;细节以来源原文为准,本页不复述未核验扩展信息

Entities
No reliable data
Metrics / amount
No reliable data
Source
Data Center Knowledge
Reading note

Treat amounts, specifications, timing, and order implications as unverified until confirmed by the linked source or an official disclosure.

Data Center Knowledge
Financing A

财报与资本开支观察:Data Center Dynamics 发布相关报道,涉及 $12bn(原文标题:Nebius signs $12bn in…

Same-source item from the Chinese report. Verify details against the original linked source: 财报与资本开支观察:Data Center Dynamics 发布相关报道,…

展开全文
FinancingA

财报与资本开支观察:Data Center Dynamics 发布相关报道,涉及 $12bn(原文标题:Nebius signs $12bn in deals for Q3, all deals reportedly cover its capex)

Summary

发布时间:2026-11-13;检索窗口内;可核验指标:$12bn;细节以来源原文为准,本页不复述未核验扩展信息

Entities
No reliable data
Metrics / amount
$12bn
Source
Data Center Dynamics
Reading note

Treat amounts, specifications, timing, and order implications as unverified until confirmed by the linked source or an official disclosure.

Data Center Dynamics
Project A

电力与能源约束观察:Data Center Knowledge 发布相关报道(原文标题:New Approaches to Data Center…

Same-source item from the Chinese report. Verify details against the original linked source: 电力与能源约束观察:Data Center Knowledge 发布相关报道…

展开全文
ProjectA

电力与能源约束观察:Data Center Knowledge 发布相关报道(原文标题:New Approaches to Data Center Power Procurement)

Summary

发布时间:2026-11-12;检索窗口内;细节以来源原文为准,本页不复述未核验扩展信息

Entities
No reliable data
Metrics / amount
No reliable data
Source
Data Center Knowledge
Reading note

Treat amounts, specifications, timing, and order implications as unverified until confirmed by the linked source or an official disclosure.

Data Center Knowledge
Project A

项目、采购或专利线索:Data Center Knowledge 发布相关报道(原文标题:Winning Data Center Bids Sta…

Same-source item from the Chinese report. Verify details against the original linked source: 项目、采购或专利线索:Data Center Knowledge 发布相关报…

展开全文
ProjectA

项目、采购或专利线索:Data Center Knowledge 发布相关报道(原文标题:Winning Data Center Bids Starts with the Investment Tax Credit)

Summary

发布时间:2026-11-11;近 7 天补充观察,非 24 小时窗口内;细节以来源原文为准,本页不复述未核验扩展信息

Entities
No reliable data
Metrics / amount
No reliable data
Source
Data Center Knowledge
Reading note

Treat amounts, specifications, timing, and order implications as unverified until confirmed by the linked source or an official disclosure.

Data Center Knowledge
Video B

Great Debate: How AI Infrastructure Is Hitting the Scale Wall

TechArena · Query: AI infrastructure datacenter panel discussion。Useful for product, market, or deployment context.

Expand

Great Debate: How AI Infrastructure Is Hitting the Scale Wall

专家圆桌 · TechArena · Query:AI infrastructure datacenter panel discussion

Open on YouTube
Video B

HPC Hoses | Data center cooling solutions - Tudertechnica

Tudertechnica · Query: high performance computing data center cooling workshop。Useful for product, market, or deployment context.

Expand

HPC Hoses | Data center cooling solutions - Tudertechnica

技术研讨会 · Tudertechnica · Query:high performance computing data center cooling workshop

Open on YouTube
Video B

Immersion Cooling Explained | The Future of AI Data Centre Cooling

We build data centres · Query: high performance computing data center cooling workshop。Useful for product, market, or deployment co…

Expand

Immersion Cooling Explained | The Future of AI Data Centre Cooling

技术研讨会 · We build data centres · Query:high performance computing data center cooling workshop

Open on YouTube
Heat score B

产业热度指数 10/10

Same-source item from the Chinese report. Verify details against the original linked source: 产业热度指数 10/10

展开全文
Heat scoreB

Industry heat score 10/10

Details

The score reflects source coverage and topic density across 27 observed items. It is not an investment signal.

Carryover B

NVIDIA Blackwell/GB200/GB300

Same-source item from the Chinese report. Verify details against the original linked source: NVIDIA Blackwell/GB200/GB300

Expand
CarryoverB

NVIDIA Blackwell/GB200/GB300

Details

昨日热度高,今日暂无新增高可信条目

Carryover B

AI 芯片供给与交付

Same-source item from the Chinese report. Verify details against the original linked source: AI 芯片供给与交付

展开全文
CarryoverB

AI 芯片供给与交付

Details

昨日热度高,今日暂无新增高可信条目

Carryover B

智算中心 CapEx/扩建

Same-source item from the Chinese report. Verify details against the original linked source: 智算中心 CapEx/扩建

展开全文
CarryoverB

智算中心 CapEx/扩建

Details

今日延续上榜

4. Video signals

Cooling Distribution Unit (CDU) Explained | Liquid Cooling in AI Data Centres

学术会议报告 · We build data centres · Query: data center liquid cooling conference presentation

Open on YouTube

Data Center Cooling - A thermal efficiency approach

专家讲座 · Anixter · Query: data center thermal management seminar

Open on YouTube

Data Centers and Energy A Global Challenge

专家讲座 · space FACTS004 · Query: data center thermal management seminar

Open on YouTube

Great Debate: How AI Infrastructure Is Hitting the Scale Wall

专家圆桌 · TechArena · Query: AI infrastructure datacenter panel discussion

Open on YouTube

How Meta's AI Data Centers use Liquid Cooling

学术会议报告 · Tom Shaw · Query: data center liquid cooling conference presentation

Open on YouTube

HPC Hoses | Data center cooling solutions - Tudertechnica

技术研讨会 · Tudertechnica · Query: high performance computing data center cooling workshop

Open on YouTube

Vertiv Investor Conference 2026 | Data Center Liquid Cooling Production Scales For AI Systems

学术会议报告 · i101 · Query: data center liquid cooling conference presentation

Open on YouTube

Immersion Cooling Explained | The Future of AI Data Centre Cooling

技术研讨会 · We build data centres · Query: high performance computing data center cooling workshop

Open on YouTube

Sources

Collection notes

  • 当前自动化环境未配置 Tavily、Bing News 或 SerpAPI 检索密钥;脚本将使用公开 RSS/Atom、公共 arXiv 接口与固定监测源,不会编造产业新闻。
  • 论文池:已从本地论文池读取 33 条候选;池更新时间 2026-11-13 16:46。
  • 论文中文增强:0 篇通过 Cloudflare 模型校验(Qwen 主模型,GLM 备用;备用 0 篇),复用 8 篇与原文一致的中文缓存;新增 0 篇研究启示。
  • AI 分析:已使用 Cloudflare @cf/qwen/qwen3-30b-a3b-fp8 生成中文结构化研判;仅依据列出的来源材料,模型不作为事实来源。
Data Center Dynamics Forest County Potawatomi Community seeks to expand Milwaukee data center Credibility: A Data Center Dynamics CDC files to develop 1.4GW data center campus in Kemps Creek, Australia Credibility: A Data Center Dynamics Nebius signs $12bn in deals for Q3, all deals reportedly cover its capex Credibility: A Data Center Dynamics Advancing thermal management for the AI era Credibility: A Data Center Dynamics SpaceX developing custom Nvidia Vera Rubin rack dubbed Kessel for its orbital data centers – report Credibility: A Data Center Dynamics Sponsored: Cooling orchestration software: A welcome addition to AI data center operations Credibility: A Data Center Dynamics OpenAI faces civil racketeering charges over $30bn data center planned in Effingham County, Georgia Credibility: A The Register Russian cloud Yandex says drone attacks on its datacenters caused data loss Credibility: A ServeTheHome This is the Meta MetaRoCE Network Adapter Credibility: A Data Center Knowledge Huang Resigns: Nvidia's AI Infrastructure Roadmap in Question Credibility: A Data Center Knowledge New Approaches to Data Center Power Procurement Credibility: A Data Center Knowledge The Rural Shift in Data Center Development Credibility: A Data Center Knowledge Winning Data Center Bids Starts with the Investment Tax Credit Credibility: A Data Center Knowledge Building AI Kill Switches in Data Centers Credibility: A Data Center Knowledge Can Optical AI Cut Data Center Inference Power Use? Credibility: A Data Center Knowledge AI’s Expansion Hits the Limits of Local Power Credibility: A HPCwire Axelera AI Unveils Titania Architecture Ahead of SC26 Credibility: A NVIDIA Blog From Chips to Skills, NVIDIA and Korea Expand Sovereign AI Collaboration Credibility: S NVIDIA Blog NVIDIA Dynamo Recipes Bring Korea’s Leading Open Models to Production Credibility: S arXiv Locked In: Multi-Objective RL for the AI Data Center Build-Out Credibility: S arXiv Real-Time Nonlinear Mixed-Integer Model Predictive Control With Horizon-Tail Relaxations Credibility: S arXiv Impact of Grid-Interactive Data Center Microgrids on Grid Reliability Credibility: S arXiv Speed-to-Power Dominates Energy Costs for AI Data Centers: Technoeconomic Analysis of Powering AI in the Continental United States Credibility: S arXiv Can STATCOM and UPS-Based Voltage Support Mitigate Fault-Induced Reductions in AI Data Center Grid Power Draw? Credibility: S arXiv Scalable Reference Electrical Architectures for Modern Data Centers Credibility: S arXiv Assessing Data Center Hosting Capacity Considering Electromagnetic Transient Dynamics Credibility: S arXiv Decision-Focused Learning via Neural Optimization Layers for Battery-Assisted Grid-Import Smoothing in AI Data Centers Credibility: S arXiv 计算机科学 https://arxiv.org/search/cs?query=data+center+cooling+liquid+thermal&searchtype=all Credibility: S NVIDIA 数据中心 https://www.nvidia.com/en-us/data-center/ Credibility: S 开放计算项目 OCP https://www.opencompute.org/ Credibility: S ASHRAE 技术资源 https://www.ashrae.org/technical-resources Credibility: S 工信部 https://www.miit.gov.cn/ Credibility: S 中国信通院 https://www.caict.ac.cn/ Credibility: S Data Center Dynamics https://www.datacenterdynamics.com/en/rss/ Credibility: A The Register https://www.theregister.com/headlines.atom Credibility: A ServeTheHome https://www.servethehome.com/feed/ Credibility: A Data Center Knowledge https://www.datacenterknowledge.com/rss.xml Credibility: A HPCwire https://www.hpcwire.com/feed/ Credibility: A NVIDIA Blog https://blogs.nvidia.com/feed/ Credibility: S